--- title: Murray County Zoning Ordinance, 4.7-1. AG District collection: local-codes id: local-code:murray-county/zoning/4.7-1 cite_as: Murray County, Ga., Zoning Ordinance § 4.7-1 canonical_url: https://georgiacommons.org/code/local/murray-county/zoning/4.7-1 md_url: https://georgiacommons.org/code/local/murray-county/zoning/4.7-1.md text_url: https://georgiacommons.org/code/local/murray-county/zoning/4.7-1/text source_url: https://library.municode.com/ga/murray_county/codes/code_of_ordinances date: 2025-12-20 status: active jurisdiction: county:murray jurisdiction_name: Murray County county_fips: "13213" corpus_version: local-codes-murray-county-df3ce75ed395 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/murray-county/zoning/~appendix-b/~chapter-2/~article-iv.md previous: https://georgiacommons.org/code/local/murray-county/zoning/article-iv.md next: https://georgiacommons.org/code/local/murray-county/zoning/article-v.md index: https://georgiacommons.org/code/local/murray-county.md branch: zoning edition: As published by Municode, current through 2025-12-20 edition_date_kind: current_through source_publisher: Municode version_id: local-code:murray-county/zoning/4.7-1@2025-12-20-ab6ec25fd6 --- # Murray County Zoning Ordinance, 4.7-1. AG District > As published by Municode, current through 2025-12-20 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - ZONING / Chapter 2 - LAND USE DISTRICT ORDINANCE / Article IV - GENERAL PROVISIONS a. The additional dwellings may be occupied by either blood relatives to the owner of the property and said blood relationships shall extend to but not beyond the second descending and ascending generation, or full time caretaker employees of the property owner who are part of the farming operations and responsible for the agricultural production of the property. b. No commercial use of the second, third, or fourth dwelling will be allowed and no rental charge can be placed on these residential uses. c. Individual power supply sources shall be provided to each dwelling and each utility installation shall meet such standards as have been adopted by local authorities. d. Permits for construction will not be issued prior to the approval of each of the aforementioned conditions by the land development officer. In addition the land development officer must approve changes in use or occupancy. (Ord. No. 53, 8-5-2003; Ord. No. 53, Amend. No. 1, 12-15-2004) [Sec.] 4.8 Number of principal buildings per lot. Except for the following uses, only one principal building, together with its customary accessory buildings, shall be permitted to occupy each lot: •Single family detached dwellings in the agriculture district as specified in [Sec.] 4.7 •Public/institutional buildings. •Multiple-family dwellings in the multi-family residential district. •Commercial/industrial buildings in the neighborhood commercial, highway commercial and industrial districts. The above provisions shall not be construed to allow the erection of any building or portion of a building outside of the buildable area of the lot or the intermingling of uses. (Ord. No. 53, 8-5-2003) [Sec.] 4.9 Use of yards. The minimum yards, parking spaces and open spaces required for each building existing on the effective date of this appendix, or for any building hereafter erected or structurally altered, shall not be encroached upon or considered as part of the yard, parking space or open space required for any other structure, nor shall any lot area be reduced below the lot area per requirements of this appendix for the district in which such lot is located except as otherwise provided in this appendix. (Ord. No. 53, 8-5-2003) [Sec.] 4.10 Requirements for building permit. No building shall be erected, converted, enlarged, reconstructed, moved or structurally altered except upon application for and issuance of a building permit by the Building Inspector. (Ord. No. 53, 8-5-2003) Authority to require county building permit, O.C.G.A. § 36-13-2; county permitting process for mechanical, plumbing and electrical installations, O.C.G.A. § 48-13-29. [Sec.] 4.11 Streets. Traffic control devices. If the traffic to be generated by a use in a non-residential district will demand traffic control devices to insure public safety, the developer shall install such necessary devices. Such determination shall be made by the Murray County Director of Public Works, in consultation with the Georgia Department of Transportation, and approved by the Murray County Commissioner. State Department of Transportation approval. All entrances or exits of any street or drive, public or private, from or to any State highway, or any planned or in progress Department of Transportation reconstruction projects where the State does not own right-of-way, shall be approved by the State Department of Transportation prior to the construction of such street or drive, or the issuance of any development permit for any improvement to be served by such street or drive. ## History (Ord. No. 53, 8-5-2003)