When two adjoining properties are dissimilar residential, commercial or industrial zone districts as indicated in Table 34-196.1, the property within the zone district allowing the most intensive uses is required to provide the buffer when acquiring a building permit unless the buffer was pre-existing. When two adjoining vacant parcels are in dissimilar zone districts as indicated in Table 34-196.1, no buffer is required when the parcel zoned for the less intensive use acquires a building permit. (1) Buffer requirement. The required buffer shall consist of plantings or a fence, wall (not otherwise part of a structure or accessory structure), or berm, which meets the screening standards of section 34-198. If plantings are chosen as the method of screening, the planting area shall have a minimum base width of 12 feet. (2) Buffer requirement. The required buffer shall consist of a 50-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings, plus a fence, wall (not otherwise part of a structure or accessory structure), berm, or any combination thereof, which meets the screening standards of section 34-198. (3) Buffer requirement. The required buffer shall consist of a 100-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings, plus a fence, wall (not otherwise part of a structure or accessory structure), berm, or any combination thereof, which meets the screening standards of section 34-198. (4) Buffer requirement. The required buffer shall consist of either an unvegetated 500-foot setback or 200-foot vegetated setback from the adjoining property line. A 200-foot minimum setback shall consist of 75 feet of vegetated buffer area, measured along the entire portion of the property line abutting said use, and such buffer shall extend an additional 100 feet in each direction along the common property line. The 75-foot vegetated buffer shall meet the screening requirements contained in section 34-198.