a) Drainage easements for improved ditches, pipe construction, and detention facilities shall be cleared, opened, and stabilized with erosion control measures at the time of development to control surface water runoff. b) Drainage easements shall be provided where a development is traversed by or contains a natural or manmade water course, impoundment, detention pond, floodplain, natural stream or channel. It shall conform substantially to the limits of such natural drainage feature, but shall be not less than 20 feet in width. c) Vehicular access to every stormwater detention facility shall be provided directly from an abutting street, or by access easement between the facility and the nearest street. Such access easement shall be cleared of any trees and shrubs, shall be unpaved and no less that 20 feet wide, and shall have a maximum grade of 12%. d) Drainage easements outside of the street right‐of‐way shall be clearly defined on the final subdivision plat. The property owner will be required to keep the easement free of obstruction in such a way as to assure the maximum designed flow at all times. The property owner shall not alter any drainage improvements without the prior written approval from the County. e) Drainage easements for storm drain pipes and improved ditches shall adhere to the provisions of the Stormwater Management Article of this Development Code.