11-3. Application for building permit.

About this text

  • As published by Municode, current through 2021-03-08
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

All applications for building permits, except single-family residential and duplexes, shall be accompanied by two (2) site plans, drawn to scale, showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units the building is designed to accommodate (if applicable), the setback lines of the building on the "permit lot", the various easements on the lot and such other site planning information (i.e., parking spaces, loading space requirements and ingress/egress information) as may be essential for determining whether the provisions of this ordinance are being observed. The above-referenced information is required on the site plan before the site plan is considered by the zoning administrator and any permits are approved.

Single-family residential and duplex site plans need not be drawn to scale, but must be accurate as to dimensions of lot and proposed building.

Any application for a building permit which proposes to develop properties which have been duly identified as having a flood hazard potential must provide adequate technical information based on the flood hazard management requirements of the City of Nashville (please see the Flood Damage Prevention Ordinance, Ordinance No. 2-86, adopted May 12, 1986, as amended) for technical standards and requirements.

The applicant for a building permit shall submit a certificate with his application which certifies that the lot which he proposes to develop is a lot of record. When the lot in question does not meet the lot width and lot area requirements of this ordinance, then the applicant shall certify that such lot was a lot of record prior to the adoption of this ordinance or is a lot which has been created through governmental taking of property.

Any building permit shall become void if the work involved has not begun within six (6) months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six (6) months after the work of development is commenced; provided, that extensions of time and periods not exceeding six (6) months each may be allowed in writing by the zoning administrator. Any unapproved deviation from the site plan shall cause the zoning administrator to not issue a certificate of occupancy.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:nashville/zoning/11-3@2021-03-08-2371152333

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Nashville Zoning Ordinance, 11-3. Application for building permit | Georgia Commons