--- title: Oglethorpe County Zoning Ordinance, Section 1112.03. Commercial/Industrial subdivision entrances collection: local-codes id: local-code:oglethorpe-county/zoning/1112.03 cite_as: Oglethorpe County, Ga., Zoning Ordinance § 1112.03 canonical_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1112.03 md_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1112.03.md text_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1112.03/text source_url: https://www.oglethorpecountyga.gov/_files/ugd/2dc561_a1ee38edc049440c8711e73fa9a719da.pdf date: 2026-11-23 status: active jurisdiction: county:oglethorpe jurisdiction_name: Oglethorpe County county_fips: "13221" corpus_version: local-codes-oglethorpe-county-9e77fd875fbd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/oglethorpe-county/zoning/~article-xi.md previous: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1112.02.md next: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1112.04.md index: https://georgiacommons.org/code/local/oglethorpe-county.md branch: zoning edition: As posted on the county's website, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: county website (oglethorpecountyga.gov) version_id: local-code:oglethorpe-county/zoning/1112.03@2026-11-23-d155e6e763 --- # Oglethorpe County Zoning Ordinance, Section 1112.03. Commercial/Industrial subdivision entrances > As posted on the county's website, retrieved 2026-11-23 Part of: Article XI - Project Design and Construction Standards / 1112 - Deceleration lanes and turn lanes. a) A deceleration lane shall be installed at all entrance roads into a commercial or industrial subdivision connecting to a minor collector, major collector or arterial street with an ADT equal to or greater than 500 vehicles per day. See Section 1113.05, below. b) The County Engineer may require a traffic study to determine if the project’s size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements. If the traffic study determines that the traffic generated by the project warrants it, the County Engineer will require the additional improvements or other mitigating measures.