Skip to content
Georgia Commons
Menu

Oglethorpe · Zoning Ordinance

Part II - THE CODE OF THE CITY OF OGLETHORPE, GEORGIA / Chapter 38 - ZONING / Article II - ADMINISTRATION AND ENFORCEMENT

Sec. 38-41. Building permit.

About this text

  • As published by Municode, current through 2023-07-27
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) No building or other structure shall be located, erected, moved, added to, or structurally altered without a building permit issued by the building inspector. No building permit shall be issued, except in conformity with the provisions of this chapter.

(b) All applications for building permits shall be accompanied by plans in duplicate, drawn to scale, showing:

(1) The actual dimensions of the lot to be built upon;

(2) The sizes and locations on the lot of any existing buildings or structures;

(3) The shape, size, height, use, and location on the lot of the building or structure proposed to be erected or altered; and

(4) Such other information as may be necessary to provide for the enforcement of the provisions of this chapter.

If no substantial construction progress has been made within six months of the date of the issuance of the building permit, the permit becomes invalid.

History

The history line the source prints at the end of the section.

(Ord. of 11-25-1974, §§ 122, 123)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:oglethorpe/zoning/38-41@2023-07-27-3c6e3fcd0e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Oglethorpe Zoning Ordinance, Sec. 38-41. Building permit | Georgia Commons