Palmetto · Zoning Ordinance
Appendix B - ZONING / Article 11 - OVERLAY DISTRICTS
Sec. 11-3. Watershed overlay.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
A. Purpose. In order to protect the health, safety, and welfare of the public and provide a sound economic climate within the city and surrounding communities, it is essential that the quality of public drinking water be assured. The ability of natural systems to filter stormwater runoff can be threatened by unrestricted development. Land-disturbing activities associated with development can increase erosion and sedimentation that threatens the storage capacity of reservoirs. In addition, stormwater runoff, particularly from impervious surfaces, can introduce toxins, nutrients and sediment into drinking water supplies, making water treatment more complicated and expensive and rendering water resources unusable for recreation. Industrial land uses that involve the manufacture, use, transport, and storage of hazardous or toxic waste materials result in the potential risk of contamination of nearby public drinking water supplies. The purpose of this article is to establish measures to protect the quality and quantity of the present and future water supply of the city; to minimize the transport of pollutants and sediment to the water supply; and to maintain the yield of the water supply watershed. This article shall apply to all existing and proposed water supply watersheds within the city.
B. Applicability. The city water supply watershed district is hereby designated and shall comprise the land that drains to the city water supply reservoir. The boundaries of these overlays are defined by the ridgelines of the respective watersheds and the boundary of a radius of seven miles upstream of the city water supply reservoir. These overlays shall be further delineated and defined on the Water Supply Watershed Protection District Overlay Map of the city. The map is hereby incorporated into and made a part of this article by reference. The following water supply watershed districts and reservoirs are hereby defined and their boundaries shall be identified on the Water Supply Watershed District Overlay Map.
1. The city water supply watershed district is a small water supply watershed. This water supply watershed contains a reservoir that is owned by the city and is located within the jurisdiction of the city. The city is responsible for the protection of this reservoir. An intake for the city is located on the reservoir. The city has two intakes on Cedar Creek and also lies within one of the City of Newnan's water supply watersheds known as the Line Creek water supply watershed, a small water supply watershed.
2. The reservoir normal pool level of the city water supply reservoir is at MSL elevation 884.0.
C. Regulations. The following regulations shall apply to the city water supply watershed district identified on the adopted map as a small water supply watershed with a reservoir known as the city water supply reservoir:
1. The corridors of all perennial streams within a seven-mile radius upstream of a governmentallyowned public drinking water supply intake or water supply reservoir must be protected by the following criteria:
a. A buffer shall be maintained for a distance of 100 feet on both sides of the stream, as measured from the stream banks.
b. No impervious surface shall be constructed within a 150-foot setback area on both sides of the stream, as measured from the stream banks.
c. Septic tanks and septic tank drain fields are prohibited in the 150-foot setback area as described in subparagraph 1.b. above.
2. The impervious surface area, including all public and private structures, utilities, or facilities, of the entire water supply watershed shall be limited to 25 percent or the existing use, whichever is greater.
3. New facilities which handle hazardous materials of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976, excluding underground storage tanks, in amounts of 10,000 pounds or more on any one day, shall perform their operations on impervious surfaces and in conformance with applicable federal spill prevention requirements or the requirements of the Standard Fire Prevention Code.
4. A buffer shall be maintained for a distance of 150 feet from the reservoir boundary. The allowable buffer vegetation and disturbance is specified in the reservoir management plan.
5. The city water supply reservoir is owned by the city and will be protected by the city.
6. The city lies outside the seven-mile radius upstream of the City of Newnan's intake. The following regulations apply within the city's jurisdiction:
a. The corridors of all perennial streams outside a seven-mile radius upstream of the City of Newnan's drinking water supply intake on Line Creek must be protected by the following criteria:
1. A buffer shall be maintained for a distance of 50 feet on both sides of the stream, as measured from the stream banks.
2. No impervious surface shall be constructed within a 75-foot setback area on both sides of the stream, as measured from the stream banks.
3. Septic tanks and septic tank drain fields are prohibited in the 75-foot setback area as described in subparagraph a.2. above.
b. The impervious surface area, including all public and private structures, utilities, or facilities, of the entire water supply watershed shall be limited to 25 percent or the existing use, whichever is greater.
c. New facilities which handle hazardous materials of the types listed in Section 312 of the Resource Conservation and Recovery Act of 1976, excluding underground storage tanks, and amounts of 10,000 pounds or more on any one day, shall perform their operations on impervious surfaces and in conformance with any applicable federal spill prevention requirements or the requirements of the Standard Fire Prevention Code.
D. Exemptions. The following uses shall be exempted from the Watershed Overlay regulations:
1. Land uses existing prior to the adoption of this article.
2. Mining activities permitted by the department of natural resources under the Surface Mining Act.
3. Utilities may be exempt from the stream corridor buffer and setback area provisions if the utilities to be located in the buffer or setback areas cannot feasibly be located outside these areas and will meet the following conditions:
a. The utilities shall be located as far from the stream bank as reasonably possible.
b. The installation and maintenance of the utilities shall protect the integrity of the buffer and setback areas to the extent reasonably possible.
c. The utilities shall not impair the quality of the drinking water stream.
4. Specific forestry and agricultural activities in the stream corridor buffer and setback areas, in accordance with the following conditions:
a. The activity shall be consistent with best management practices established by the state forestry commission or the state department of agriculture.
b. The activity shall not impair the quality of the drinking water stream.
E. Administration and Enforcement Procedures.
1. Site Plans. Application for a local development permit within the city water supply watershed district shall include a site plan, drawn at a scale of not less than 1" = 50', with the following information:
a. A map of all planned excavation and fill, including calculations of the volume of cut and fill involved, cross-sectional drawings showing existing and proposed grades. Elevations, horizontal scale and vertical scale must be shown on the cross-sectional drawings.
b. A map of any wetland boundaries occurring within the site must be provided. This boundary may be included on other maps provided by the applicant.
c. Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site and adjacent to the site for a distance of 200 feet.
d. The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body.
e. Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater the two feet and no greater than one foot for slopes less than or equal to two percent.
f. Location and detailed design of any spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials.
g. All proposed temporary disruptions or diversions of local hydrology.
2. Activities to Comply with Site Plan. All development activities or site work conducted after approval of the site plan shall conform to the specifications of the site plan. Significant changes to the site plan that would alter the amount and velocity of stormwater runoff from the site;
increase the amount of impervious surface within the development; alter the overall density of development; result in a considerable increase in the amount of excavation or fill; or alter the overall appearance of the development as proposed, can be amended only with the approval of the zoning administrator. Minor changes, such as the realignment of streets or minor alterations to drainage structures and other infrastructure to meet unexpected conditions are exempted from this requirement.
3. Exemptions to Site Plan Requirements. The following activities and developments are exempt from the requirement of subsection E.1. for detailed site plans.
a. Single-family detached homes constructed within a subdivision of fewer than five lots.
b. Repairs to a facility that is part of a previously approved and permitted development.
c. Construction of minor structures, such as sheds or additions to single-family residences.
4. Review Procedures. The application, including a fee as established by the city council, shall be made to the zoning administrator. The city may retain expert consultants who will review the application for compliance with this article. The applicant will receive written notification from the zoning administrator of the findings and whose decision may be appealed to the city council.
5. Duration of Permit Validity.
a. If construction described in the development permit has not commenced within 12 months from the date of issuance, the permit shall expire.
b. If construction described in the development permit is suspended or abandoned after work has commenced, the permit shall expire 12 months after the date that work ceased.
c. Written notice of pending expiration of the development permit shall be issued by the zoning administrator.
6. Penalties.
a. When a building or other structure has been constructed in violation of this section, the violator shall be required to remove the structure.
b. When removal of vegetative cover, excavation, or fill has taken place in violation of this section, the violator shall be required to restore the affected land to its original contours and to restore vegetation, to the extent practicable.
c. If the zoning administrator discovers a violation of this section that also constitutes a violation of any provision of the Clean Water Act, as amended, the city administrator will endeavor to issue written notification of the violation to the U.S. Environmental Protection Agency, the U.S. Army Corps of Engineers, and/or the landowner.
7. Suspension, Revocation. The zoning administrator shall suspend or revoke a permit if found that the applicant has not complied with the conditions or limitations set forth in the permit or has exceeded the scope of the work set forth in the permit.
8. Judicial Review. All final decisions of the city concerning denial, approval or conditional approval of a permit shall be reviewable in the city court.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.