Mount Zion · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 34 - ZONING / Article XI - ADMINISTRATION
Sec. 34-445. Application for building permit.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
All applications for building permits shall be accompanied by plans drawn to scale, showing the actual dimensions of the lot to be built upon, the sizes and locations on the lot of any existing buildings or structures, the shape, size, height, use and location on the lot of the building or structure proposed to be erected or altered, setback distances, any parking spaces, and such other information as may be necessary to provide for the enforcement of the provisions of this chapter. If no substantial construction progress has been made within six months of the date of the issuance of the building permit, the permit becomes invalid.
History
(Res. of 10-12-2004(3), § 14.13)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.