The following requirements apply to all applications that can be approved by a UDO administrator. Unless specified elsewhere in this section, the procedures for initiation, application, and review of an administrative review are included in the provisions of subsection 104-4(b), common application requirements. (a) Administrative variances. (1) Power to grant administrative variances. The Director shall have the power to grant administrative variances (except for density and use variances) from the development standards as established in the UDO where, in his/her opinion, the intent of the UDO can be achieved, and equal performance obtained by granting an administrative variance. (2) Limitations on administrative variances. The authority to grant administrative variances shall be limited to variances from the following requirements: a. Front yard or yard adjacent to public street—Up to ten percent of the standard required in this UDO. b. Side yard—Up to ten percent of the standard required in this UDO. c. Rear yard—Up to ten percent of the standard required in this UDO. d. Accessory structure placement for lots without a rear yard. e. Reserved. f. Buffers—The dimensions or screening treatment of a buffer as required by the UDO may be reduced by no more than 50 percent where the comprehensive plan recommends a more compatible land use on the neighboring property than that for which said property is actually zoned, or in other situations where the intent of the required buffer can be equally or otherwise achieved; provided, however, that no buffer required as a condition of a rezoning or of a grant of a special use permit shall be modified. g. Reduction in parking spaces—as per the provisions of section 203-10, offstreet automobile parking and loading. h. Reserved. i. Compact parking spaces. j. Excess parking spaces; in case parking exceeds 25 percent of minimum off-street parking requirement k. New construction of a new porch or modifications to an existing porch. l. Roof mounted solar panels located outside the historic district and in compliance with section 202-3(f). (3) Application procedures. a. Application form and documentation. The application for an administrative variance shall be in such a form and contain such information and documentation as shall be prescribed by the Community Development Department, but shall contain at least the following: 1. Name and address of the applicant. 2. Legal description of the subject property. 3. Size of the subject property. 4. A statement of the hardship imposed on the applicant by the zoning ordinance and a statement of why the administrative variance will not be materially detrimental or injurious to other property or improvements in the neighborhood in which the subject property is located. 5. Reserved. 6. A non-refundable application fee shall accompany the application, as established from time to time by the Mayor and City Council, to defray the actual cost of processing the application. 7. A site plan drawn to the requirements of chapter 100, article V, plan submittal requirements. b. Standards for issuance of administrative variances. In deciding whether to grant an application for an administrative variance, the Director of the Community Development Department shall consider all of the applicable standards provided in the UDO and after the Director or his/her designee has sent written notice via U.S. Mail to the property owner of record based on county tax records for all properties within a 100-foot radius from the subject property and allowing those property owners to provide comment to the Director within ten calendar days of the date of the notice. It is the duty of the Director to review such facts, comments, and evidence in light of the general spirit and intent of the UDO to balance the public health, safety, morality, aesthetics, and general welfare of the city and its citizens against the injury to a specific applicant that would result from the strict application of the provisions of the code on the applicant's property, and to determine whether the request conforms to the standards of the review in the UDO. (b) Building permits. (1) Authority. The Building Official shall have the authority to issue a building permit. See chapter 300 for application review standards, building and construction regulations and related procedures. (2) Permit application. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any utility (electrical, gas, mechanical, or plumbing) system, the installation of which is regulated by the technical codes, or to cause any such work to be done, shall first make application to the Building Official and obtain the required permit for the work. (3) Exceptions. Permits shall not be required for the following mechanical work: a. Any portable heating appliance; b. Any portable ventilation equipment; c. Any portable cooling unit; d. Any steam, hot or chilled water piping within any heating or cooling equipment regulated by this Code; e. Replacements of any part which does not alter its approval or make it unsafe; f. Any portable evaporative cooler; and g. Any self-contained refrigeration system containing ten lbs. (4.45 kg) or less of refrigerant and actuated by motors of one horsepower (746W) or less. (4) Work authorized. A building or utility permit shall carry with it the right to construct or install the work, provided the same is described or depicted as required on the drawings and set forth in the specifications filed with the application for the permit. Where such work is not shown on the drawings and covered by the specifications submitted with the application, separate permits shall be required for each subsequent submission. (5) Fees. Permit and inspection fees and any other charges imposed or due under the various construction codes adopted by the city shall be as provided in a fee schedule, approved by the City Council, on file in the Community Development Department office. (6) Minor repairs and routine maintenance. Ordinary minor repairs and routine maintenance may be made with the approval of the Building Official without a permit, provided that such repairs or maintenance shall not violate any of the provisions of the technical codes. (7) Application information required. Each application for a permit, with the required fee, shall be filed with the Building Official on a form furnished for that purpose, and shall contain a general description of the proposed work and its location. The owner, or their authorized agent shall sign the application. The building permit application shall indicate the proposed occupancy of all parts of the building and of that portion of the site or lot, if any, not covered by the building or structure, and shall contain such other information as may be required by the Building Official and the provisions of chapter 300, including but not limited to construction drawings, as the requirements of chapter 100, article V, plan submittal requirements. (8) Time limitations on applications. An application for a permit for any proposed work shall be deemed to have been abandoned six months after the date of the filing for the permit, unless before then a permit has been issued. One or more extensions of time for periods of not more than 90 days each may be allowed by the Building Official for the application, provided the extension is requested in writing and justifiable cause is demonstrated. (9) Subcontractors affidavits. The city accepts electrical, plumbing, mechanical and low voltage affidavits from state licensed contractors subordinate to a building permit. The Building Official may require additional information as deemed necessary when accepting an affidavit. (c) Certificate of appropriateness decisions for minor architectural modifications. (1) The Community Development Director shall have the authority to grant administrative certificate of appropriateness approval for minor architectural modifications. The following types of changes and activities shall be considered minor and shall require administrative approval from the Director: a. Repainting of an existing building to a similar color; b. Revisions of window or door placement; c. The replacement of awnings or installation of new awnings when utilizing two colors or less; d. New construction of a new deck or modifications to an existing deck; and e. Paint colors for existing and infill residential properties in the Norcross Architectural and Site Design Standards Manual. (2) The Community Development Director's approval or denial of a request for the granting of an administrative certificate of appropriateness approval for minor architectural modifications shall weigh the following factors: a. The proposed development of construction meets, or fails to meet, the requirements of the UDO; b. The proposed development or construction is consistent, or inconsistent, with applicable design guidelines; c. The proposed development or construction is consistent, or inconsistent, with the intents or purposes of this UDO; d. The proposed development or construction would result in a development that is architecturally appropriate; and e. The proposed development or construction is consistent with the City's goals and policies concerning the health, safety, morality, aesthetics, and general welfare. In deciding to approve or deny such an application, the Community Development Director shall consult the minutes of the ARB or HPC at which prior approval took place, if applicable. If the application is denied, the reasons for denial shall be provided in writing to the applicant along with a notice that the applicant may file an application for a certificate of appropriateness to the ARB or HPC, as appropriate, to accomplish the requested action if found otherwise to be in compliance with the UDO. (d) Certificate of completion. Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing system, a certificate of completion may be issued by the Building Official. This certificate is proof that a structure or system is complete and, for certain types of permits, is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy. (e) Certificate of occupancy (CO). (1) Building occupancy. A new building shall not be occupied, or a change made in the occupancy, nature or use of a building or part of a building until after the Building Official has issued a certificate of occupancy. Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and released by the Building Official; refer to chapter 300 for details. (2) Issuance. A CO is issued at the completion of a building permit, and a separate application for a CO is not required in these situations. However, an application for a CO may be required for an existing building in some circumstances, see subsection 104-7(f) change of occupancy certificate, or may be requested by an applicant. A certificate of occupancy for any existing building may be obtained by applying to the Building Official and supplying the information and data necessary to determine compliance with the technical codes for the occupancy intended. Where necessary, in the opinion of the Building Official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the technical codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued. (3) Issuing certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the technical codes, reviewed plans and specifications, and after the final inspection, the Building Official shall issue a CO stating the nature of the occupancy permitted. (4) Occupancy limits. Occupancy limits in other than residential buildings shall be determined by the county Fire Marshal. (5) Temporary/partial occupancy. A temporary/partial certificate of occupancy may be issued for a portion of a building, which may safely be occupied prior to final completion of the building. In most cases the county Fire Marshal's temporary certificate of occupancy will be honored. (f) Change of occupancy certificate. (1) A change of occupancy certificate is required for new businesses, business change of name, business change of location, as per the requirements of the International Building Code, section 3408.1. (2) A change of occupancy certificate for any existing building may be obtained by applying to the Building Official and supplying the information and data necessary to determine compliance with the technical codes for the occupancy intended. Where necessary, in the opinion of the Building Official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the technical codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued. (g) Commercial filming permit. (1) The Community Development Director is the commercial filming permit administrator, and all applications for commercial filming permits shall be submitted to the Community Development Office. (2) The City Manager may appoint one or more city employees to form a committee to review the applications and make recommendations to the Community Development Director. (3) The Community Development Director has authority to suspend or revoke any commercial filming permit for failure to strictly follow the requirements of chapter 8, article V, commercial filming activity, in this Code. (4) All application requirements and standards for review of commercial filming permits can be found in chapter 8, article V, commercial filming activity in this Code. (h) Demolition permit. (1) It is unlawful to demolish any house, dwelling or similar structure formerly used for human habitation or any commercial, industrial or other structure formerly used in the conduct of any trade or business without a proper demolition permit. (2) Any violation of this section shall be a continuing violation and each day of the violation shall constitute a new offense. (3) The Building Official is the UDO administrator responsible for issuing demolition permits, except for recognized historic buildings within the city historic districts, and all applications shall be submitted to the Community Development office, following the provisions of chapter 300. (4) Demolition permits for recognized historic buildings within the city historic district, must first be reviewed by the HPC or the ARB, and then final decision is made by Mayor and City Council. (i) Development permit. (1) Development activities authorized. A development permit shall be required to authorize all activities associated with development activity regulated by this UDO, including, but not limited to, clearing and grubbing, grading and the construction of such improvements as streets, surface parking areas and drives, storm water drainage facilities, sidewalks, or other structures permanently placed on or in the property except for buildings, signs, or other structures requiring the issuance of a building permit. (2) Responsibility for development actions. a. No person shall conduct any of the land-disturbing activities identified in this subsection, including grading, clearing and grubbing, tree clearance, land development or project construction (as used in this subsection, "development") without first obtaining a development permit from the Community Development Department to perform such activity. b. Any person proposing development shall first submit to the Community Development Department an application for a development permit, including all construction plans required by this UDO. The application must be authorized by the property owner. c. The Community Development Department is responsible for administering the review and approval process for issuance of development permits. The Community Development Department shall forward a copy of the development permit application, including the construction plans for the project, to other city and county departments, the Soil and Water Conservation Commission District, the Georgia Department of Transportation or others as appropriate, for their review and comment. The Community Development Department shall provide all comments to the applicant for resolution and shall issue the development permit when all requirements of this UDO are met. d. Approval of development plans by the appropriate department or agency shall not imply or transfer acceptance of responsibility for the application of the principles of engineering, architecture, landscape architecture or any other profession, from the professional, corporation or individual under whose hand or supervision the development plans were prepared. e. The completion of inspections of a development and authorization for work continuation shall not transfer responsibility for the quality of the work performed or materials used from the owner, nor imply or transfer acceptance of responsibility for project design or engineering from the professional, corporation or individual under whose hand or supervision the development plans were prepared. f. No development permit shall be interpreted to relieve any owner of the responsibility of maintaining full compliance with all applicable codes, ordinances and other regulations. Any development permit issued in error or in contradiction to the provisions of this UDO shall be considered to have been null and void upon its issuance. g. Liability. 1. The approval of an erosion and sedimentation control plan or other plans under the provisions of this UDO, the issuance of a development permit, or the compliance with any other provisions of this UDO shall not relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the City Council for damage to any person or property. 2. The fact that any activity for which a development permit has been issued results in injury to the property of another shall neither constitute proof of, nor create a presumption of, a violation of the standards provided for in this UDO or the terms of the development permit. (3) Development permit application requirements. a. The application for a development permit shall be submitted to the Community Development Department in a digital format (unless otherwise required by the city) and must include the following: 1. Application on the form furnished by the Community Development Department, requesting review for issuance of a development permit. 2. Three copies of: i. The preliminary plat, once appropriately reviewed and approved at all levels, or site plan requesting or reflecting project approval by the Community Development Department. ii. The construction plans prepared in conformance with the specifications and standards in this UDO, section 105-4. 3. Two copies of the hydrology study. 4. One copy of the soil tests (if applicable). 5. Payment of any development permit fee. b. The application will be checked for completeness within five business days of its submission. Incomplete applications will be returned to the applicant. c. Upon acceptance of a development permit application, the UDO administrator shall: 1. Refer the soil erosion and sedimentation control plan to the county Department of Water Resources and the Soil and Water Conservation District for their review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. No development permit will be issued unless the plan has been approved by the District and the county Department of Water Resources, and any variances and bonding, if required, have been obtained. 2. Refer the stormwater management plan and the floodplain management/ flood damage prevention plan (if any) to the county Department of Water Resources for its review and approval or disapproval. No development permit will be issued unless the plans have been approved by the county Department of Water Resources. d. The applicant may be required by the UDO administrator to secure development approval from other agencies if they are affected by the development. Development approval may be required from but not limited to: 1. Fire Marshal. 2. County Health Department. 3. Georgia Department of Transportation. 4. Georgia Department of Natural Resources. 5. U.S. Army Corps of Engineers. 6. U.S. Environmental Protection Agency. e. The applicant will be responsible for compliance with all codes, regulations and zoning requirements and for the satisfaction of all the comments received. The owner will also be responsible for obtaining approval from all other agencies affected by the project. f. No development permit will be issued unless the applicant provides a statement by the county Tax Commissioner's office certifying that all ad valorem taxes levied against the property and due and owing have been paid. (4) Issuance of development permit. a. Following satisfaction of all comments, receipt of approvals from all affected agencies and receipt of all required bonds, the Community Development Department shall obtain signatures from all involved agencies on three sets of plans and return the signed sets of plans to the engineer/surveyor. The engineer/surveyor shall then provide the Community Development Department with a digital copy of the plans including a scanned image of the cover sheet with all signatures. The image files shall be in a .TIF format unless otherwise specified by the Community Development Director. After obtaining the digital copy, the Community Development Department shall issue a development permit authorizing development activity to begin based on the approved construction plans. b. Permits shall be issued or denied as soon as practicable, but in any event not later than 60 days after receipt by the city of a complete application, providing variances and bonding are obtained, where necessary. c. If the tract is to be developed in phases, then a separate permit shall be required for each phase. (5) Expiration of development permit. a. A development permit shall expire if the development activity described in the permit is not begun within six months from the date of issuance. Any such expired permit may be renewed by the Community Development Department within six months of development expiration, subject to permit renewal approval by the county Department of Water Resources. If a development permit has expired for more than 6 months, the applicant shall be required to apply for a new development permit under the development permit approval process of this UDO. b. Every permit or renewal thereof shall be valid for a period of one year, if not sooner renewed, terminated, revoked, or surrendered. Permits shall be eligible for renewal within 60 days prior to expiration. The city may refuse renewal based on materially changed land conditions or based on any ground that would be the basis for revocation of the active permit. c. Any change or amendment of design and construction plans for the project that may materially impact or negate the permit based on original approval of the plan shall require a permit amendment. All amendments shall be applied for in writing and follow the same procedure for approval as original applications for a development permit. (j) Clearing permit, clearing and grubbing permit and grading permit. The following permits covering portions of the land development process may be issued in accordance with the requirements of this UDO and the provisions of any Metropolitan River Protection Act Certificate, if applicable: (1) Clearing permit. a. A permit limited to clearing only with no grubbing or other land disturbance except for such activities necessary to install and maintain erosion and sediment control practices (as defined in the Georgia Soil Erosion and Sedimentation Act) may be authorized upon identification of the property, a specimen tree survey, the limits of the area to be cleared, the type of activities to be undertaken and the following items may be required: 1. Soil Erosion, Sedimentation and Pollution Control Plan (unless exempt under chapter 400 of this UDO). 2. Hydrology Study if a Soil Erosion, Sedimentation and Pollution Control Plan is required. 3. Specimen Tree Concept Plan (if specimen trees are present on the property). 4. Tree Preservation and/or Replacement Plan as may be required under chapter 630 of this UDO. 5. All clearing activities are to be consistent with the provisions of this UDO, chapter 400 of this UDO, and any conditions of zoning approval. If clearing of the required tree density units is proposed, a performance bond and a development performance agreement may be required prior to issuance of permit to guarantee tree replacement will occur in future phases. b. A clearing permit shall expire unless activities are commenced within 60 consecutive calendar days of issuance of the permit or if activities lapse and are abandoned for a period exceeding 30 consecutive calendar days. c. A clearing permit shall not be construed as approval of or authorization to construct any improvements, buildings, or other structures on the property. d. If landscape improvements are required by the land disturbance permit, then all plantings must be completed, or a performance bond shall be filed for the incomplete work prior to the closing of such permit. (2) Clearing and grubbing permit. a. A permit limited to clearing and grubbing only may be authorized upon identification of the property, a specimen tree survey, the limits of the area to be cleared and grubbed, the type of activities to be undertaken, and the following items may be required: 1. Soil Erosion, Sedimentation and Pollution Control Plan. 2. Hydrology Study. 3. Specimen Tree Concept Plan (if specimen trees are present on the property). 4. Tree Preservation and/or Replacement Plan as may be required under chapter 630 of this UDO. Appropriate soil erosion, sedimentation and pollution control and tree protection measures shall be placed and maintained as required. If clearing of the required tree density units is proposed, a performance bond and a development performance agreement may be required prior to issuance of permit to guarantee tree replacement will occur in future phases. b. A permit for clearing and grubbing shall expire unless activities are commenced within 60 consecutive calendar days of issuance of the permit or if activities lapse and the project is abandoned for a period exceeding 30 consecutive calendar days. c. A clearing and grubbing permit shall be limited to the removal of vegetation and stumps and the placement of required tree protection measures and soil erosion and sedimentation facilities and may authorize the removal of existing stormwater facilities and infrastructure on the property at the option of the developer. A demolition permit is required to remove all other existing structures. No grading or construction activities may be started under a clearing and grubbing permit except for such activities necessary to install and maintain erosion and sediment control practices. The approval of a clearing and grubbing permit shall not imply the approval of or authorization to construct any improvements, buildings, or other structures on the property. d. If landscape improvements are required by the land disturbance permit, then all plantings must be completed, or a performance bond shall be filed for the incomplete work prior to the closing of such permit. (3) Grading permit. a. A grading permit, which may include clearing and grubbing, may be issued prior to approval of a development permit, as provided under chapter 330-20 of this UDO. A grading permit may also be issued for earth borrow or storage, where no development or construction is proposed or imminent, based on approval of a grading plan, Soil erosion, sedimentation and pollution control plan, and hydrology study, consistent with the requirements of chapter 400, the zoning category of the site, and the provisions of the Gwinnett County 2030 Unified Plan (as applicable). A specimen tree survey, a specimen tree concept plan, and a tree preservation and/or replacement plan may be required as specified under chapter 630 of this UDO. If clearing of the required tree density units is proposed, a performance bond and a development performance agreement may be required prior to issuance of permit to guarantee tree replacement will occur in future phases. b. A permit authorizing but limited to grading (and clearing and grubbing) shall expire unless activities are commenced within 60 consecutive calendar days of issuance of the permit or if activities lapse and the project is abandoned for a period exceeding 30 consecutive calendar days. Any site for which the grading permit expires shall immediately be stabilized to prevent erosion. c. A grading permit shall be limited in its authorization to land grading activities along with associated tree protection, clearing and grubbing, and demolition activities, and may authorize the construction of storm drainage improvements and soil erosion and sedimentation facilities as allowed by the permit itself. d. If landscape improvements are required by the land disturbance permit, then all plantings must be completed, or a performance bond shall be filed for the incomplete work prior to the closing of such permit. (k) Parking waiver (for 5 or more vehicles). The standard requirements related to the issuance of a parking permit can be found in chapter 200, article III, section 203-12. (l) Sign permit. The standard requirements related to the issuance of a sign permit can be found in chapter 200, article IV. (m) Temporary outdoor activities permit. The standard requirements related to the issuance of an temporary outdoor activities permit can be found in chapter 8, article IX, of this Code. (n) Temporary outdoor retail display permit. The standard requirements related to the issuance of an outdoor display permit can be found in section 8-319 of this Code. (o) Tree removal permit. No person, corporation, association or other entity shall remove or destroy any tree either on public or private property with a DBH of six inches or greater without having first obtained a tree removal permit from the Community Development Department. A tree plan approved as a part of an approved development permit shall constitute a tree removal permit. (1) Application. a. An application for a tree removal permit when land disturbing activity is involved shall include three copies of a tree conservation and landscape plan which shall be completed and signed by a registered forester, a certified or degreed arborist, or a registered landscape architect whose credentials shall be made available to the Community Development Director. b. The information that must be included on a tree conservation and landscape plan is described in article V, section 105-6. c. An application to remove or destroy a specimen tree not associated with land disturbing activity shall be accompanied by photographs, a site drawing and a written statement of the condition of the tree including the threat that it poses, submitted by the owner of the property and a registered forester, a certified or degreed arborist or a registered landscape architect whose credentials shall be made available to the Community Development Director. If in the determination of the Community Development Director, the specimen tree is obviously dead or immediately hazardous then the requirements in this subsection may be waived by the Community Development Director. d. An application to remove trees with a DBH of six inches or greater that are not specimen trees and are not associated with land disturbing activity shall be accompanied by a site drawing and a statement from the property owner of the condition of the tree and the threat it poses. Photographs and other supporting information may be required by the Director. (2) Time for consideration of a tree removal permit application. All applications for tree removal permits shall be acted on within 60 days of the receipt of a complete application and permit fee, if any. The tree removal permit fee shall be established by the Mayor and City Council. If the city fails to act on the application within 60 days, the application shall be deemed approved. (3) Standards for review of tree removal permit. The standards requirements and penalties related to the issuance of a tree removal permit can be found in chapter 200, article V. (p) Trade permits. A trade permit is required to erect, install, enlarge, alter, repair, remove, convert or replace any utility (electrical, gas, mechanical, or plumbing) system. The provisions for issuance of a utility permit can be found under provisions for issuance of a building permit, subsection 104-7(b). (q) Utility permits. A utility permit is required to install, enlarge, alter, remove, convert or replace any utility system within city-owned right of way. All utility construction plans within city right-of-way shall be reviewed and approved by the Department before construction begins. Street cuts shall not be allowed unless deemed absolutely necessary due to the presence of rock, the need to tap into an existing line beneath the road surface, or other circumstance which makes boring impossible or infeasible. (r) Zoning verification letter. (1) A zoning verification letter can be issued by the zoning administrator upon request for a fee established by the Mayor and City Council. (2) The letter will convey the current zoning of the subject parcel, and associated conditions of zoning, and known approve variances. (3) The applicant must submit the request by means of a department approved application, along with a survey of the property. (4) The zoning verification letter is only valid for 30 days after issuance. (Ord. No. 08-2019, § I, 6-3-2019; Ord. No. 14-2019, 11-4-2019; Ord. No. 04-2022, § I, 7-5-2022; Ord. No. 08-2022, § I, 8-1-2022; Ord. No. 06-2025, § I, 9-2-2025; Ord. No. 09-2025, § 1, 12-5-2025)