Skip to content
Georgia Commons
Menu

Mitchell County · Zoning Ordinance

Appendix A - ZONING / Article IX - MHP MANUFACTURED HOME PARK DISTRICT

Sec. 9.05. Other requirements.

About this text

  • As published by Municode, current through 2023-08-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

1. Additions. Any additions to a manufactured home or accessory buildings constructed on a lot shall comply with the requirements of the Mitchell County building ordinance.

2. [Permits and inspections.] Before a certificate of occupancy is issued, the required permits and inspections must be obtained from the building department.

3. Foundations. All main buildings shall be placed on a properly engineered foundation that meets the manufactured home's installation requirements and applicable state and local requirements.

4. Siding material. All manufactured homes shall have exterior siding materials consisting of wood, vinyl, masonry, concrete, stucco, hard board siding, or metal lap.

5. Skirting. All manufactured homes are required to be skirted within 30 days of placement. [See] article V, section 5.16.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:mitchell-county/zoning/9.05@2023-08-08-f51d9f732d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.