--- title: Oglethorpe County Zoning Ordinance, Section 1119.03. Installation of utilities; general collection: local-codes id: local-code:oglethorpe-county/zoning/1119.03 cite_as: Oglethorpe County, Ga., Zoning Ordinance § 1119.03 canonical_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1119.03 md_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1119.03.md text_url: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1119.03/text source_url: https://www.oglethorpecountyga.gov/_files/ugd/2dc561_a1ee38edc049440c8711e73fa9a719da.pdf date: 2026-11-23 status: active jurisdiction: county:oglethorpe jurisdiction_name: Oglethorpe County county_fips: "13221" corpus_version: local-codes-oglethorpe-county-9e77fd875fbd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/oglethorpe-county/zoning/~article-xi.md previous: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1119.02.md next: https://georgiacommons.org/code/local/oglethorpe-county/zoning/1119.04.md index: https://georgiacommons.org/code/local/oglethorpe-county.md branch: zoning edition: As posted on the county's website, retrieved 2026-11-23 edition_date_kind: retrieved source_publisher: county website (oglethorpecountyga.gov) version_id: local-code:oglethorpe-county/zoning/1119.03@2026-11-23-6e6c1032ad --- # Oglethorpe County Zoning Ordinance, Section 1119.03. Installation of utilities; general > As posted on the county's website, retrieved 2026-11-23 Part of: Article XI - Project Design and Construction Standards / 1119 - Installation of streets and utilities. All utility crossings, service lines, conduit, or other related appurtenances shall be installed within the limits of the roadbed plus 2 feet on each side of the pavement surface, prior to the placement and compaction of the graded aggregate base course. Utilities should be installed following the installation of curb and gutter, unless the curb line is accurately staked at 50 foot intervals to insure proper utility locations as specified in Section 1117. The developer shall coordinate the location of all utilities and provide a copy of all as‐built and proposed locations upon submission of the final plat.