Skip to content
Georgia Commons
Menu

Oglethorpe County · Zoning Ordinance

Article VII - Specific Provisions

Section 708.03. Performance Criteria for Reclamation/Land Stabilization

About this text

  • As posted on the county's website, retrieved 2026-11-23

All land involved in the operation shall be put back in a useable and safe fashion after the extraction operations are terminated. The affected land must be restored to a condition that is similar to or compatible with the conditions that existed before excavation. At minimum, reclamation or land stabilization shall include the following.

a) Reclamation/Land Stabilization Plan and Objectives Time Frame ‐ Reclamation or land stabilization objectives as specified in the approved Surface Mining Land Use Plan or Comprehensive Site Development Plan, as specified in Subsection 708.05 herein, as appropriate, or such Plans as officially amended, shall be achieved within the specified time period, but not to exceed twenty‐four (24) months from date of cessation, except as otherwise specified herein. All exposed critical disturbed areas shall be stabilized and all measures employed for erosion and sedimentation control shall be maintained by the operator until reclamation or land stabilization can be completed. There shall be no amendment to the Plan unless such amendments are first approved by the Board of Commissioners or their designated official(s).

b) Removal of Equipment/Structures and Restoration of Topography ‐ All accessory structures, mechanical equipment, and stockpiled materials associated with the operation shall be removed. This does not include grout stacked in a designated area as shown on an approved comprehensive site development plan. Unless otherwise specified in the approved Surface Mining Land Use Plan or Comprehensive Site Development Plan, as specified in Subsection 708.05 herein, as appropriate, or such Plans as officially amended, all affected land (excluding dimension stone quarry excavation pits) shall be graded into a rolling topography and blended in with the existing landscape. Boulders, and overburden may be incorporated into protective barriers or berms, as necessary, provided such materials shall not be deposited in the required buffer areas except as specifically provided in Subsection 708.02(h), Buffers, herein. All lands except those specifically exempted in said approved Surface Mining Land Use Plan or Comprehensive Site Development Plan, shall have a neat, clean appearance and shall be free of debris and refuse.

c) Vegetative Stabilization ‐ The Operator shall provide a high quality, enduring vegetative ground cover of properly planted and nurtured perennial vegetative species suited for the specific planting zone involved. The perennial vegetative species shall provide a complete, thorough stabilization by providing root mass and cover for the total disturbed area. If forest land is the reclamation objective, a vegetative ground cover will also be provided prior to or concurrent with tree seeding or the planting of tree seedlings.

d) Structural Stabilization ‐ Permanent structural control measures, i.e. stone riprap, ditches, berms, paved chutes, or piped down drains, etc, shall be utilized to convey concentrated storm flows down slopes to stable outlets. These measures shall be necessary in areas where concentrated storm flow velocities may cause erosion.

e) Lakes or Ponds – All proposed lakes or ponds shall comply with all applicable local, state and federal regulations and requirements.

f) Sound Engineering Principles ‐ Sound engineering and conservation principles shall be applied to ensure that affected lands, as reclaimed, meet the intended use.

g) Securing the Property ‐ A gate shall be installed at each entrance to the mining property. The gate shall be so constructed that a pedestrian cannot casually pass under or over the gate. Gates constructed with a single pipe or tube running the length of the entrance, or gates made of a single strand of wire, chain, rope or other like material crossing the entrance shall not be permitted. “No Trespassing” signs shall be installed on the gate and along the perimeter of the property every fifty (50’) feet and between four (4’) to seven (7’) feet above the ground. The “No Trespassing” signs shall be maintained in a legible condition and at the proper height.

Read this code where it is posted (county website (oglethorpecountyga.gov)) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oglethorpe-county/zoning/708.03@2026-11-23-93698101a8

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oglethorpe County Zoning Ordinance, Section 708.03. Performance Criteria for Reclamation/Land Stabilization | Georgia Commons