a) Multi‐family and nonresidential development projects shall install a deceleration lane at each driveway entrance connected to a minor collector, major collector or arterial street with an ADT equal to or greater than 500 vehicles per day. See Section 1112.05, below. For such a project located on a corner lot, a continuous 12‐foot wide travel lane shall be provided in lieu of a deceleration lane along each intersecting street from which access is allowed, for the length of the property’s frontage (but not exceeding 200 feet plus a 50‐foot taper). b) Nonresidential development projects on corner lots that have frontage on interior residential subdivision streets shall have access only from the main street c) Multi‐family and nonresidential development projects projected to generate an ADT less than 500 vehicles per day and having an entrance on a minor collector, major collector or arterial street shall install offset radii and 50 foot tapers. d) The County engineer may require a traffic study to determine if a center turn lane, a longer deceleration lane, an acceleration lane or other improvements will be necessary. If the traffic study determines that the traffic generated by the project warrants it, the Public Works Director will require the additional improvements or other mitigating measures.