--- title: Oglethorpe County Zoning Ordinance, Section 1116.02. Pavement cuts collection: local-codes id: local-code:oglethorpe-county/zoning/1116.02 cite_as: Oglethorpe County, Ga., Zoning Ordinance § 1116.02 canonical_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1116.02 md_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1116.02.md text_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1116.02/text source_url: https://www.oglethorpecountyga.gov/_files/ugd/2dc561_a1ee38edc049440c8711e73fa9a719da.pdf date: 2026-11-23 status: active jurisdiction: county:oglethorpe jurisdiction_name: Oglethorpe County county_fips: "13221" corpus_version: local-codes-oglethorpe-county-9e77fd875fbd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/oglethorpe-county/zoning/~article-xi.md previous: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1116.01.md next: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1117.md index: https://georgiacommons.org/code/local/oglethorpe-county.md branch: zoning edition: As posted on the county's website, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: county website (oglethorpecountyga.gov) version_id: local-code:oglethorpe-county/zoning/1116.02@2026-11-23-de6ad16e5e --- # Oglethorpe County Zoning Ordinance, Section 1116.02. Pavement cuts > As posted on the county's website, retrieved 2026-11-23 Part of: Article XI - Project Design and Construction Standards / 1116 - Location of utilities and street cuts. a) If utility services are installed after the streets have been paved (i.e., under existing streets), such utility services shall be installed by boring under the street. Note that this applies only to services and not the distribution system in the development. b) When it is necessary for a subdivider or any utility company to break existing base or pavement for the installation of services, or any other purpose, the subdivider or utility company shall be financially responsible for the repair of the pavement. The pavement shall be repaired with a patch in accordance with standards developed by the County Engineer, and in accordance with all other specifications required herein for construction ofstreets. c) No existing County road can be open cut unless unusual circumstances warrant it. All utility construction plans within County right‐of‐way shall be reviewed and approved by the County Engineer. d) If a pavement cut is approved, all trenches shall be backfilled and compacted the same day the trench is opened. Trenches under the paving shall be returned to 95 percent compaction. The backfill in all such ditches will be thoroughly compacted in 6‐inch lifts, the subgrade shall be brought to the lines, grades, and typical roadway section required by County specifications. See also Section 1120 regarding excavating and trenching requirements.