Skip to content
Georgia Commons
Menu

Oakwood · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 54 - ZONING / Article III - DISTRICTS AND USES / Division 4 - DISTRICTS

Sec. 54-431. Mobile home park development regulations.

About this text

  • As published by Municode, current through 2025-07-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Development for mobile home parks in the MHP Mobile Home Park District shall conform to the following regulations:

(1) Site plan approval required. All mobile home park developments shall require site plan review by the planning commission and approval by the city council.

(2) Location and frontage. A mobile home park district development shall be located on property with a minimum frontage of 200 feet on a public street.

(3) Street requirement. Interior roads serving the development shall be constructed to city standards as specified in chapter 44, the city's subdivision regulations, and in addition shall have a minimum pavement width of 20 feet. If dedicated to the public, the roads within the development shall have a minimum right-of-way width of 40 feet.

(4) Lot area and width. A mobile home district development shall have a minimum area of 15 contiguous acres and a lot width of at least 200 feet.

(5) Density. The maximum density of a mobile home district development is 12 units per acre.

(6) Recreation and other community facilities. Not less than ten percent of the total area of the development shall be devoted to recreation and other community use facilities for those mobile home parks designed for or containing ten or more mobile homes.

(7) Perimeter setback required. No mobile home or other building or structure shall be located closer than 40 feet to any mobile home park perimeter property boundary.

(8) Perimeter screening required. A landscaped screen consisting of dense evergreen trees and/or shrubs and having a minimum width of 35 feet adjacent to all public rights-of-way and 15 feet along all other property lines shall be required. A minimum six-foot-high, opaque fence or wall may be erected along property lines not abutting a public right-of-way in lieu of such landscaped screen. All perimeter screening must be maintained.

(9) Utilities. All mobile home parks shall be served by approved public water and public sanitary sewer systems.

(10) Refuse collection. Each mobile home park shall provide refuse collection pads at locations convenient to each mobile home space, but in no case more than 50 feet from the street serving each mobile home.

(11) Space numbering. Each mobile home space shall be provided with a sign, not less than one square foot in area, which indicates the appropriate space number or address.

History

The history line the source prints at the end of the section.

(Ord. No. 220, art. XIII, § 1303, 4-11-1994)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oakwood/zoning/54-431@2025-07-14-690385cffe

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oakwood Zoning Ordinance, Sec. 54-431. Mobile home park development regulations | Georgia Commons