--- title: Milner Zoning Ordinance, Sec. 118-467. Development standards for utility installations collection: local-codes id: local-code:milner/zoning/118-467 cite_as: Milner, Ga., Zoning Ordinance § 118-467 canonical_url: https://georgiacommons.org/code/local/milner/zoning/118-467 md_url: https://georgiacommons.org/code/local/milner/zoning/118-467.md text_url: https://georgiacommons.org/code/local/milner/zoning/118-467/text source_url: https://library.municode.com/ga/milner date: 2026-11-11 status: active jurisdiction: city:milner jurisdiction_name: Milner place_fips: "1351604" corpus_version: local-codes-milner-69d5170e2358 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/milner/zoning/~part-ii/~part-b/~chapter-118/~article-vi/~division-4.md previous: https://georgiacommons.org/code/local/milner/zoning/118-466.md next: https://georgiacommons.org/code/local/milner/zoning/118-468.md index: https://georgiacommons.org/code/local/milner.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:milner/zoning/118-467@2026-11-11-d0ec5c9191 --- # Milner Zoning Ordinance, Sec. 118-467. Development standards for utility installations > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 118 - ZONING / Article VI - COMMERCIAL/INDUSTRIAL DEVELOPMENT ORDINANCE OF THE CITY OF MILNER, GEORGIA / Division 4 - GENERAL PROCEDURES (a) Utility easements. When it is found to be necessary and desirable to locate public utility lines in other than street rights-of-way, easements must be shown on the plat for utility purposes. Such easements must not be less than 20 feet wide and, where possible, must be centered on rear or side lot lines. All utility easements shall comply with the minimum standards as specified by the utility provider. (b) Water supply systems. (1) Public water system. If available, the proposed development must be connected to a public water supply and water mains, fire hydrants and stub connections must be shown on the construction plans. (2) Private water supply system. If public water supply is not available, the developer may install a private water system developed according to plans and specifications shown on the approved construction plans and approved by the city. (c) Sanitary sewer disposal systems. (1) Public sewage system. If available, the proposed development must be connected to a public sewage system and sewage mains and stub connections must be shown on the construction plans. If a lift station is required the developer must pay the cost of the station. (2) Individual sewage system. When a public sewage system is not available the developer must carefully consider the capability and suitability of the general area of the property to support an individual sewage system (septic tanks). Such proposed sewage system must be approved by the Lamar County Health Department. The city must consider the recommendation of the Lamar County Health Department regarding any proposed private sewage systems in approval of the construction plans. ## History (Ord. No. 2009-3, § 1(408), 11-16-2009)