--- title: Milner Zoning Ordinance, Sec. 118-468. Development standards for drainage facilities collection: local-codes id: local-code:milner/zoning/118-468 cite_as: Milner, Ga., Zoning Ordinance § 118-468 canonical_url: https://georgiacommons.org/code/local/milner/zoning/118-468 md_url: https://georgiacommons.org/code/local/milner/zoning/118-468.md text_url: https://georgiacommons.org/code/local/milner/zoning/118-468/text source_url: https://library.municode.com/ga/milner date: 2026-11-11 status: active jurisdiction: city:milner jurisdiction_name: Milner place_fips: "1351604" corpus_version: local-codes-milner-69d5170e2358 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/milner/zoning/~part-ii/~part-b/~chapter-118/~article-vi/~division-4.md previous: https://georgiacommons.org/code/local/milner/zoning/118-467.md next: https://georgiacommons.org/code/local/milner/zoning/118-469.md index: https://georgiacommons.org/code/local/milner.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:milner/zoning/118-468@2026-11-11-e3b71ae2fb --- # Milner Zoning Ordinance, Sec. 118-468. Development standards for drainage facilities > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part B - LAND DEVELOPMENT REGULATIONS / Chapter 118 - ZONING / Article VI - COMMERCIAL/INDUSTRIAL DEVELOPMENT ORDINANCE OF THE CITY OF MILNER, GEORGIA / Division 4 - GENERAL PROCEDURES (a) Watercourse and drainage easements. Where a proposed development is traversed by a watercourse, drainage way or stream, appropriate provisions must be made to accommodate stormwater and drainage through and from the proposed development. Such an easement must conform substantially with the lines of the watercourse and be wide enough and of adequate construction to be satisfactory for the purpose. (b) Detention facility maintenance. (1) The stormwater detention storage capacity or function of any detention basin, pond or other impoundment, whether natural of manmade, shall not be removed or diminished without the city's express approval. (2) It shall be the responsibility of the property owner to maintain the operational characteristics of any stormwater detention facility construction in the development pursuant to the requirements of this article and/or any other regulation enacted by the city for such purpose, and to maintain the detention facility free of obstruction, silt or debris. The detention facility perimeter must be fenced with six-foot-high fence. (3) A certified record survey of each detention facility shall be prepared by a land surveyor currently registered in the State of Georgia. A certified record drawing of the facility shall be prepared based upon the survey. Based on the actual parameters established on the record drawing, an addendum to the stormwater management report shall be prepared which demonstrates that the facility, as constructed, complies with the requirements of this article and/or any other regulation enacted by the city for such purpose. The amendment stormwater management report shall be certified by a professional engineer currently registered in the State of Georgia, in accordance with the provisions of Georgia law. Such certification shall substantially comply with the following form: Detention Pond Certification Form Date: To: CITY OF MILNER BUILDING INSPECTION DEPARTMENT Project Name: Designed Storage Volume: As Built Storage Volume: (Provide 81 /2 × 11 drawing of designed outlet structure and as build outlet structure.) By placing my professional stamp and signature hereon, I certify that this detention pond is constructed according to the approved design on file with the City of Milner and on record at the City of Milner Building Inspection Department. I further certify that all the drainage area designed to drain to this pond in fact does drain to said pond and the outflow from the pond is equal to or less than the maximum allowable outflow for the 10 and 100 year storm events. Calculations to determine the as-built storage volume shall be maintained by me and provided to City of Milner in the event they are needed by City of Milner to verify this volume capacity. Signature Seal (Ord. No. 2009-3, § 1(409), 11-16-2009)