--- title: Palmetto Zoning Ordinance, Sec. 15-24. Mineral extraction operations collection: local-codes id: local-code:palmetto/zoning/15-24 cite_as: Palmetto, Ga., Zoning Ordinance § 15-24 canonical_url: https://georgiacommons.org/code/local/palmetto/zoning/15-24 md_url: https://georgiacommons.org/code/local/palmetto/zoning/15-24.md text_url: https://georgiacommons.org/code/local/palmetto/zoning/15-24/text source_url: https://library.municode.com/ga/palmetto date: 2026-11-11 status: active jurisdiction: city:palmetto jurisdiction_name: Palmetto place_fips: "1358884" corpus_version: local-codes-palmetto-8bba356283f7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/palmetto/zoning/~appendix-b/~article-15.md previous: https://georgiacommons.org/code/local/palmetto/zoning/15-23.md next: https://georgiacommons.org/code/local/palmetto/zoning/15-25.md index: https://georgiacommons.org/code/local/palmetto.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:palmetto/zoning/15-24@2026-11-11-9f05dbc3ca --- # Palmetto Zoning Ordinance, Sec. 15-24. Mineral extraction operations > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - ZONING / Article 15 - SPECIAL USE REQUIREMENTS A. A special use permit shall be required for mineral extraction operations, including removal of soil sand or gravel, where more than 600 cubic yards will be removed in a one-year period. The special use permit may be reviewed annually by the city council to ensure that the operation conforms to all plans, progress, conditions, and sureties. Removal operations shall not begin until the special use is approved and a zoning compliance permit is issued. B. Application. In addition to the submittals for a special use outlined in Section 15-6, an application for a mineral extraction permit shall be accompanied by the following: 1. A topographic map with two-foot contour intervals including the locations of all streets, buildings, and existing drainage facilities within 300 feet of the property. 2. A topographic map with two-foot contour intervals showing final elevations, including the proposed locations of access drives, parking areas, and equipment. 3. An estimated schedule for removal and an agreement conforming to all provisions of this section. 4. A traffic control plan showing proposed truck routes to and from the site. 5. A written description of proposed post removal use of the property. 6. A fee, determined by resolution of the city council, to defray review, administration, and inspection costs. C. Conditions. A special use permit shall not be issued unless activities comply with all the following conditions. A special use permit may be revoked if the use is found in violation of any part of this section: 1. Activities shall comply with applicable soil erosion and sedimentation control regulations. 2. Final grades shall not exceed five percent and shall meet existing elevations at all property lines. Grades in excess of five percent may be permitted by the city council if the applicant demonstrates that an increase is essential to implement a plan for future use. 3. Mineral extraction shall not create permanent depressions that may fill with water. All storm runoff must discharge into existing drainage systems. 4. Since artificial lakes and water bodies can present threats of ground water pollution and stagnant water, thereby adversely affecting the public health, safety, and welfare, they shall not be created as part of removal operations unless the applicant demonstrates: a. Engineering and geological studies find there will be a positive source of unpolluted underground or stream-fed water in adequate amounts to produce positive water flow at all times; b. Plans for the proposed artificial lake or water body have received all State of Georgia approvals and conform to all federal, state, county, and municipal standards; c. A site plan of the proposed future development has been approved by the city; and d. In an artificial lake or water body, a channel or lagoon shall not project beyond the main body of water greater than two times the width of the lagoon or channel. 5. Other conditions may also be imposed, to protect the public health, safety and welfare. D. The city may require a financial guarantee in accordance with Section 21-5 to ensure compliance with the zoning ordinance and any conditions of approval. ## History (Ord. No. 2013-02, § 6, 4-1-2013)