Paulding County · Zoning Ordinance
Paulding County Zoning Ordinance
This document is shown whole, as one text: its source does not cut it into sections.
About this text
- As published by Municode, current through 2025-12-09
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Part 6 of 9. This text is long, so its page prints it in parts, in the source's order. A link to one of its paragraphs leads to the part that holds it.
5.1.1 Future access. When land is subdivided into larger parcels than ordinary building lots, such parcels shall be arranged and designed so as to allow for the opening of future streets and to provide access to those areas not presently served by streets.
5.1.2 Guaranteeing access to adjoining parcels. No subdivision shall be designed so as to completely eliminate street access to adjoining parcels of land. Every development shall be designed to facilitate access to adjoining properties that are developed or anticipated to be developed in a manner substantially similar to the subject property. Locations of interparcel access shall be as required by and subject to the approval of the Paulding County Department of Transportation (hereafter referred to in this article as "the department.").
5.1.3 Vehicular access from public street required. Any lot required to provide minimum frontage by the zoning district in which the lot is located shall provide vehicular access directly from a public street along the frontage or along any other property line that abuts a public street, except as provided in section 5.1.5.
5.1.4 Private streets. Private streets as may be approved under the provisions of these regulations or other ordinances or regulations of Paulding County shall be constructed to the roadway construction standards of the department, as contained herein.
5.1.5 Vehicular access easements.
1) Vehicular access easements may be provided from a public street indirectly via easement in any one or more of the following circumstances:
(a) The property is not required to provide a minimum frontage by the applicable zoning district, provided that the easement shall be in a location and the access driveway shall have a width and alignment acceptable to the fire services division and the department.
(b) The property is a buildable lot of record, as defined herein, but does not meet the minimum frontage requirement of the applicable zoning district. The property must be served by an exclusive access easement, which shall be limited to the provision of access to only one principal use or structure.
(c) The access easement serves a single-family residence on a lot which is otherwise a buildable lot of record, and which is sharing a common driveway with no more than one other single-family residence.
(d) The access easement was lawfully established as such under the code, ordinances or regulations of Paulding County prior to the adoption of these development regulations.
(e) The access easement coincides with a private roadway approved under the code, ordinances or regulations of Paulding County. All new private roadways must be constructed to the roadway standards of these regulations, and their ownership and perpetual maintenance responsibility by private party(s) must be clearly established on the final plat of the development.
(f) The access easement serves a buildable lot of record which meets the minimum frontage requirements of the zoning ordinance, but at which point the access is not achieved or prohibited along the available frontage.
5.2 Streets.
5.2.1 Applicable specifications and standards. The latest editions of the following specifications, standards and publications setting the minimum requirements for quality, safety and performance of work and materials form a part of these regulations as though fully repeated herein:
AASHTO. American Association of State Highway and Transportation Officials.
ASTM. American Society of Testing and Materials.
MUTCD. Manual on Uniform Traffic Control Devices.
5.2.2 Dedication of street right-of-way. Right-of-way for all public streets, existing and proposed, shall be dedicated in accordance with the street classifications as shown on the Roadway Classification Map of Paulding County.
5.2.3 Street improvements. Streets, whether existing or new, shall be constructed or improved under those circumstances and to the standards as established in these regulations. Roadway improvements shall be in accordance with the street classifications as shown on the Roadway Classification Map of Paulding County, or the zoning ordinance, as applicable, or as otherwise required by the board of commissioners.
5.3 Minimum right-of-way and street improvements.
5.3.1 Right-of-way and pavement widths.
Table 5-A Minimum Right-of-Way and Roadway Widths for New Streets and Project Access Improvements Street Category Minimum Right-of-Way (in Feet)(1) Minimum Roadway(2) (in Feet) Principal arterial 124 to 144 6 through lanes Major arterial 124 to 144 Undivided 60 100 divided - 2×29 6 lanes Minor arterial 104 48 Major collector 84 48 Minor collector 66 36 Local street Nonresidential 603 28 Nonresidential cul-de-sac 60 radius 50 radius Local street with curb and gutter Residential-S1 50 20 Residential-S2 50 22(4) Residential-S1 and S2 cul-de-sacs 55 radius 40 radius Residential-S3 60 24(4) Residential-S3 cul-de-sac 60 50 radius Local Street without curb and gutter Residential-S1 and S2 50 22 Residential-S2 cul-de-sac 55 radius 40 radius Residential-S3 60 24 Residential-S3 cul-de-sac 60 radius 50 radius
FOOTNOTES:
1) The greater right-of-way width shall apply under circumstances as described in section 5.3.2(c).
2) Roadway width dimensions are asphalt only (no curb and gutter).
3) Utility easement shall be provided in a location and size as required by the Paulding County Department of Transportation.
4) Roadway width may be reduced to 20 feet on S2 streets and 22 feet on S3 streets if L-back curb is used.
5.3.2 Street rights-of-way.
1) The minimum width of street right-of-way shall be dedicated based upon the street categories as shown on the Roadway Classification Map of Paulding County and as contained in these regulations.
2) Additional street right-of-way width shall be required to be dedicated at intersections or other abutting locations which the property abuts upon where deceleration lanes, turning lanes, storage lanes, medians, or realignments are required for traffic safety and minimum right-of-way standards would be inadequate to accommodate the improvements.
3) If a new street or thoroughfare is proposed by the comprehensive plan or the State of Georgia to adjoin or traverse the property, permits shall not be issued until the department has submitted the project to the board of commissioners for review in order to seek a determination if Paulding County should acquire the right-of-way or if a study of alternate routes should be undertaken. The review period by Paulding County shall be 90 days from the date of permit application.
5.3.3 Project access improvements; single-family detached, single-family attached, and duplex residential subdivisions.
1) When property that abuts upon an existing or proposed county street is to be developed or redeveloped as a single family detached, single family attached, or duplex residential subdivision and the county street will provide access to the property, project access improvements to the county street (deceleration lanes, turn lanes, etc.) shall be provided by the developer as required herein.
2) In the event a street has an existing or proposed median, and the developer desires to construct a median break to serve the subdivision, a left turn lane leading to the median break shall be required to be provided by the developer if approved by the department of transportation and shall meet the standards contained herein. The preferred spacing for median breaks is 1320 feet and the minimum spacing is 1000 feet between the centerlines of the openings. Other factors will also be considered, such as distance to other median openings, adjacent land use, expected traffic volumes, and the resulting U-turns that are likely to occur without the median opening. Meeting the spacing criteria alone is not an indication that median openings will be allowed.
3) A deceleration lane shall be provided at each project driveway or subdivision street entrance, in accordance with department of transportation's "Left-Turn Lane & Right-Turn Deceleration Lane Technical Guidelines." Pavement width of lane shall be 12 feet (exclusive of curb and gutter) and shall be provided with curb and gutter.
Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder shall be dedicated by the developer to Paulding County at no cost.
Associated stormwater drainage improvements as deemed necessary by the construction of the deceleration lane shall also be required.
4) A left turn lane shall be provided into each project driveway or subdivision street entrance, in accordance with the department of transportation's "Left-Turn Lane & Right-Turn Deceleration Lane Technical Guidelines." Left turn lanes shall not reduce the existing width of the useable shoulder. Additional right-of-way may be required to accommodate left turn lanes, shoulders, and clear zone. If additional right-of-way is required, the right-of-way shall be dedicated by the developer to Paulding County at no cost.
5) Other project access improvements may be required by the department of transportation in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.
6) The developer shall be responsible for the relocation of public or private utilities and drainage structures, as may be occasioned by the required project access improvements.
5.3.4 Project access improvements; multi-family and nonresidential developments.
1) When property that abuts upon an existing or proposed county street is to be developed or redeveloped for multi-family or nonresidential uses and the county street will provide access to the property, project access improvements to the county street (deceleration lanes, turn lanes, etc.) shall be provided by the developer as required herein.
2) In the event a street has an existing or proposed median, and the developer desires to construct a median break to serve the subdivision, a left turn lane leading to the median break shall be required to be provided by the developer if approved by the department of transportation and shall meet the standards contained herein. The preferred spacing for median breaks is 1320 feet and the minimum spacing is 1000 feet between the centerlines of the openings. Other factors will also be considered, such as distance to other median openings, adjacent land use, expected traffic volumes, and the resulting U-turns that are likely to occur without the median opening. Meeting the spacing criteria alone is not an indication that median openings will be allowed.
3) A deceleration lane shall be provided at each project driveway or subdivision street entrance, in accordance with department of transportation's "Left-Turn Lane & Right-Turn Deceleration Lane Technical Guidelines." Pavement width of lane shall be 12 feet (exclusive of curb and gutter) and shall be provided with curb and gutter.
Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder shall be dedicated by the developer to Paulding County at no cost.
Associated stormwater drainage improvements as deemed necessary by the construction of the deceleration lane shall also be required.
4) A left turn lane shall be provided into each project driveway or subdivision street entrance, in accordance with the department of transportation's "Left-Turn Lane & Right-Turn Deceleration Lane Technical Guidelines." Left turn lanes shall not reduce the existing width of the useable shoulder. Additional right-of-way may be required to accommodate left turn lanes, shoulders, and clear zone. If additional right-of-way is required, the right-of-way shall be dedicated by the developer to Paulding County at no cost.
5) Other project access improvements may be required by the department of transportation in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.
6) The developer shall be responsible for the relocation of public or private utilities and drainage structures, as may be occasioned by the required project access improvements.
5.3.5 New streets.
1) All new streets proposed to be constructed in a subdivision or other development, whether to be public or private, shall be designed and constructed at least to the standards contained in these regulations in accordance with the category of said streets.
2) In residential subdivisions, a dead end ("stub") street required under section 5.4.4 to provide access to an abutting property may be exempt from construction of roadway improvements and public utilities under the following circumstances:
(a) No lot within the proposed subdivision will gain access from the "stub" street.
(b) A concept plan has not been submitted or approved on the neighboring tract.
(c) The "stub" street shall be fully designed as part of the construction plans.
However, the right-of-way shall only be cleared and rough graded in accordance with the approved plans and all disturbed areas grassed.
(d) Connections for future extension of all public utilities shall be constructed as part of the subdivision. Curb returns shall be constructed as part of the subdivision. Curb returns shall be provided to the future "stub" street roadway location, and curb and gutter shall be installed across the roadway stub at the right-of-way line (extended).
(e) The right-of-way for the "stub" street shall be dedicated as part of the final plat.
Slope easements or construction easements, if required by the street design, shall be shown on the final plat.
5.3.6 Substandard streets.
1) In the event that a development has access to a substandard street (i.e., a dirt, surface treatment, or gravel road), the following project access improvements shall be required:
(a) If the abutting substandard street providing access to the development is dirt, surface treatment or gravel, the street shall be upgraded by the developer to a paved roadway from the project entrance to the nearest standard paved road along the route of access.
2) Off-site project access improvements required under (1)(a) above, shall at a minimum, result in a full-section roadway meeting the requirements of a local residential rural roadway (22 feet edge to edge of pavement, with drainage swale ditches as needed).
3) The developer shall design the road and provide the labor, equipment, and materials required for roadway improvements and necessary drainage improvement.
4) All right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the county.
5) The county reserves the right to negotiate for additional improvements beyond the rural roadway classification or length of the rural roadway.
5.3.7 Improvements along state highway. For any development which abuts a state highway or other right-of-way controlled by the State of Georgia, improvements to the roadway and the location and design of any street or driveway providing access from the state highway shall comply with the standards and requirements of the Georgia Department of Transportation. A permit for the proposed access or improvement shall be approved by the Georgia DOT and incorporated into the construction drawings for the project prior to issuance of a development permit by the Paulding County Department of Transportation.
(Ord. No. 23-12, § 1(Exh. A), 12-12-2023)
5.4 General layout requirements.
5.4.1 Conformance. The arrangement, character, extent, width, grade and location of all streets shall conform at a minimum to the comprehensive plan and these regulations.
5.4.2 Local streets and minor collectors. Local streets shall be so laid out that their use by through traffic will be discouraged. Minor collectors shall be provided to channel through traffic movements within a development, where appropriate to the design and a major thoroughfare is not proposed by the comprehensive plan. Minor collectors also may be provided as central routes within large residential subdivisions, where appropriate to the design, based on project traffic demands exceeding 2,000 trips per day (ADT).
5.4.3 Cul-de-sac streets.
1) Dead end streets designed to have one end permanently closed shall provide a cul-de-sac turnaround and may be no more than 2,000 feet in length. Additional length necessitated by topography or property configuration may be approved by the department.
2) The length of a cul-de-sac street shall be measured from the center of the cul-de-sac back to the center of the originating intersection.
3) Cul-de-sacs shall conform to the layout and dimensional requirements as shown in the standard details.
5.4.4 Other dead end streets.
1) A dead end street shall be provided to the boundary of a subdivision where necessary to provide access to a land-locked abutting property, for planned continuity of future circulation, for improved access for public safety vehicles or for the extension of public water or other utilities to neighboring lands. Such dead end streets shall be designed so as to allow their reasonable extension, and shall be located so as to be reasonably incorporated into a street design for the neighboring property. The stub street requirement may be waived by the department under extenuating circumstances.
2) Dead end streets on abutting property shall be extended into a proposed subdivision and incorporated into the street design of the development. This requirement may be modified by the department in cases of serious topographical hardship or dissimilar zoning which would create unacceptable land use conflicts between the two developments. This modification may be conditioned on the provision of easements necessary for the extension of public utilities, the provision of cul-de-sac or other permanent turnaround on the dead end street, or the removal of the dead end street back to its nearest intersection.
3) Where a dead end street (other than a cul-de-sac) serves more than three lots, the developer shall be required to provide a temporary vehicular turnaround within the right-of-way. This requirement may be waved if extension of the dead end street is approved and under construction prior to its inclusion in a final plat.
4) Where a street dead ends at the property boundary and the street exceeds 1,000 feet in length, a permanent cul-de-sac shall be required. In this situation, right-of-way to the property boundary shall be required, but the pavement shall not be extended to the property boundary beyond the edge of the paved cul-de-sac turnaround. In no case shall a dead end street exceed 2,000 feet in length unless approved by the department due to unusual topographic conditions or property configuration.
5.4.5 Service roads. Where a development borders on or contains a railroad right-of-way, or a limited access highway right-of-way or a major thoroughfare, a public street may be required to be constructed and dedicated within the development approximately parallel to and on each side of such right-of-way.
5.4.6 Half-streets. Half-streets (new boundary streets having one-half of the minimum required right-of-way or pavement width) shall not be allowed nor access to same be permitted should it exist.
5.4.7 Reserve strips. Land in private ownership adjacent to public rights-of-way which could control or are intended to control access to streets, alleys, or public lands shall not be permitted unless their control is given to the county under ownership, dedication, or easement conditions approved by the county attorney or acceptable to the department. No development shall be designed so as to deny access to abutting properties.
5.4.8 Alleys. Alleys shall not be provided except where the subdivider produces evidence satisfactory to the department of the need. In the event the department approves a design that proposes alleys, the alley shall be constructed as though it were a local street pursuant to the standards contained in these regulations.
5.4.9 Street jogs.
1) Street jogs shall either directly align or have off-sets of a minimum of 125 feet for residential S1 and S2 streets.
2) All arterials and collectors shall provide off-sets as required by the department, where alignment is not desirable or feasible, but in no case be spaced less than 600 feet apart as measured between centerlines of said streets.
5.5 Specifications.
Unless otherwise specifically set forth herein, all of the materials, methods of construction and workmanship for the work covered in reference to street construction shall conform to the latest specifications of the Georgia Department of Transportation (Georgia DOT).
5.6 Subgrade preparation for all streets.
5.6.1 Procedures and requirements for subgrade preparation.
1) Subgrade preparation shall be in accordance with Georgia DOT specifications and these regulations.
2) If any sections of the subgrade are composed of topsoil, organic or other unsuitable or unstable material (the top 12 inches less than 100 cubic pounds), such material shall be removed and replaced with suitable material and then thoroughly compacted as specified for fill or stabilized with stone or a geo-textile, geo-grid or other suitable materials approved by the department.
3) Fill shall be placed in uniform, horizontal layers not more than eight inches thick (loose measurement). Moisture content shall be adjusted as necessary to compact material to 95 percent of maximum dry density except for the top 12 inches, which shall be compacted to 100 of maximum dry density.
4) After the earthwork has been completed, all storm drainage, water, and sanitary sewer utilities have been installed within the right-of-way as appropriate, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades and typical roadway shown on the plans.
5) Utility trenches cut in the subgrade shall be backfilled as specified herein. Compaction tests at the rate of one per 150 feet of trench shall be provided to verify compaction.
6) The subgrade must pass roll testing prior to placement of the base material. With the approval of the Paulding County Department of Transportation, a geo-textile or grid may be used to stabilize a subgrade that does not pass proofrolling.
7) When the street is to be used for construction traffic before the paving work is completed, a layer of stone (except crusher run) shall be laid as a traffic surface. This material shall not be used as a part of the base material. It may be worked into the subgrade, or it shall be removed before the base course is set up for paving.
8) Provisions shall be made to drain low points in the road construction when the final paving is delayed. A break in the berm section is required when the curbing has not been constructed. Once curbing has been installed, a three inch notch in the curb at the throat section of the low point inlet shall be cut to the depth of the binder course to provide drainage. No areas of ponding shall be created. After the final pavement surface coat has been applied, the notch shall then be filled in.
5.7 Base preparation and paving application.
5.7.1 Streets within a residential subdivision (S1, S2 and S3).
1) Asphalt streets. The following materials shall be used:
(a) Crushed stone base. The base course shall consist of at least six to eight inches of graded aggregate base, which shall be thoroughly compacted and brought to proper section. For sections less than four feet wide, eight inches of Class "A" concrete base (five inches on local and minor collector streets) and 11 /2 inches of
9.5 mm or 12.5 mm topping shall be required.
(b) Ninety-eight percent base compaction required on all graded aggregate base.
(c) Upon inspection and approval by the DOT inspector, the base shall be primed with 0.25 gallon of R.C. 70 per square yard and cured for three days prior to paving.
(d) Upon final approval of base course, two inches of 19 mm binder shall be applied.
(e) The final one and one-half (1.5) inch of 12.5 mm top course shall be applied after 75 percent of the houses on the street have been built.
(f) Prior to application of top course, base course shall be inspected and repaired.
(g) Prior to applying the top course, a tack coat shall be applied to the binder course at a rate of 0.05 gallons per square yard. The department shall approve type of tack prior to placement.
(h) All asphalt shall be compacted to 95 percent Standard Proctor.
(i) Prior to the final platting of any development with public or private streets, asphalt cores will be taken as described below:
i. For each street, a minimum four-inch diameter asphalt core sample will be taken for each five hundred lane feet of travel lane, or one per travel direction if the street length is less than three hundred feet. One core sample should be taken from each deceleration lane if a part of the development.
ii. If the core sample is found to be deficient in overall thickness greater than inch, then additional cores will be taken in both directions away from the original core at fifty-foot intervals until a core with minimum required plan thickness is obtained.
iii. Each core sample thickness will then be averaged with all the core samples from the same street to obtain an overall average street pavement
thickness. If the overall pavement thickness is deficient by inch from the required plan thickness, then corrective measures will have to be taken or bonded prior to the final plat being recorded.
iv. Core data will be collected utilizing an independent testing company of the Owner/Developer choice, with all data being furnished to the Department of Transportation directly from the testing firm. Once the data has been collected, the Owner/Developer will make a proposal for the Department of Transportation's approval as to how any corrective work will be accomplished.
(j) All asphalt job-mix formulas and application methods, including equipment operations, shall conform to the most recent version of the Georgia DOT Standard Specifications Construction of Transportation Systems.
5.7.2 Nonresidential developments.
1) These standards shall apply to new local and minor collector streets in nonresidential subdivision and other nonresidential projects.
2) Asphalt streets. The following materials will be used:
(a) Crushed stone base. The base course shall consist of at least eight inches - ten inches of graded aggregate base, which shall be thoroughly compacted and brought to proper section
(b) Ninety-eight percent base compaction required on all graded aggregate base.
(c) Upon inspection and approval by the DOT inspector, the base shall be primed with 0.25 gallon of R.C. 70 per square yard and cured for three days prior to paving.
(d) Upon final approval of base course two 2 - 5 inches of 19 mm binder shall be applied.
(e) The final one and one-half inch of 9.5 mm or 12.5 mm top course shall be applied after 75 percent of the buildings on the street have been built.
(f) Prior to application of top course, base course shall be inspected for damage and all repairs made.
(g) Prior to applying the top course, a tack coat shall be applied to the binder course at a rate of 0.05 gallons per square yard. The department shall approve type of tack prior to placement.
(h) All asphalt shall be compacted to 95 percent Standard Proctor.
(i) Prior to the dedication to the public of any streets in a nonresidential development, asphalt cores will be taken as described below:
i. For each public street, a minimum four-inch diameter asphalt core sample will be taken for each five hundred lane feet of travel lane, or one per travel direction if the street length is less than three hundred feet. One core sample should be taken from each deceleration lane if a part of the development.
ii. If the core sample is found to be deficient in overall thickness greater than inch, then additional cores will be taken in both directions away from the original core at fifty-foot intervals until a core with minimum required plan thickness is obtained.
iii. Each core sample thickness will then be averaged with all the core samples from the same street to obtain an overall average street pavement
thickness. If the overall pavement thickness is deficient by inch from the required plan thickness, then corrective measures will have to be taken or bonded prior to the final plat being recorded.
iv. Core data will be collected utilizing an independent testing company of the Owner/Developer choice, with all data being furnished to the Department of Transportation directly from the testing firm. Once the data has been collected, the Owner/Developer will make a proposal for the Department of Transportation's approval as to how any corrective work will be accomplished.
(j) All asphalt job-mix formulas and application methods, including equipment operations, shall conform to the most recent version of the Georgia DOT Standard Specifications Construction of Transportation Systems.
(Ord. No. 25-02, § 1(Exh. A), 3-11-25)
5.8 Required paving sections.
5.8.1 Construction standards. All roads shall be constructed in accordance with specifications prepared by Paulding County or Georgia DOT, or, if no design has been prepared, to the following standards as indicated by Table 5-B:
Table 5-B Roadway Paving Sections Street Category Base (Inches) Binder (Inches) Topping (Inches) Principal arterial 10 GAB 5* 11 /2 9.5 mm or 12.5 mm Major arterial 10 GAB 4 19 mm 11 /2 9.5 mm or 12.5 mm Minor arterial 10 GAB 3 19 mm 11 /2 9.5 mm or 12.5 mm Major collector 10 GAB 3 19 mm 11 /2 9.5 mm or 12.5 mm Minor collector 8 GAB 2 19 mm 11 /2 9.5 mm or 12.5 mm Local and residential S3 8 GAB 2 19 mm 11 /2 9.5 mm or 12.5 mm Residential S2 and S1 8 GAB 2 19 mm 11 /2 9.5 mm or 12.5 mm *2" type 19 mm binder and 3" asphaltic concrete base.
(Ord. No. 25-02, § 1(Exh. A), 3-11-25)
5.9 Curb and gutter.
5.9.1 Curb and gutter. All new streets and project access improvements shall be provided with curb and gutter except in subdivisions with all lots one acre or larger, where swale ditches may be provided in lieu of curb and gutter. All gutters shall drain smoothly with no areas of ponding.
5.9.2 Residential curbing. Residential curbing shall meet the following requirements:
1) Concrete shall be class "A" (as defined by Georgia DOT) and have a minimum strength of 3,000 psi at 28 days.
2) Typical minimum section shall be six inches x 24 inches x 12 inches.
3) Vertical (L-back) curbing shall be required in subdivisions where sidewalks are present and may be used in other areas at the option of the subdivider. In residential areas where sidewalks are not required, roll-back curbing is allowed.
5.9.3 Industrial or commercial curbing. Industrial or commercial curbing shall meet the following requirements:
1) Concrete shall be class "A" (as defined by Georgia DOT) and have a minimum strength of 3,000 psi at 28 days.
2) Typical minimum section shall be eight inches x 24 inches x 14 inches.
3) Vertical curbing only (L-back).
5.9.4 Principal arterial and major arterial curbing. Principal arterial and major arterial curbing shall meet the following requirements:
1) Concrete shall be class "A" (as defined by Georgia DOT) and have a minimum strength of 3,000 psi at 28 days.
2) Typical minimum section shall be eight inches x 30 inches x 14 inches.
3) Vertical curbing only (L-back).
5.9.5 Construction methods.
1) Curb and gutter shall be set true to line and grade, and finished to the section shown on the plans. Line and grade shall be set by developer's engineer or surveyor on grades less than two percent and over 12 percent, and within 100 feet in both directions from all low points.
2) One-half inch expansion joints or pre-molded bituminous expansion joint material shall be provided at all structures and radius points and at intervals not to exceed 250 feet in the remainder of the curb and gutter.
3) Inferior workmanship or unprofessional construction methods resulting in unsightly curb and gutter, poor drainage, or areas of ponding will be cause for rejection of finished work.
4) Disturbed areas along all curbing shall be backfilled, stabilized and grassed.
5) Along the project access improvements of a road which the department has identified for resurfacing within one year of the new construction, the grade of the new gutter shall be placed one inch above the project access improvement pavement grade in areas where drainage will not be adversely affected.
6) All special curbing designs (center islands, etc) shall be individually approved by the department.
5.9.6 Local residential - rural streets. Where allowed, local residential - rural streets do not require curb and gutter. The road base shall be extended one foot beyond the edge of the pavement, and the shoulders shall extend a minimum of eight feet from the edge of the pavement to a standard ditch section on each side. Otherwise, the roadway shall comply with the standards for new residential streets as described in these regulations.
(Ord. No. 22-04, § 1, 4-12-2022)
5.10 Roadway drainage.
5.10.1 Georgia DOT specifications apply. Unless otherwise specifically set forth herein or in the Paulding County Standard Details, all of the materials, methods of construction, and workmanship for the work covered in reference to stormwater conveyance facility construction shall conform to the most recent Standard Specifications of the Georgia Department of Transportation.
5.10.2 Sizing and locating drainage structures. Sizing and location of all drainage structures shall be the responsibility of a professional engineer, registered land surveyor, or landscape architect registered by the State of Georgia, subject to approval by the department.
5.10.3 Roadway drainage design. All roadway drainage shall be designed in accordance with the minimum standards set forth in article 8 of these regulations.
5.10.4 Design of other improvements. Catch basins, drop inlets and/or junction boxes shall be designed by the developer's engineer or registered surveyor to state highway standards and subject to final approval by the department.
5.10.5 Bridges. Should a bridge ever be required, it must meet all Georgia DOT standards.
5.10.6 Materials. All structures are to be precast concrete or brick construction in accordance with Georgia DOT standard detail.
5.11 Utilities.
5.11.1 Installation of utilities.
1) All utility systems, including water, sanitary sewer, gas, electric, phone and cable TV, along with component parts, structures, appendages and materials shall be designed to Paulding County standards.
2) All utilities and storm drain facilities within the curbs shall be installed and the ditches backfilled and thoroughly compacted before any pavement or base is installed.
3) Once the base has been placed, all further installation of utilities under the roadway shall be bored or otherwise comply with street cutting requirements shown in article 7 of these regulations.
4) All utility manholes and valve boxes shall be brought flush to the finished grade within the roadway section.
5) All utility locations shall adhere to the Paulding County Utilities Ordinance.
5.12 Sidewalks.
5.12.1 Where required.
1) Sidewalks shall be required in all subdivisions within a one mile driving distance of all existing and proposed public school sites and all existing and proposed public park sites. The required location of sidewalks for such subdivisions shall also include its frontage along a county, city or state road. Sidewalks shall not be required in subdivisions that fall within this one-mile distance of a park or school, if said subdivisions are separated from the park or school by a state highway.
2) In addition to 5.12.1(1) above, sidewalks shall also be required in all subdivisions that have frontage along a county or state road that has sidewalks.
3) Sidewalks provided voluntarily by a builder or developer shall meet the design and location standards required herein. The builder or developer shall secure authorization from the department prior to installation.
5.12.2 Location standards.
1) Sidewalks shall be required adjacent to one side of internal subdivision streets, which shall be the side opposite the water line unless otherwise required (e.g. the zoning ordinance, condition of zoning approval, etc.), which is typically on the north or the east side of the street.
2) Sidewalks shall be required adjacent to deceleration and acceleration lanes along total property frontage.
3) Sidewalks shall not be required adjacent to the perimeter of cul-de-sac turnarounds unless otherwise required.
5.12.3 Design standards.
1) Sidewalks shall be constructed in accordance with the design standards contained in this subsection unless a modification is granted by the department.
2) Sidewalks shall be located two feet from the back of curb, separated from the curb by a beauty strip. Where no curbing exists or proposed road improvements are anticipated, sidewalks shall be placed in a location acceptable to the department.
3) All new sidewalks shall match and provide a smooth transition to any existing sidewalks with no steps.
4) Sidewalks shall be constructed of concrete and shall be a minimum of four feet in width and four inches thick. Concrete shall be class "A" (as defined by Georgia DOT) and have a strength of 3,000 psi at 28 days. Sidewalks adjacent to schools, parks or any other pedestrian facilities, as well as adjacent to acceleration/deceleration lanes shall be six feet in width.
5) Curb ramps shall be provided at all curb termini and shall be a minimum of four feet in width exclusive of flared sides.
6) Expansion joints shall be provided at all property lines (extended) and driveway crossings. Expansion joints shall be provided every ten feet.
7) All sidewalks shall meet ADA requirements.
8) Disturbed areas resulting from sidewalk construction shall be backfilled, stabilized and grassed.
5.12.4 Installation deadlines.
1) Sidewalks required on residential building lots shall be installed prior to issuance of a certificate of occupancy for each individual dwelling.
2) Sidewalks required on other projects shall be installed prior to issuance of a certificate of occupancy.
5.13 Traffic control.
5.13.1 General. All traffic control devices including signs, signals and markings shall be installed in accordance with the most current edition of the Manual on Uniform Traffic Control Devices.
5.13.2 Work zone safety.
1) All storage of materials, excavation, backfilling, pavement removal and replacement, clean-up and grassing shall be in strict accordance with the applicable state or county regulations. It shall be the contractor's responsibility to determine the exact requirements of the authority having jurisdiction over the right-of-way. No highway, road or street shall be closed to traffic without authorization from the proper authority. The contractor shall provide suitable lights, signs, barricades and flagmen to insure the safety of pedestrian and vehicle traffic and workmen to protect the work.
2) The contractor shall coordinate the closing of any street at least ten days in advance with the Paulding County Department of Transportation {770-445-4759}.
3) The contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights and other traffic control devices; shall provide qualified flagmen where necessary to direct traffic; and shall take all necessary precautions for the protection of the work and safety of the public.
4) Placement and removal of construction traffic control devices shall be coordinated with the department.
5) Placement of construction traffic control devices shall be scheduled ahead of associated construction activities. Construction time in street right-of-way shall be conducted to minimize the length of time traffic is disrupted.
6) Construction traffic control devices shall be removed immediately following their useful purpose. Traffic control devices used intermittently, such as "Flagmen Ahead," shall be removed and replaced when needed.
7) When working within Paulding County rights-of-way, provide trained and certified flag people who have completed a training program approved by the Georgia DOT.
8) Existing permanent traffic control devices within the construction work zone shall be protected from damage due to construction operations. All damaged traffic control devices requiring temporary relocation due to construction shall be located as near as possible to their original position. Their original position shall be measured from permanent reference points and recorded in a permanent log prior to relocation.
Temporary locations shall provide the same visibility to affected traffic as the original position. Relocated permanent traffic control devices shall be reinstalled in their original positions as soon as practical following construction in the affected location.
Construction traffic control devices shall be maintained in good repair, clean and visible to affected traffic for daytime and nighttime operation. Traffic control devices affected by the construction work zone shall be inspected daily.
9) Construction warning signs shall be black legend on an orange background. Regulatory signs shall be black legend on a white background. Construction sign panels shall meet the minimum reflective requirements of the department. Sign panels shall be of durable materials capable of maintaining their color, reflective character and legibility during the period of construction.
5.13.3 Signs.
1) Street name signs and stop signs shall be installed at all intersections within a development. All intersections shall contain a minimum of two street name signs and stop signs as appropriate for the intersection. Street name signs shall have a six inch green background with four inch white legends. Signs shall be mounted on threepound, 12 foot green U-channel posts.
2) The location of all street signs shall be in accordance with the standard details.
3) A "Speed Limit" sign shall be posted at each development entrance. Speed limits shall be set by the department or the Georgia DOT.
4) A "Watch for Children" sign shall be posted at each subdivision entrance.
5) All required permanent signs shall be installed by the department. The developer shall pay for materials and installation prior to final plat approval.
6) If a decorative sign and post installation is desired by the developer and approved by the department, the developer or homeowner's association shall be responsible for the installation and perpetual maintenance thereof. Failure to comply with maintenance requirements will result in the county taking over such maintenance with the installation of standard signs and posts.
7) The developer shall be responsible for the installation of a temporary stop sign and street name sign at the entrance/exit of the development prior to final plat approval.
5.13.4 Pavement markings.
1) The developer shall be responsible for the installation of all striping and pavement markings. All required striping must be complete prior to approval of the final plat.
2) Thermoplastic shall be used for all permanent striping and pavement markings.
3) All striping shall be done in accordance with the most current edition of the Manual on Uniform Traffic Control Devices.
5.13.5 Traffic signals.
1) Where required, traffic signals will be installed at the developer's expense.
2) All work will be in accordance with approved signal design.
3) Traffic signals must be in full operation prior to acceptance by the county.
5.13.6 Street lights. As required by the Paulding County Street Light Ordinance, the installation of all street lighting fixtures within county right-of-way must be approved by the department prior to such installation.
5.14 Roadway design.
5.14.1 Street grades and design speeds.
1) Minimum grade for all local streets shall be 2.0 percent. Minimum grades for all major collector and arterial streets shall conform to Georgia DOT practice.
2) Minimum grade of less than 2.0 percent on a local street may be approved by the Paulding County Department of Transportation, based on adequate engineering designs, where at least 2.0 percent cannot reasonably be achieved due to topographical limitations imposed by the land. In such cases, a record drawing and such computations as necessary shall be provided after construction to establish that the street will drain in accordance with these regulations. Street sections where unacceptable pooling, excessive spread at catch basins or other hazardous conditions occur shall be reconstructed or otherwise improved to eliminate such conditions.
3) Minimum vehicle design speeds and maximum grades allowable in Paulding County by street classification shall be as shown in table 5-C.
4) Maximum grade on any cul-de-sac turnaround shall be six percent.
Table 5-C Minimum Design Speeds and Maximum Grades Street Category Maximum Grade (Percent) Design Speed (mph) Principal arterial 6 60 Major arterial 8 50 Minor arterial 9 50 Major collector 10 40 Minor collector 10 30 Local and S3 14 25 S1 and S2 16* 25 *Grades between 14 percent and 16 percent shall not exceed a length of 150 feet, unless otherwise specified by the department of transportation, and shall require an "as graded" survey prior to the installation of the curb or utilities. The distance shall be measured as the tangent length between points of curvature.
5.14.2 Vertical street alignment.
1) All changes in street profile grades having algebraic difference greater than one percent shall be connected by a parabolic curve having a minimum length (L) equal to the product of the algebraic difference between the grades in percent (A) and the design constant (K) assigned to the street according to its category (i.e., L = KA).
2) Constant (K) values are shown in the table 5-D for both desirable and minimum acceptable ("hardship") conditions. In all cases, the "desirable" value shall be used, unless it cannot be achieved due to topographic conditions beyond the developer's control. In such hardship situations, the department may approve a lesser value to the extent required by the hardship situation, but in no event less than the value shown in the table as "minimum."
Table 5-D Constant (K) Values for Vertical Curves Crest Curves Sag Curves Street Category Minimum Desirable Minimum Desirable Principal arterial 200 320 125 155 Crest Curves Sag Curves Street Category Minimum Desirable Minimum Desirable Major arterial 100 170 80 110 Minor arterial 100 170 80 110 Major collector 55 80 55 70 Minor collector 30 30 35 35 Local and S3 20 20 20 20 S1 and S2 15 20 15 15
5.14.3 Horizontal street alignment.
1) All new public streets shall adhere to the following standards set forth in Table 5-E governing curvature and superelevation or as outlined in latest edition of the AASHTO publication entitle "A Policy on Geometric Design of Highways and Streets."
2) All new private streets shall adhere to the standards above, with the exception of those zoning categories RD Duplex District, MHP Manufactured Home Park District, and R-55 Active Adult residential, where ownership of development is under a single entity with private street(s), S1 and S2 streets are allowed to have a minimum horizontal curve radius of 50 feet, provided overall street design and layout does not promote a speed greater than 30 mph throughout the development.
Table 5-E Horizontal Curves Street Category Minimum Radius (Feet) Maximum Superelevation Principal arterial 1,333 0.06 Major arterial 833 0.06 Minor arterial 560 0.04 Major collector 560 0.04 Minor collector 300 0.04* Local and S3 120 0.00 S1 and S2 100 0.00 S1 and S2** 50 0.00 *No superelevation will be allowed on minor collectors internal to residential subdivisions.
**Permitted on qualifying private residential streets as set forth in section 5.14.3.2.
3) Superelevation for horizontal curves shall be calculated utilizing the following formula:
R = Minimum radius curve V = Vehicle design speed, (MPH) E = Rate of superelevation (decimal of a foot rise per foot of roadway) R = V
15 (E+F) F = Side friction factor, as follows:
Vehicle design speed (V) 30 40 50 60 Side friction factor (F) .16 .15 .14 .12
4) Widening section along existing streets shall be designed reflecting existing curvature and superelevation, if any, unless the existing street has been included in a specific design by the county or Georgia DOT, which calls for different standards, in which case the project will be coordinated with the overall design.
5) Superelevation runoff. Roadway edge curves shall be provided for tangent runout (bringing edge from a normal crown to centerline elevation) and superelevation runoff (from the end of tangent runout to the point of design superelevation) in accordance with design standards of the Georgia Department of Transportation or other professional engineering standards.
6) Tangents and compound curves. Between reverse horizontal curves there shall be not less than the minimum centerline tangents shown in table 5-F unless otherwise specified by the Georgia Department of Transportation. Compound radii curves are prohibited. At least the "desirable" length shall be provided unless hardship conditions of topography or property configuration will not allow lengths greater than those shown as "minimum". For compound circular curves, the ratio of the flatter radius to the sharper radius shall not exceed 1.5 to 1.
Table 5-F Tangents Street Category Minimum Tangent Length (in feet) Desirable Tangent Length (in feet) Principal arterial 150 180 Major arterial 125 150 Minor arterial 100 120 Major collector 100 120 Minor collector 75 90 Local and S3 50 60 S1 and S2 50 60 Note. Minimum tangents are based on the distance traveled in 1.7 seconds at the design speed for each category of street. Desirable length is based on distance traveled in 2.0 seconds.
5.14.4 Horizontal and vertical clearances.
1) Horizontal clearances.
(a) A shoulder of no less than 12 feet from the back of curb or edge of pavement, appropriately graded and having gentle slopes of not more than one-half inch per foot and rounded cross-sectional design shall be maintained along all streets. Beyond the shoulder but within the right-of-way, slope shall not exceed one foot of rise for each two feet of horizontal distance on a cut slope, and one foot of fall for each two feet of horizontal distance on a fill slope.
(b) Along all public streets, a clear zone shall be provided for a minimum distance of six feet from back of curb or edge of pavement wherein nothing may be located above ground level except traffic/street signs, public utility structures and mail boxes.
(c) At selected locations, such as the outside of a sharp curve a wider clear zone with greater horizontal clearances provided to any roadside obstruction may be required.
(d) The department, in accordance with O.C.G.A. § 32-6-51, is authorized to remove or direct the removal of any sign, signal, device, or other structure erected, placed, or maintained on the right-of-way of a public road which because of its nature, construction or operation, constitutes a danger to, or interferes with the vision of, drivers of motor vehicles.
2) Vertical clearances.
(a) Vertical clearance at underpasses shall be at least 16 feet over the entire roadway width.
(Ord. No. 23-02, § 1 (Exh. A), 1-10-2023)
5.15 Street intersections.
5.15.1 Angle of intersection. Intersections shall generally be at 90 degree angles and shall not be at an angle of less than 85 degrees unless approved by the department, nor less than 80 degrees unless the intersection is signalized, in which case the angle of the intersection may be reduced subject to the review and approval of the department.
5.15.2 Maximum grade. Street intersections should be designed with a flat grade wherever possible, but in no case should the grade exceed two percent in normal situations (or four percent in topographical hardship situations on local streets).
5.15.3 Intersection approaches: horizontal alignment.
1) New residential S1 and S2 streets that approach an intersection with a street in a category higher than itself on a horizontal curve having a centerline radius less than 240 feet shall provide a tangent section of roadway at least 30 feet long. Minor collectors or residential S3 streets approaching an intersection with a major thoroughfare on a horizontal curve having a centerline radius of less than 550 feet shall also provide the 30 feet tangent section. The tangent length shall be measured along the centerline of the street, from the right-of-way line of the intersection street, extended, to the point of tangency with the centerline of the curve section.
2) New major collectors or arterials shall provide tangent sections at intersections with streets in equal or higher categories as needed to provide adequate stopping sight distance at their design speeds.
5.15.4 Intersection approaches: vertical alignment.
1) For intersections with local or minor collector streets, a leveling of the street at a grade not exceeding two percent shall be provided but no level approach distance is required for streets approaching at less than seven percent, and a minimum 25-foot level approach distance shall be provided for streets approaching at a grade of seven percent or more.
2) As a street approaches an intersection with a major thoroughfare, there shall be a suitable leveling of the street at a grade not exceeding two percent and for a distance not less than the following minimums:
Table 5-G Approach Distances at Major Intersections Approaching Street Category Minimum Approach Distance (Feet) Principal arterial 100 Major arterial 100 Minor arterial 100 Major collector 75 Minor collector 75 Local and S3 50 S1 and S2 25 *Distance of the approach is measured from edge of pavement of the intersecting street to the point of curvature in the approaching street.
5.15.5 Intersection radii. Intersection radii for roadways measured at back of curb and for the right-of-way lines shall be as follows: For intersecting streets of difference classification, the larger radii shall be provided. In all cases, adequate right-of-way shall be provided to maintain a minimum of 11 feet from back-of-curb. Larger radii may be required for streets intersecting at angles less than 90 degrees.
Table 5-H Intersection Radii Street Category Roadway Radii (Feet) Right-of-Way Radii* (Feet) Arterial 40 20 Major collector 40 20 Minor collector—residential 25 9 Minor collector—nonresidential 40 20 Local-residential 25 11 Local-commercial or office 25 11 Local-industrial 40 25 *Intersection right-of-way lines will be accomplished by a miter which cuts across the right-of-way lines connecting the points where the required radius would have otherwise been tangent.
5.15.6 Islands. The design, location and maintenance agreement of all traffic islands and medians shall conform to the requirements outlined in the latest edition of AASHTO and shall be subject to the approval of the department.
5.15.7 Sight distance.
1) Driveways shall not be located on a short-crest vertical curve, just beyond a short-crest vertical curve or on a sharp horizontal curve. All driveways shall be located, designed and constructed so that motorists will have adequate sight distance in both directions along the roadway. A permit shall not be issued for a driveway when adequate sight distance is not available.
2) Sight distance as used for driveways shall be measured from a point 15 feet from the edge of the travel way at a height of 3.5 feet above the surface of the roadway to an object on the centerline of the road two feet above the surface of the roadway (see standard detail).
3) Sight distance shall be measured and field certified by a registered professional engineer or surveyor. A certification statement shall be placed on the construction plans.
5.15.8 Obstructing visibility at intersections.
1) On any corner lot, within an area formed by the lot lines on the street sides of such lot and a line (miter) on the street sides of such lot and a line (miter) joining points on such lot lines located at a distance of 20 feet from the point of their intersection, the following shall apply:
(a) There shall be no fence or wall or hedge higher than three feet.
(b) There shall be no obstruction to vision, other than a post or column or tree (except standards erected by Paulding County) not exceeding one foot in greatest cross-sectional dimension, between a height of 15 feet above the established grade of either of the intersecting streets.
(Ord. No. 23-12, § 1(Exh. A), 12-12-2023)
5.16 Driveway intersections.
5.16.1 Angle and improvements. Driveways shall generally intersect streets at right angles. The portion of a driveway located within a public right-of-way shall be paved.
Driveways providing access to parking lots that contain six or more spaces shall be paved in accordance with the parking lot requirements of the zoning ordinance.
5.16.2 Driveway design standards.
1) Driveways serving single-family detached or duplex residences shall be no less than ten feet wide at the right-of-way line and shall provide a radius to the back of curb or edge or pavement of the roadway of no less than five feet.
2) All driveways and driveway curb cuts on state highways shall conform to Georgia DOT standards unless county requirements are more restrictive.
5.16.3 Auxiliary lanes. Along any collector or arterial, a deceleration lane, acceleration lane, larger turning radius, traffic islands, or other devices or designs may be required to avoid specific traffic hazards which would otherwise be created by the proposed driveway location.
ARTICLE 6 WATER MAINS AND ACCESSORIES
6.1 General.
6.1.1 Scope.
1) The contractor or developer shall furnish all equipment, labor, and materials (unless otherwise agreed upon in writing) necessary to construct the water mains and perform all work specified or indicated on the standard details. The work shall include all necessary concrete work, diking, pumping, bailing, draining, flushing, soil erosion and sedimentation control, and testing. These specifications cover mains and water service connections complete. The water mains shall be installed in the locations indicated on the standard details or as otherwise directed by the water, sewer and environmental services department (hereafter referred to in this article as "the department.").
2) The contractor shall arrange his work so as to minimize interference with pedestrian and vehicular traffic, and to avoid interruption of service of any existing utilities.
The contractor shall furnish and maintain suitable bridges, footways, or other means of access to or across intercepted streets, alleys, driveways and walkways, where necessary.
3) The contractor shall be responsible for removing all water from excavations and trenches whether from surface or ground sources.
4) The contractor shall guarantee all material and workmanship for a period of one year from the date of final acceptance of the work. If during this period any material or workmanship, etc., proves defective, the contractor shall repair same at his own cost and expense and to the satisfaction of the department.
5) In addition to the responsibility of the contractor for remedying observed defects in his work during the guarantee period, the contractor shall also reimburse the department for all expenses incurred in investigations to assure the department that the completed work is in accordance with these specifications.
6.1.2 Applicable specifications and standards. The latest editions of the following specifications, standards and publications setting the minimum requirements for quality, safety and performance of work and materials form a part of these regulations as though fully repeated herein:
ASTM American Society of Testing Materials ANSI American National Standards Institute AWWA American Water Works Association OSHA Occupational Safety and Health Administration
6.1.3 Record standard details.
1) The contractor shall be responsible for maintaining a set of the approved design standard details, which have been marked to reflect as-built conditions. These "record standard details" shall be kept at the site during working hours and shall be made available to the department's inspectors upon request.
2) The record standard details shall show the as-built location of, but not be limited to, all lines, manholes, valves, hydrants, blow-off valves, monuments, etc.
3) Valve locations shall be dimensioned to two permanent fixtures or objects.
6.2 Excavation, trenching and backfilling.
This section covers the excavation, trenching, and backfilling for all water mains.
6.2.1 Density tests.
1) All trenches 12 inches or wider, as measured at the top, that are within roadways, or roadway right of ways, parking areas, and areas to be paved shall be tested for conformance to specified compaction requirements:
(a) These trenches shall be backfilled and compacted to their full depth.
(b) Tests shall be made within each 400 square feet of trench areas for each one foot of lift above top of conduit. Tests taken in one foot lifts shall be staggered.
(c) Compaction shall not be less than that of the surrounding areas or 95 percent of the maximum dry density as determined by the Standard Proctor Test. The top 12 inches shall be compacted to a minimum of 98 percent of the maximum dry density.
(d) Backfill within the Georgia Department of Transportation right-of-way shall meet all requirements as stipulated in the "Utility Accommodation Policy and Standards", as published by the Georgia Department of Transportation.
2) All trenches 12 inches or wider, as measured at the top, that are not within roadways, or other areas to be paved shall be compacted to not less than that of surrounding areas or 90 percent of the maximum dry density.
6.2.2 Sheeting and shoring materials.
1) Construction wood sheeting may be new or used lumber of a species or grade suitable for the proposed use.
2) If steel sheet piling is used, it shall conform to ASTM A328 and consist of rolled sections of the continuous interlocking type. Minimum thickness of the web and flange metal shall be 3
/8-inch, unless otherwise approved or specified. Rivet steel and structural material as fabricated connections and accessories shall conform to requirements of ASTM A502 and ASTM A36. All steel sheet piles shall be furnished with standard pulling holes located approximately four inches below the top of the pile.
3) The contractor shall retain full responsibility for the structural integrity and adequacy of the sheeting.
6.2.3 Sheeting and shoring activities.
1) All excavations shall be properly shored, sheeted and braced or cut back at the proper slope to furnish safe working conditions; to prevent shifting of material; to prevent damage to structures or other work; and to avoid delay to the work. Work shall be performed in all compliance with the most recent U.S. Department of Labor Occupational Safety and Health Administration 29CFR part 1926 Occupational Safety and Health Standards-Excavations, Final Rule. Bracing shall be so arranged as not to place any strain on portions of completed work until the general construction has proceeded far enough to provide ample strength.
2) Timber sheet piles shall be sharpened in a manner which will assist in holding them in true alignment during driving and the tops shall be protected with caps or other means to prevent damage by the driving equipment. Any pieces damaged or split below the point of cutoff shall be removed and replaced with undamaged pieces.
3) Sheet piles shall be carefully located and driven straight and true to the desired elevation with secure interlocking for the entire length. Damaged piling or one with faulty alignment shall be withdrawn and new piling driven properly in its place.
Jetting will not be permitted. Excavation shall not be carried in advance of the sheet piling.
4) Sheeting and bracing shall be removed as the excavation is refilled in such a manner as to avoid caving in of areas or structures. Voids left by withdrawal of the sheeting shall be carefully filled by ramming.
6.2.4 Excavation.
1) The contractor shall perform all excavation in accordance with the most recent OSHA standards and to the depths required or as shown on standard details. During excavation, materials suitable for backfilling shall be piled a minimum distance of two feet from the banks of the excavation to avoid overloading and to prevent slides and cave-ins.
2) Excavated materials not required for fill or backfill shall be removed from the site.
Unless otherwise indicated or specified, all excavation shall be made by open cut. No tunneling shall be done.
3) Excavation shall not be carried below the designated level except where special bedding required due to unforeseen conditions, or is specified or shown on the standard details. Excess excavation below the designated level shall be backfilled with crushed stone and tamped.
4) Excess excavation for manholes and other structures shall be filled with crushed stone or concrete to the required elevation.
5) Trenches shall be only of sufficient width to provide a free working space on each side of the pipe. To prevent excess pressure on the pipe, the maximum width of pipe trench at the top of the pipe shall not be greater than two feet more than the pipe diameter.
If this maximum width is exceeded for water or sewer pipelines, the contractor shall provide class A bedding as presented in article 7 of these regulations. The top portion of the trench above four feet shall be excavated with sloping sides in accordance with OSHA standards to any width which will not damage adjoining structures, roadways, pavements, utilities or private property. If it is deemed necessary to excavate trench with vertical sides, then OSHA approved shoring and sheeting methods shall be used.
6) All water mains shall have a minimum of 48 inches of cover above the top of the pipe or 48 inches below edge of pavement, whichever is greater. All water mains 12 inches and larger shall have a minimum of 60 inches of cover above the top of pipe or 60 inches below edge of pavement, whichever is greater unless otherwise indicated by the department.
7) The trench bottom shall be made to conform as near as possible to the shape of the lower third of the pipe. Excavation shall be made for joints of all pipes, and shall be of sufficient depth to permit access to the joint for construction and inspection. In no case shall the joints be used to support the body of the pipe. Bell holes shall be excavated in the trenches so as to relieve pipe bells of all load, but small enough to insure that support is provided throughout the length of the pipe barrel.
8) Unstable soil or soil unable to achieve 95 percent compaction as per Standard Proctor shall be removed and replaced with crushed stone, which shall be tamped.
9) Ground adjacent to all excavations shall be graded to prevent inflow of water.
10) The excavation of the trench shall not advance more than 100 feet ahead of the completed pipe work.
11) The contractor shall remove any water accumulated during excavation, whether from ground or surface sources.
12) The inspector shall be notified immediately upon encountering site conditions at variance to those indicated and any active or inactive utility encountered not indicated on the standard details.
13) No work shall be done to correct or incorporate unforeseen conditions until written instructions are issued.
14) No trenches will be permitted to be left open overnight, on weekends, or on holidays.
6.2.5 Rock excavation.
1) All rock encountered shall be removed six inches below the bottom grade of the trench where pipe is being laid, and the trench built back to the correct grade with suitable select material thoroughly tamped into place, unless the contractor is specifically directed to place stabilization material.
2) Blasting permits for each development shall be required. Blasting shall be done with the precautions specified by the state fire marshal and the Paulding County Fire Chief.
3) The contractor shall notify county fire departments prior to blasting operations.
4) All blasting operations and all handling, storage and use of blasting materials shall be in strict accordance with federal, state and local ordinances and regulations and shall be approved by the state fire marshal. Blasts shall be restricted to the extent that no appreciable shock will be transmitted to existing structures, pipe lines, sewers, cables or other public or private facilities. The contractor shall be wholly responsible for any and all personal injury or property damage resulting from blasting.
6.2.6 Backfilling.
1) No backfilling shall be done over pipelines until all pipes have been inspected and approval received from the inspector, unless otherwise directed by the department.
2) Trenches shall be backfilled with earth backfill materials (minimum class D; see standard details) placed evenly around and on both sides of the pipe in six inches maximum layers, and tamped until pipe has cover of not less than 12 inches above top of pipe. The remaining backfill shall be placed evenly in 12 inch layers compacting each layer thoroughly to the specified compaction. Water settling shall not be permitted. Any trenches where settlement occurs shall be reopened, refilled and compacted, with the surface restored to the specified grade and compaction, and leveled for grassing.
3) Prior to backfilling at manholes, structures, and other accessories, all forms, trash and debris shall be removed. Backfill material shall be symmetrical on all sides in eight inch maximum layers. Each layer shall be moistened and compacted with tamps.
4) Where pipes are in a fill section or are projecting into fill sections, ductile iron pipe shall be provided. Where material beneath the pipe is determined by the department to be unstable, then concrete foundation supports at each joint shall be provided.
Where pipe is not structurally supported, unstable material shall be removed and trench stabilization provided. A pipe bed shall be constructed of No. 57 crushed stone and be compacted to at least 90 percent of the maximum dry density, unless otherwise specified.
5) The material shall be placed evenly in six inch maximum layers to the proper subgrade unless otherwise directed by the department. After the trench has been stabilized, normal backfill and compaction operations shall resume as specified herein.
6) Prior to final acceptance of the pipeline installations, the contractor shall refill all sunken trenches and excavations to final grade.
7) Earth backfill shall be free of stone and boulders. Acceptable backfill material may be from excavation or borrowed.
8) No rock will be allowed in the backfill within a distance of six inches from the pipe or the ground surface, and rock larger than six inches in the greatest dimension will not be permitted in any part of the trench.
6.2.7 Subsurface obstructions.
1) The standard details indicate underground utilities or obstructions that are known to exist according to the best information available to the department. The contractor, as required by Georgia law, shall call the Utilities Protection Center (UPC) and those utilities, agencies or departments that own and/or operate utilities in the vicinity of the construction work site to verify the location of, and possible interference with, the existing utilities, arrange for necessary suspension of service and make arrangements to locate and avoid interference with said utilities. Where these or unforeseen underground utilities are encountered, the location and alignment of the new facilities may be changed to avoid interference, upon written approval from the department.
2) The contractor shall furnish and have available at all times an electronic pipe detector, in good working order, to locate existing pipe lines or other obstructions.
3) While excavating, backfilling and laying pipe, care must be taken not to remove, disturb, or injure any existing water, sewer, or gas pipes, or other conduits or structures. If necessary, the contractor, shall sling, shore up and maintain such structures in operation, and within a reasonable time shall repair any damage done to them. Before final acceptance of the work, he shall return all such structures to original condition.
4) The contractor shall give sufficient notice to the interested utility of his intention of removing or disturbing any pipes, conduits, etc., and shall abide by their regulations governing such work. In the event that any subsurface structure becomes broken or damaged in the course of the work, the contractor shall immediately notify the proper authorities, and shall be responsible for all damage to persons or property caused by such damage.
5) When pipes or conduits providing services to adjoining buildings are broken during the progress of the work, the contractor shall repair them at once, or if repaired by the utility involved, shall pay the utility any charges for having such repairs made by the utility.
6) The department will not be liable for any claim made by the contractor based on underground obstructions being different to that indicated in these regulations or on the plans.
6.3 Materials.
6.3.1 General.
1) Materials to be incorporated into the work shall be new and unused, and shall conform to all applicable requirements of these specifications. Submittal and approval of all materials, shop standard details, or samples shall be in conformance with these specifications. Any materials installed prior to approval by the department will be subject to rejection, and will be removed at the contractor's expense.
2) All water mains shall be ductile iron pipe unless otherwise specified by the department for extenuating circumstances.
3) All service lines shall be copper tubing unless otherwise specified by the department for extenuating circumstances.
4) Any pipe and services installed below elevation 1,000 feet or in designated high pressure zones shall conform to applicable specifications.
5) Acceptance will be on the basis of inspection and the manufacturer's written certification that the pipe, fittings and appurtenances were manufactured and tested in accordance with the applicable standards.
6) Any pipe, fittings and appurtenances used in the installation or repair of water mains or services shall be lead-free pipe and fittings by an all-American manufacturer.
6.3.2 Ductile iron pipe (dip).
1) Ductile iron pipe shall conform to AWWA C 151 (ANSI A21.51) and shall be a minimum of pressure Class 350 or thickness Class 50 unless otherwise specified or shown on the standard details. Sizes will be as shown. All pipes shall be furnished in minimum lengths of 18 feet. Pipe and fittings shall be cement lined in accordance with AWWA C
104. Fittings shall be mechanical joint compact ductile iron and conform to AWWA 153 with rated working pressure of 350 psi or AWWA C 110 with rated working pressure of 250 psi. Pipe and fittings shall be furnished with a bituminous outside coating.
2) Joints shall be push-on type for pipe and standard mechanical joints for fittings with the exception of hydrant fittings. Fittings for bends and hydrants shall be mechanical joint with retainer glands. Hydrant tees used in lieu of retainer glands and harness rods on fire hydrants shall be equal to ACIPCO A10180 or U.S. Pipe U-592. Anchor couplings used in lieu of retainer glands and harness rods on fire hydrant leads shall be American A-10895 or approved equal. Joints shall conform to AWWA C 111. Provide and install the appropriate gaskets, nuts and bolts for mechanical joints. Nuts shall be steel with American Standard Regular hexagonal dimensions, all as specified in ANSI B 17.2.
3) All bolts and all nuts shall be threaded in accordance with ANSI B. 1.1, Coarse Thread Series, Class 2A and 2B fit.
4) When flanged joints are indicated provide gaskets for flange joints made of 1 /8-inch
thick cloth reinforced rubber. Gaskets may be ring type or full-face type.
5) Provide bolts for flange connections. Bolts shall be steel with American Regular unfinished square or hexagon heads. Nuts shall be steel with American Standard Regular hexagonal dimensions, all as specified in ANSI B 17.2. All bolts and all nuts shall be threaded in accordance with ANSI B 1.1, Coarse Thread Series, Class 2A and 2B fit.
6.3.3 Polyvinyl chloride pressure rated pipe (PVC).
1) When permitted in lieu of DIP, pipe for water mains shall be polyvinyl chloride (PVC) C900 pipe. The pipe shall conform to AWWA C900, shall be DR-14 and a pressure rating of not less than 200 psi. The PVC material shall be designated as PVC 1120 and shall conform to ASTM 1784. The joints shall be gasketed bell joints conforming to
ASTM D 3139.
2) PVC pipe will not be allowed if pressures exceed 175 psi.
3) All PVC pipe shall bear the NSF (National Sanitation Foundation) seal of approval for potable water use.
6.3.4 Service tubing.
1) Copper tubing shall be ASTM B 88, Type K. Fittings shall be brass with compression connection inlets and outlets, ANSI B 16.26.
2) Where required, adapters shall be brass ANSI B 16.18. Unions shall be cast bronzes.
Joints shall be compression type.
6.3.5 Gate valves.
1) Gate valves size three inches and larger shall be resilient seat wedge type and shall conform with the specifications of the American Water Works Association, Designation C509, latest edition rated for 200 psi minimum working pressure. Gate valves shall be equipped with "O" ring stem seals above and below stem thrust collar. Gate valves for use on mechanical joint ductile iron pipe and slip joint ductile iron pipe shall have manufacturer's standardized mechanical joint ends. Gate valve body and bonnet shall be ductile or cast iron and shall be fusion bonded, interior and exterior, with epoxy coating which conforms to AWWA C-550, latest edition.
2) Water mains in which the valves are installed shall be tested as specified and the valve must remain water tight under this pressure in each direction.
3) Valves shall open counter clockwise (no exceptions will be allowed); shall be designed for vertical installation; and shall be the nonrising stem type.
4) Valves shall be equipped with valve boxes. Provide extension stem where required to bring the operating nut to within 36 inches of ground surface and shall have a 24 inches x 24 inches x ten inches concrete collar poured in place. Trowel level with ground surface.
5) All gate valves shall be manufactured by Mueller or M and H Valve.
6) Gate valves 21 /2 inches in diameter and smaller shall be bronze, heavy duty, rising stem (21
/2 inches and smaller only), rated for 200 psi WSP. Valves shall conform to Federal Specification WW-V-54, Class A, Type II, and shall be equal to Crane 428.
6.3.6 Butterfly valves.
1) Butterfly valves shall be resilient seated, short body design and shall conform to AWWA C-504 latest edition. Valves shall be Class 250 (250 psi bi-directional shut-off rating, 500 psi body hydrostatic shell test, fusion bonded epoxy coated interior and exterior, and maximum line velocity of 16 feet per second). Valves shall be Mueller Class 250 M. J. (12" - 48"), M and H Style 4500 M. J. (12" - 48"), or PRATT valve.
Certified test results shall be furnished with each valve.
2) All 24 inches and larger butterfly valves shall have six inch bypass line to gate valve assembly.
6.3.7 Valve boxes. All valve boxes and valve box risers shall be cast or ductile iron. Valve boxes shall be two-piece heavy roadway type with inside diameter of barrel not less than five inches. Valve covers shall weigh a minimum of 13 pounds. They shall be the extension type with screw-type adjustment and with flared base. The minimum thickness of metal shall be 3
/16-inch. The word "WATER" shall be cast on the cover. The boxes shall be of such length as will be adapted without full extension, to the depth of cover required over the pipe at the valve location. All valve boxes and valve box risers shall be manufactured in U.S.A only.
6.3.8 Tapping valves and sleeves.
Existing Pipe Size (Inches) Largest Tap Permitted* 6 not permitted Existing Pipe Size (Inches) Largest Tap Permitted* 8 6-inch 10 8-inch 12 10-inch 14 12-inch 16 14-inch 20 16-inch 24 Cut-in 30 Cut-in *Next smallest pipe size is largest tap permitted.
1) Tapping sleeves shall be cast or ductile iron of the split-sleeve, mechanical joint type.
Valves shall be resilient seat gate valves sizes six inches - ten inches.
2) Tapping valves shall be Mueller Model H-687 sizes 4" - 10", H-667 sizes 12" - 24", M & H Style 3751-NRS sizes 4" - 10" or Style 751 sizes 12" - 24". Sleeves shall be Mueller Model H-615, M & H Style 1174-01.
6.3.9 Double check backflow preventers.
1) Double check backflow preventers shall conform to the following standards: A.S.S.E.
No. 1015, A.W.W.A., C506, C.S.A. B64.5, FCCCHR of USC Manual - Section 10, U.L.
Classified File No. EX3185, and be accepted by IAPMO (UPC), SBCCI (Basic Plumbing Code).
2) Shut-off valves for backflow preventers in sizes two inch and smaller shall be full-port ball-type, with threaded connections and bronze bodies with copper content not less than 80 percent. Shut-off valves for backflow preventers in sizes 21 /2 inches and larger
shall be fullport ball-type, or resilient-wedge gate-type, with flanged connections, and iron bodies with FDA-approved fusion bonded epoxy coating inside and out.
3) Double check backflow preventers shall be Ford or approved equal.
6.3.10 Double detector check valve assembly.
1) Double detector check valve assemblies shall conform to the following standards:
A.S.S.E. Standard No. 1015, AWWA Standard C 506; FCCCHR of USC Manual Section 10., U.L. Classified File No. EX 3185, and be listed under CSA B.64 Standard.
2) All assemblies shall be standardly equipped with epoxy coated UL/FM listed OS & Y resilient seat gate valves. Check valve bodies shall be epoxy-coated cast iron. The by-pass line unit shall consist of an approved double check backflow preventer and water meter that reads in gallons.
3) Double detector check assemblies shall be Watts 709DDC or approved equal.
6.3.11 Valve markers. Valve markers shall be four feet long concrete posts. They shall have "WATER" imprinted on one side. A brass disc shall be cast into the marker immediately below the imprint indicating the distance to the valve.
6.3.12 Corporation cocks and curb stops.
1) All 3 /4-inch and one inch corporation cocks shall be Mueller or Ford or approved equal.
All 11 /2 inches and two inches corporation cocks shall be Mueller or Ford or approved equal.
2) Curb stops for water service connections shall have a compression connection on one end and a male I.P.T. on the other end. Water service curb stops shall be Mueller or Ford or approved equal. Ball style curb stops shall include integral lock wings.
3) Curb stops for two inch blow-off assemblies shall have inside I.P.T. on both ends. They shall be Mueller or Ford or approved equal.
6.3.13 Fire hydrants.
1) All fire hydrants shall conform to the requirements of AWWA C 502 for minimum 150 psi working pressure. Hydrants shall be the compression type, closing with line pressure. The valve opening shall not be less than 51
/4 inches.
2) In the event of a traffic accident, the hydrant barrel shall break away from the standpipe at a point above grade and in a manner that will prevent damage to the barrel and stem, preclude opening of the valve, and permit rapid and inexpensive restoration without digging or cutting off the water.
3) The means for attaching the barrel to the standpipe shall permit 360 degree rotation.
4) Hydrants shall be fully bronze mounted with all working parts of bronze. Valve seat ring shall be bronze and shall screw into a bronze retainer.
5) All working parts, including the seat ring shall be removable through the top without disturbing the barrel of the hydrant.
6) The operating nut shall match those on existing hydrants. The operating threads shall be totally enclosed in an operating chamber separated from the hydrant barrel by a rubber O-ring stem seal and lubricated by grease or an oil reservoir. A stop nut shall be positioned in the top operating mechanism of the hydrant so that the valve stem cannot contact the bottom of the shoe when the hydrant is fully open.
7) Minimum depth of bury shall be four feet. Extension sections shall be furnished where necessary to bring hydrant to the proper elevation. Extensions shall be installed in accordance with manufacturer's recommendations. The centerline of the 21 /2 inch
connections shall be a minimum of 18 inches above finished grade.
8) Hydrants shall be a nonfreezing design and provided with a simple, positive, and automatic drain, which shall be fully closed whenever the main valve is opened.
9) Hose and pumper connections shall be breech-locked, pinned, or threaded and pinned to seal them into the hydrant barrel. Each hydrant shall have two two and one-half inch hose connections and one four and one-half inch pumper connection, all with National Standard threads and each equipped with cap and nonkinking chain.
10) All outside surfaces of the barrel above grade shall be painted silver or red with enamel equal to Koppers Glamortex 501.
11) Fire hydrants shall be Mueller or M & H or approved equal.
6.3.14 Retainer glands.
1) Retainer glands shall be ductile iron and shall be manufactured in the United States.
All retainer glands on the Project shall be the product of a single manufacturer.
2) Retainer glands shall be provided at all mechanical joints, including fittings, valves, hydrants, and other locations as shown on the standard details or as directed by the department.
3) Retainer glands shall be one of the following types: Set Screw Type - Set screw type retainer glands shall be ACIPCO, EBAA Iron, Union Foundry, or Tyler. Compact/ lightweight retainer glands shall not be allowed. The minimum working pressure and minimum weight, excluding set screws and gasket material, shall be as follows:
Retainer Gland Specifications Retainer Gland Size (Inches) Minimum Working Pressure (PSI) Minimum Weight Weight (Pounds) 4 350 6.0 6 350 11.8 8 250 16.0 12 250 24.8 16 200 50.0 20 200 72.5 24 150 85.0 Wedge Type: Wedge type retainer glands shall be MEGALUG, Series 1100 as manufactured by EBAA Iron, Inc.
6.3.15 Locator wire. Locator wire shall be Number 14 AWG solid THHN plastic coated copper wire and shall be used on all approved installations of C900 PVC pipe.
6.3.16 Casing pipe.
1) The steel casing pipe shall be manufactured from steel conforming to ASTM A 139, Grade B and be new and unused. Minimum size and thickness shall be as follows:
Casing Pipe Under Highways Pipe Diameter (inches) Casing Diameter (inches) Wall Thickness (inches) 6 12 0.250 8 16 0.250 10 16 0.250 12 18 0.250 14 22 0.375 16 24 0.375 18 30 0.375 20 30 0.375 24 36 0.375 30 42 0.375 Casing Pipe under Railroads Pipe Diameter (inches) Casing Diameter (inches) Wall Thickness (inches) 6 14 0.250 8 18 0.250 10 20 0.281 12 22 0.375 14 24 0.375 16 30 0.406 18 30 0.406 20 32 0.469 24 32 0.469 30 42 0.500
2) The materials for casings under state highways shall be in accordance with the Georgia Department of Transportation Standard Specifications for the Construction of Roads and Bridges, latest edition. It shall be the contractor's responsibility to determine the exact requirements of the Georgia Department of Transportation. If there is a conflict between these regulations and the Georgia Department of Transportation Specifications, the latter shall take precedent.
6.3.17 Bedding materials. Embedment materials shall be angular graded crushed stone, 1
/4-inch to 3 /4-inch in size with no more than five percent passing a No. 8 standard sieve in accordance with Class 1 materials as defined in ASTM D2321 Section 5.1.1.
6.3.18 Concrete thrust block. Concrete shall have a compressive strength of not less than 3,000 psi. Ready-mixed concrete from approved local concrete plant shall be mixed and transported in accordance with ASTM C 94. Reinforcing steel shall conform to the requirements of ASTM A 615, Grade 60.
6.3.19 Meter boxes.
1) Meter boxes shall be constructed of cast iron or plastic.
2) Meter box covers shall be cast iron.
3) If plastic boxes are provided, they shall be high-density polyethylenes.
4) Boxes shall be sized according to the size meter they are to house (see standard detail).
5) Meter boxes and covers shall be manufactured in the USA only.
6.3.20 Materials for structures.
1) Provide materials for construction of manholes and other structures in accordance with the following:
(a) Precast concrete sections shall meet the requirements of ASTM C 478. The minimum compressive strength of the concrete in precast sections shall be 4,000 psi. The minimum shell thickness shall be one twelfth of the inside diameter of the riser or the largest cone diameter.
(b) Precast manhole cones shall be the eccentric type.
(c) Seal joints between precast sections by means of rubber O-ring gaskets or flexible butyl rubber sealant. Butyl rubber sealants shall meet the requirements of AASHTO M-198. Sealant shall be preformed type with a minimum nominal diameter of one inch. Butyl rubber sealant shall be equal to Kent Seal No. 2 or Concrete Sealants CS 202.
(d) Brick shall be whole and hardburned, conforming to ASTM C 32 Grade MS.
Mortar shall be made of one part Portland cement and two parts clean sharp sand. Cement shall be Type 1 and shall conform to ASTM 150. Sand shall meet
ASTM C 53.
(e) Cast iron manhole frames and covers shall meet the requirements of ASTM A 48 for Class 30 gray iron and all applicable local standards. All castings shall be tough, close grained, smooth and free from blow holes, blisters, shrinkage, strains, cracks, cold short and other imperfections. No casting will be accepted which weighs less than 95 percent of the design weight. Shop standard details must indicate the design weight and provide sufficient dimensions to permit checking. All castings shall be thoroughly cleaned in the shop.
Specifications for Manhole Frames and Covers Design Manufacturer's Type Weight Reference Traffic Catalog No. 362 or Vulcan Cat. No. V-1480-1 355 pounds U.S. Foundry
2) All frames and covers shall have machined horizontal bearing surfaces.
3) Watertight type traffic frames and covers shall have the same weight and dimensions as those specified in these regulations.
4) All manhole covers shall have the word "WATER" cast in the top.
5) Manhole steps of polypropylene molded around a steel rod equal to products of M.A.
Industries shall be used.
6) Preformed rubber boots and fasteners equal to those manufactured by Kor-N-Seal or Press Seal Gasket Corporation shall be provided in the pipe openings in precast manhole sections.
7) All grout shall be nonmetallic, nonshrink type. Cement shall be Type III. Grout shall meet the following requirements:
Grout Requirements Criteria Test Method Result Workability ASTM C-191 initial set time not less than 60 minutes Compressive Strength (restrained condition) ASTM C-109 1 day - 3,000 psi Shrinkage ASTM C-827 and CRD 588 No shrinkage after placement or shrinkage after set NOTE: The contractor shall furnish independent laboratory test results as evidence of full compliance with these requirements. Grout shall be mixed and placed in accordance with the recommendations of ACI, and the grout manufacturer's published recommendations.
6.4 Execution.
6.4.1 Pipeline installation.
1) Proper and suitable tools and appliances for safe and convenient handling and laying of pipe and fittings shall be used. Great care shall be taken to prevent the pipe coating from being damaged particularly cement linings on the inside of the pipes and fittings.
Any damage shall be remedied as directed.
2) All pipe and fittings shall be carefully examined by the contractor for defects just before laying and no pipe or fitting shall be laid which is defective. If any defective pipe or fitting is discovered after having been laid, it shall be removed and replaced in a satisfactory manner with a sound pipe or fitting by the contractor at his own expense.
3) No pipe shall be laid in water. The contractor will be required to operate pumps, if necessary, to remove water (whether from ground or surface sources) from the trench while pipe is being laid and joints are being made. When work is not in progress the ends of the pipe shall be closed to prevent water or other foreign material from entering the pipe. Valves installed on existing mains shall be kept closed until after the line is tested, disinfected, and accepted for service.
4) Pipe laid in trenches shall be laid true to line and grade on a firm and even bearing for its full length at depths and grades as indicated. Adequate precautions shall be taken to prevent floatation of pipelines prior to backfilling. Installation of ductile iron pipe in underground pressure piping systems shall conform to the requirements of AWWA C600. Excavation of trenches and backfilling around pipes shall conform to the requirements of the section entitled "Excavation, Trenching and Backfilling" of these regulations.
5) All water mains shall have a minimum of 48 inches of cover above the top of the pipe or 48 inches below edge of pavement, whichever is greater.
6) Water mains shall maintain a minimum of ten feet edge-to-edge horizontal separation from sewer lines, whether gravity or pressure. If the main cannot be installed in the prescribed easement or right-of-way and provide the ten feet separation, the separation may be reduced provided the bottom of the water main has a minimum vertical separation of 18 inches above the top of the sewer. Should neither of these two separation criteria be possible, the water main shall be installed below the sewer with a minimum vertical separation of 18 inches. Where waterline cross under gravity sewer lines, encase sewer line fully in concrete for a distance of at least ten feet on each side of the crossing. Lay water line which cross sewer force mains and inverted siphons at least two feet above these sewer lines; when joints in the sewer line are closer than three feet horizontally from the water line, encase these joints in concrete. Do not lay waterline in the same trench with gas lines, fuel lines or electric wiring. No water main shall pass through or come in contact with any part of a sanitary sewer manhole.
7) All elbows, tees, branches, crosses, and reducers in pressure piping systems shall be adequately restrained against thrust. Underground pressure piping containing unharnessed push-on or mechanical joints or expansion joints shall be restrained by thrust blocks. The contractor may use forms or earth walls to mold the thrust blocks.
When earth walls are used, they shall be cut true to shape and all excess earth removed. The work shall be conducted so that no loose earth will become mixed with the concrete. At the end of 24 hours, damp earth may be placed over the concrete to retain moisture.
8) All lumps, blisters, excess coating, dirt and other objectionable substances shall be removed from the bells and spigots. Bells and spigots shall be wiped clean and dry.
Bells shall be centered in the trench and spigots driven home.
9) The contractor shall keep a transit and appurtenances on the job to be used for laying out the angles required for making bends and other works of this nature.
10) Add casing to all roads with transversing waterlines.
11) Bends, valves and other points where deemed necessary shall be blocked and harnessed to resist thrust. This shall be accomplished by methods and means approved by the department. All forms used to form concrete for blocking shall be removed before backfilling. All fire hydrants shall be harnessed as directed by the department and concrete blocking will be required to resist the thrust on fire hydrants. All stress points and ends of mains shall be inspected before backfilling.
12) Blow-off valves shall be installed at terminus of all dead end mains. Method of installation shall be approved by the department. Refer to standard details for two-inch blow-off details.
13) Whenever pipe requires cutting to fit the lines or install fittings, the work shall be done in such manner as to leave a smooth end at right angles to the axis of the pipe. Special care shall be exercised to guard against breaking or splitting the existing piping.
14) All cutting of ductile iron pipe shall be done with a cutting saw. All burrs shall be removed from the inside and outside edges of all cut pipe.
15) Mechanical joints and restrained joints shall be made in strict accordance with the pipe manufacturer's instructions. The gaskets and follower rings shall be kept clean and carefully centered in the bell with the bolts and boltholes always parallel with the centerline of the pipe. The coating and lining of the pipe shall not be damaged. The nuts on all bolts shall be started and tightened evenly around the entire circumference of the pipe. No one nut shall be tightened more than 1
/2 turn tighter than the remainder of the nuts of the joint. When the joint is complete, the follower ring shall be equal distance from (parallel with) the face of the bell. Bolts shall not be over-stressed and shall be tightened just enough to compress the gasket sufficient to prevent leakage.
Just prior to assembly, the gasket shall be cleaned of all foreign material and shall be brushed with soapy water just before slipping the gasket over the spigot and into the bell of the pipes. The joint shall be in straight alignment during assembly. Any deflection required shall be made after assembly but before tightening bolts. Bolts shall be tightened with torque wrenches with the following torque loads applied:
Range of Torque Bolt Size (inches) Foot Pounds 5 /8 45—60 3 /4 75—90 1 100—120 11 /4 120—150
16) Push-on type joints shall be made in strict accordance with the pipe manufacturer's instructions. All joints shall be completely "belled-up" and all spigots shall be "home".
The gasket seat in the socket, the gasket and the plain end of the pipe to be entered shall be wiped clean before assembly. After the gasket has been inserted into the gasket recess, a thin film of lubricant shall be applied to the inside surface of the gasket and to the outside surface of the spigot end of the pipe to be jointed. After lubricating, the end of the pipe shall not be allowed to touch the bottom or side of the trench causing dirt to adhere to the joint surface. When pipe is cut in the field, the cut end of the pipe shall be beveled with a file or grinder. The joint shall be in straight alignment while pushing the pipe to make assembly. Any deflection required shall be made after the joint is assembled.
17) Set screw type retainer glands shall be installed in strict accordance with the fitting manufacturer's instructions. After making up the mechanical joint as previously specified, the set screws shall be run down until they are in firm contact with the pipe.
The set screws shall then be tightened once completely around the joint to approximately 40 foot-pounds torque. Finally, the set screws shall be tightened twice completely around the joint to the following torques, unless a "break-away" torque is used:
Three inches through 12 inches glands - 80 foot - pounds 14 inches through 24 inches glands - 65 foot - pounds
18) Wedge type retainer glands shall be installed in strict accordance with the manufacturer's instructions. Impact wrenches shall be prohibited for used with "break-away" nuts for final tightening.
19) Retainer gland joints shall be made in straight alignment and any deflection required shall be made before tightening the joint bolts or set screws.
20) Deflection of any pipe at joints for long radius curves or for avoiding obstacles shall be permitted only upon approval of the department.
21) Where deflection of joints is permitted, such deflection shall be made in accordance with manufacturer's recommendations.
6.4.2 Connections to water mains.
1) Connections shall be made to existing pipe lines in accordance with instructions from the water, sewer and environmental services department.
2) Before laying pipe, locate the points of connection to existing water mains and uncover as necessary for the department to confirm the nature of the connection to be made.
3) Interruption of services - Make connections to existing water mains only when system operations permit. Operate existing valves only with the specific authorization and direct supervision of the department.
4) Tapping sleeves:
(a) Prior to attaching the sleeve, the pipe shall be thoroughly cleaned, utilizing a brush and rag, as required.
(b) Before performing field machine cut, the water tightness of the sleeve assembly shall be pressure tested. The interior of the assembly shall be filled with water.
An air compressor shall be attached, which will induce a test pressure as specified in this article. No leakage shall be permitted for a period of five minutes.
(c) After attaching the sleeve to an existing main, but prior to making the tap, the interior of the assembly shall be disinfected. All surfaces to be exposed to potable water shall be swabbed or sprayed with a one-percent hypochlorite solution.
5) Connecting to existing side street mains:
(a) Before taking existing side street mains out of service, taps for air removal shall be made at each high point along the section of existing main to be temporarily taken out of service. With the department's approval at each location, existing service lines may be used to expel air.
(b) Close service line curb stops along the section or sections that will be dewatered and close all connecting main valves.
(c) Take existing main out of service, cut and complete connection as detailed on the standard details.
(d) Open appropriate valve and after expelling all air, return existing main to service and re-open all service line curb stops.
(e) At all taps to remove air, install brass cap on corporation stop, backfill, and replace pavement where required.
6.4.3 Hydrant installation.
1) Prior to installation, inspect all hydrants for direction of opening, nozzle threading, operating nut and cap nut dimensions, tightness of pressure-containing bolting, cleanliness of inlet elbow, handling damage and cracks. Defective hydrants shall be corrected or held for inspection by the department.
2) All hydrants shall stand plumb and shall have their nozzles parallel with or at right angles to the roadway, with pumper nozzle facing the roadway, except that hydrants having two-hose nozzles 90 degrees apart shall be set with each nozzle facing the roadway at an angle of 45 degrees.
3) Hydrants shall be set to the established grade, with the centerline of the lowest nozzle at least 18 inches above the ground or as directed by the department.
4) Each hydrant shall be connected to the main with a hydrant tee or a six-inch branch.
5) Hydrants shall be located as shown on the standard details or as directed by the department.
6) Fire hydrants shall be installed at property line not to exceed five-feet maximum distance from water main, unless approved by the department.
7) Hydrants shall be placed on ground in accordance with the standard details.
6.4.4 Valve and fitting installation.
1) Prior to installation, valves shall be inspected for direction of opening, number of turns to open, freedom of operation, tightness of pressure-containing bolting and test plugs, cleanliness of valve ports and especially seating surfaces, handling damage and cracks.
Defective valves shall be corrected or held for inspection by the department. Valves shall be closed before being installed.
2) Valves, fittings, plugs and caps shall be set and joined to the pipe except that 12 inch and larger valves shall be provided with special support, such as treated timbers, crushed stone, concrete pads or a sufficiently tamped trench bottom so that the pipe will not be required to support the weight of the valve. Valves shall be installed in the closed position.
3) A valve box shall be provided on each underground valve. They shall be carefully set, centered exactly over the operating nut and truly plumbed. The valve box shall not transmit shock or stress to the valve. The bottom flange of the lower belled portion of the box shall be placed below the valve operating nut. This flange shall be set on brick, so arranged that the weight of the valve box and superimposed loads will bear on the base and not on the valve or pipe. Extension stems shall be installed where depth of bury places the operating nut in excess of 30 inches beneath finished grade so as to set the top of the operating nut 30 inches below finished grade. The valve box cover shall be flush with the surface of the finished area or such other level as directed by the department.
4) If valve boxes are installed concurrently with valves, the contractor shall be responsible for maintaining valve boxes until the warranty period expires. All lost or damaged valve boxes shall be replaced by the contractor, at the contractor's own expense.
5) A concrete pad shall be required around each valve box, the top flush with the cover as detailed on the standard details. Precast valve pads will only be allowed where approved by the department. Precast pads shall not be used on slopes or in ditches.
6) In no case shall valves be used to bring misaligned pipe into alignment during installation. Pipe shall be supported in such a manner as to prevent stress on the valve.
7) Where main valves are shown on the standard details adjacent to fire hydrant tees or intersection tees, install the valves no more than four feet from the tee unless shown or specified otherwise.
8) Nonrestrained and push-on joints shall not be installed within 15 feet of restrained joints at valves or fittings, unless shown otherwise on the standard details or approved by the department.
6.4.5 Jack and bore.
1) The contractor shall provide to the department, for approval, a detailed plan for the methods proposed for the construction of the casing. These plans shall include the methods proposed for groundwater control and face protection.
2) In general, jack and bore operations shall conform to the requirements of the Georgia Department of Transportation as presented in their Standard Specifications for the Construction of Roads and Bridges, latest edition. If a conflict between these regulations and the Georgia Department of Transportation Specifications exists, the more stringent specifications shall govern.
3) Install the steel casing pipe by the dry boring method. Bore the hole and install the casing through the soil simultaneously by a cutting head on a continuous auger mounted inside the casing pipe. Fully weld lengths of casing pipe to the preceding section in accordance with AWS recommended procedures. After the boring and installation of the casing is complete, install a cleaning plug on the rig and clean the casing.
4) After construction of the casing is complete, and has been accepted, install the pipeline in accordance with the detailed standard details and/or these regulations.
5) Check the alignment and grade of the casing and prepare plan for approval to set the carrier pipe at proper alignment, grade and elevation. The carrier pipe shall be supported by stainless steel casing spacers to preclude movement within the casing.
One spacer shall be placed not more than two feet from each end of the casing.
Subsequent spacers shall be placed at six feet - ten feet intervals within the casing.
6) Provide all necessary bracing, bulkheads, and shields to ensure complete safety to all traffic at all times during the work. Perform the work in such a manner as to not permanently damage the roadbed or interfere with normal traffic over it.
7) Begin the boring operation in a pit, sheeted and shored as necessary and begin at and proceed from one end. Observe all applicable requirements of Georgia DOT regulations.
8) Conduct the operations in such a manner that all work will be performed below the level of the roadbed. Coordinate and schedule all of the work with Georgia DOT.
9) Complete all boring work at one particular location before boring work is started at another location.
10) If the casing installation work is being conducted in an unsafe manner or in a manner detrimental to the overpassing roadway or to the safety of the traveling public, all operations of boring shall cease until the necessary corrections have been made. In the event that distress occurs to the roadway due to the boring, the contractor shall be required to submit a plan to repair the roadway. The plan must be acceptable to the Georgia Department of Transportation and the Paulding County Water, Sewer and Environmental Services Department.
6.4.6 Free boring.
1) The contractor may construct a driveway crossing by the free bore method, in lieu of making a pavement cut, where indicated on the standard details and approved by the department. The free bore method shall be accomplished by the dry auger boring method without jetting, sluicing, or wet boring.
2) The diameter of the free bore shall not exceed the pipe bell outside diameter or the pipe barrel outside diameter plus one inch, whichever is greater.
3) Free boring is allowable only under residential driveways. Free boring is not allowed under commercial driveways or any roadway.
4) The contractor shall be responsible for any settlement of the driveway caused by the free bore construction activities.
5) If the contractor elects to free bore and an acceptable installation does not result for any reason, the contractor shall install a casing pipe by the bore and jack method.
6.4.7 Double check backflow preventers.
1) A double check backflow preventer shall be provided immediately downstream from the customer's water meter. The backflow preventer shall be housed in the same meter box or vault as per the detail.
2) One and one-half inch and smaller backflow preventers require a minimum of six inches below, eight inches behind, eight inches in front of, and three inches above the highest point on the device or its valves.
3) Two-inch and larger backflow preventers require a minimum of 12 inches below, 12 inches behind, 24 inches in front of and three inches above the highest point on the device or its shut off valves.
4) A minimum of six inches between the pit walls and the large device's valves and three inches between the pit walls and the valves on the small devices is required.
5) The dimensions given above assume a standard "shallow" installation. If the depth exceeds 12 inches to the top of the device the other dimensions will need to be increased accordingly and be approved by the department.
6.4.8 Double detector check valve assemblies.
1) A double detector check valve assembly shall be installed in all fire mains and fire sprinkler service lines as close to the system main as is possible. The backflow prevention assembly shall be housed in an approximately sized vault.
2) Typically, a minimum of 12 inches below, 12 inches behind, 24 inches in front of and three inches above the highest point on the device or its shut off valves is required.
3) A minimum of six inches shall be provided between the pit walls and the outside edge of the devices' shut off valves.
4) The dimensions given above assume a standard "shallow" installation. If the depth exceeds 12-inches to the top of the device the other dimensions will need to be increased accordingly and be approved by the department.
6.4.9 Water meters and service lines.
1) A water service connection shall consist of a corporation tapped into the main, a service line to a curb stop inside a meter box, a meter backflow preventer and meter set fittings.
2) All service lines crossing under existing pavement shall be installed by boring. All service line taps shall be made with system pressure on the main and any visible leaks shall be repaired. After each meter service has been completed, the entire assembly shall be flushed to remove any foreign matter. All service lines shall have a minimum bury depth of 48 inches under ditches and shoulders, and 48 inches under the roadway.
6.4.10 Locator wire.
1) A continuous or properly spliced Number 14 AWG THHN solid plastic coated copper wire shall be placed along all approved C900 PVC pipe installations.
2) Care shall be taken during backfilling to prevent damaging or cutting of the locator wire.
3) All splices shall be made by using copper wire "U" bolt assemblies and then wrapping with electrical tape.
4) Wire shall be wrapped around pipe such that at least four "wraps" are produced per length of pipe.
5) In lieu of "wrapping", the tracer wire may be strung along the top of pipe provided it is taped to the pipe every five feet to ensure proper positioning during backfilling.
6) Locator wire shall be brought up to ground surface to all valve boxes and fire hydrants.
6.4.11 Valve markers.
1) Markers shall be installed with the top of the marker protruding 36 inches above the ground surface. Valve markers shall be located in a suitable location approved by the department's inspector during construction.
2) A marker shall be located within 20 feet or less from all in-line valves and/or taping valves. One marker may be used to reference the location of more than one valve provided the valves are within 20 feet of the marker. No marker is to be installed within three feet of direct line of operation of a fire hydrant. Valve marker shall be installed in ditch line being in direct line with water main.
3) The brass disc shall be stamped with the distance between the valve(s) and marker.
The marker shall be installed such that the disc faces the valve.
6.4.12 Field pressure testing.
1) After the pipe has been installed, the complete pipeline shall be subjected to a hydrostatic pressure test.
2) Except as hereinafter allowed, the line shall be tested in sections not to exceed the distance from one line valve to the next adjacent line valve. Testing two sections through an open intermediate valve will not be allowed unless adjacent line valves are less than 300 feet apart. In no case will leakage from two or more adjacent sections be "averaged" to determine that the total section meets the leakage test. Each section of line or valved section of the line shall be tested as follows:
(a) At all high points, where air release valves or fire hydrants have not been installed, the contractor shall install corporation cocks to expel the air as the pipe is being slowly filled with water. After the pressure and disinfecting tests have been completed, the corporation cocks shall be capped with brass caps and left in place. The location of said corporation cocks shall be marked on record standard details with dimensions measured from three permanent structures.
(b) A test pump shall be installed at the low point of the section being tested and the pipe shall be slowly filled with water.
(c) After expelling all air at the high point, the corporation cocks shall be closed and the pressure increased to the required pressure at the test pump location. The test pressure shall be maintained within five psi for the duration of the test.
(d) The volume of water required by the test pump to maintain this excess pressure, which will represent the leakage, shall not exceed 0.14 gallons per hour per inch diameter per 1,000 feet of pipe.
(e) Excess pressure and leakage test shall be successfully conducted for not less than two consecutive hours. Provide an accurate pressure gage with graduation not greater than five psi.
(f) The contractor shall, at his own expense, locate and make repairs as necessary until the leakage is within the specified allowance.
(g) All visible leaks shall be repaired regardless of the amount of leakage.
3) The contractor shall furnish all labor, equipment, and material necessary to conduct tests, and shall furnish and install all temporary plugs and valves necessary to isolate the test sections. Water for test purposes will be furnished by the department.
6.4.13 Disinfecting pipelines.
1) After successfully pressure testing each pipeline section, disinfect in accordance with AWWA C 651 for the continuous-feed method and these regulations.
2) Chlorination:
(a) Apply chlorine solution into the new water main. Retain chlorinated water for 24 hours minimum.
(b) After 24 hours, the contractor shall obtain samples at every outlet. Samples of water shall contain at least 25 milligrams per liter free chlorine. Re-chlorinated if required results are not obtained on all samples.
3) Disposal of chlorinated water. Reduce chlorine residual of disinfection water to less than one milligram per liter if discharged directly to a body of water, or to less than two milligrams per liter if discharged onto the ground prior to disposal. Treat water with sulfur dioxide or other reducing chemicals to neutralize chlorine residual. Flush all lines until residual is equal to existing system.
4) Bacteriological testing. After final flushing and before the main is placed into service, the contractor shall collect samples from the line to have tested for bacteriological quality. Testing shall be performed by the contractor at a laboratory certified by the State of Georgia. Re-chlorinate lines until the required results are obtained. Contractor shall open all valves being a part of the system being tested upon approval of bacteriological testing.
6.4.14 Guarantee against taste, odor or color. The contractor shall guarantee for a period of one year against taste, odor or color caused by pipe lining materials. The contractor shall at his own expense provide all necessary treatment to counteract any such taste, odor, or color.
Bonafide complaints of taste, odor, or color in the area served by the new mains shall be deemed caused by pipe lining materials.
6.5 Site preparation, restoration and related work.
6.5.1 Scope of work.
1) This section covers all work required to prepare the site for pipeline construction as well as site restoration. Also, included in this section is miscellaneous work required to complete the overall project.
2) This work includes but is not limited to pavement and sidewalk removal and replacement, erosion and sedimentation control, curb and gutter removal and replacement, grassing and refuse removal.
6.5.2 Project photographs.
1) The contractor shall provide project photographs. Before beginning the work photographs shall be taken of all areas to be disturbed by the contractor's operation. Said photographs shall be submitted to the department for approval prior to the commencement of any work.
2) The contractor shall video the project prior to construction, during construction and at completion said video will be furnished to the department.
6.5.3 Materials.
1) Materials to be incorporated into the work shall be new and unused, and shall conform to all applicable requirements of these specifications. Any materials installed prior to approval by the department will be subject to rejection, and will be removed at the contractor's expense.
2) Asphaltic materials - Asphaltic coverage and related bituminous materials for roadway construction shall conform to the requirements of Georgia Department of Transportation Standard Specifications for the Construction of Roads and Bridges, latest Edition.
(a) Asphaltic concrete shall be Type F. Type E will not be accepted.
(b) Concrete and reinforcement for concrete pavement shall conform to the requirements for the Georgia Department of Transportation Standard Specifications.
3) Grassing and Erosion Control Materials - Grassing and erosion control materials shall conform to the requirements outlined by the Georgia Department of Transportation Standard Specifications, latest edition and the Manual for Erosion and Sediment Control in Georgia.
4) Rip rap - stone rip rap shall be sound, tough, durable stones resistant to the action of air and water. Slabby or shaley pieces will not be acceptable. Specific gravity shall be
2.0 or higher. Rip rap shall have less than 66 percent wear and tested in accordance with AASHTO T-96. Unless shown or specified otherwise, stone rip rap shall be type 1 rip rap.
(a) Type 1 rip rap: the largest pieces shall have a maximum volume of one cubic feet.
At least 35 percent of the mass shall be comprised of pieces that weigh 100 pounds or more. The remainder shall be well graded down to the finest sizes. Rock fines shall comprise a maximum of 10 percent of the total mass. Rock fines are defined as material passing a No. 4 sieve. Rip rap size shall conform to georgia department of transportation section 805.01 stone dumped rip rap, type 1.
6.5.4 Clearing and grubbing.
1) The location of the work shall be cleared of all trees, growth, debris, stumps and other objectionable matter before trenching. Special care shall be taken not to damage any adjacent or nearby shrubbery, trees, grass, fences, walks, utility lines, drainage structure, paving or other property. The contractor shall be responsible for such damage and shall replace all such property damaged with equally new property, all to the satisfaction of the property owner.
2) Removal of trees and permanent structures along or in the trench space shall be done by the contractor, but only as directed. All construction activity shall be confined to the limits of the easement, right-of-way or public right-of-way unless the contractor obtains legal rights to use adjacent property from the private owners concerned.
3) The contractor shall clear all permanent Paulding County Water System right-of-way and remove obstructions along the pipeline for a sufficient area to provide adequate and safe work space. All debris shall be removed and disposed of by the contractor.
Where the tree limbs interfere with utility wires, or where the trees to be felled are in close proximity to utility wires, the tree shall be taken down in sections to eliminate the possibility of damage to the utility.
4) All fences adjoining any excavation or embankment that may be damaged or buried shall be carefully removed, stored, and replaced.
5) All stumps, roots, foundations and planking embedded in the ground shall be removed.
Piling and butts of utility poles shall be removed to a minimum depth of two feet below the limits of excavation.
6) Do not cut trees for the performance of the work except as allowed above and as absolutely necessary. Protect trees that remain in the vicinity of the work from damage from equipment. Do not store spoil from excavation against the trunks.
6.5.5 Temporary erosion and sedimentation.
1) Temporary erosion and sedimentation controls shall meet the requirements of the Georgia Erosion and Sedimentation Act of 1975 (as amended) and local soil erosion and sedimentation control ordinances.
2) The contractor shall acquire land disturbance permits from the community development department or other appropriate governing authority, and shall pay any fees for said permits. The contractor shall be responsible for submitting to the county sufficient documents such that the county can acquire approval from the soil and water conservation district. All fines imposed for improper erosion and sedimentation control shall be paid by the contractor.
3) Description and working drawings shall indicate controls which will ensure that drainage from job site areas which will be denuded, stripped or modified of its natural existing or artificially established stabilization or protection against erosion shall pass through some type of filter system before being discharged. These areas shall be kept sufficiently moist to control dust.
4) Silt dams, traps, barriers, and appurtenances shall be installed, and shall be maintained in-place until no longer needed, and then removed. Hay bales that deteriorate, and filter stone which becomes dislodged shall be replaced with new materials. Detention ponds, if constructed, shall be maintained in a condition that will ensure that unfiltered water will not leave the pond.
5) Materials used in temporary erosion and sedimentation control shall meet the following requirements:
(a) Silt fence shall meet the requirements of Section 171 - Temporary Silt Fence of the Department of Transportation, State of Georgia, Standard Specification, latest edition. Silt fence fabric must be on the Georgia Department of Transportation Qualified Product List.
(b) Hay bales shall be clean, seedfree cereal hay type.
(c) Netting shall be one-half-inch, galvanized steel, chicken wire mesh.
(d) Filter stone shall be crushed stone conforming to Georgia Department of Transportation Table 800.01H, Size Number 3.
6.5.6 Construction along state highways, county roads and city streets.
1) All storage of materials, excavation, backfilling, pavement removal and replacement, clean up and grassing shall be in strict accordance with the applicable state and county regulations. It shall be the contractor's responsibility to determine the exact requirements of the authority having jurisdictions over the right-of-way. No highway, road or street shall be closed to traffic without authorization from the proper authority. The contractor shall provide suitable lights, signs, barricades, and flagmen to insure the safety of pedestrian and vehicle traffic and workmen and to protect the work.
2) The contractor shall coordinate the closing of any street at least ten days in advance with the county department of transportation at 770-445-4759.
3) The contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights and other traffic control devices; shall provide qualified flagmen where necessary to direct traffic; shall take all necessary precautions for the protection of the work and the safety of the public.
4) Construction traffic control devices and their installation shall be in accordance with the current Georgia Manual of Uniform Traffic Control Devices for Streets and Highways.
5) Placement and removal of construction traffic control devices shall be coordinated with the Paulding County Department of Transportation and/or the water, sewer and environmental services department a minimum of 48 hours in advance.
6) Placement of construction traffic control devices shall be scheduled ahead of associated construction activities. Construction time in street right-of-way shall be conducted to minimize the length of time traffic is disrupted.
7) Construction traffic control devices shall be removed immediately following their useful purpose. Traffic control devices used intermittently, such as "flagmen ahead", shall be removed and replaced when needed.
8) When working within county or state highway rights-of-way, provide trained and certified flag people who have completed a training program approved by the Georgia Department of Transportation.
9) Existing permanent traffic control devices within the construction work zone shall be protected from damage due to construction operations. All damaged traffic control devices requiring temporary relocation due to construction shall be located as near as possible to their original position. Their original position shall be measured from permanent reference points and recorded in a permanent log prior to relocation.
Temporary locations shall provide the same visibility to affected traffic as the original position. Relocated permanent traffic control devices shall be reinstalled in their original positions as soon as practical following construction in the affected location.
Construction traffic control devices shall be maintained in good repair, clean and visible to affected traffic for daytime and nighttime operation. Traffic control devices affected by the construction work zone shall be inspected daily.
10) Construction warning signs shall be black legend on an orange background. Regulatory signs shall be black legend on a white background. Construction sign panels shall meet the minimum reflective requirements of the Paulding County Department of Transportation. Sign panels shall be of durable materials capable of maintaining their color, reflective character and legibility during the period of construction.
6.5.7 Removing and replacing pavement.
1) Remove existing pavement as necessary for installing the pipeline and appurtenances.
(a) The contractor shall replace with like materials at his expense all pavements, walks, and driveways removed or damaged in connection with the work. Pavement repairs shall be smooth and unnoticeable and of the same elevation as the existing paving. In the removal of pavement, the contractor shall salvage all sound and undamaged materials and store them at a convenient location for reuse in pavement replacements. Any additional new rock concrete, asphalt or other replacement materials shall in all cases conform to the county's specifications.
(b) Before removing any pavement, mark the pavement neatly paralleling pipelines and existing street lines. Space the marks the width of the trench.
(c) Saw cut asphalt pavement along the marks using a rotary saw or other suitable tool. Break concrete pavement along the marks by scoring with a rotary saw and breaking below the score by the use of jackhammers or other suitable tools.
(d) Do not pull pavement with machines until completely broken and separated from pavement to remain.
(e) Do not disturb or damage the adjacent pavement. If the adjacent pavement is disturbed or damaged, remove and replace the damaged pavement. No additional payment will be made for removing and replacing damaged adjacent pavement.
(f) Remove and replace sidewalks disturbed by construction for their full width and to the nearest undisturbed joint.
(g) Remove and replace or tunnel under any curb disturbed by construction to the nearest undisturbed joint.
2) Upon completion of backfilling and consolidation of the backfill, arrange to have the compaction tested by an independent testing laboratory approved by the department.
After compaction testing has been satisfactorily completed, replace all pavements, sidewalks and curbs removed. Gravel roads and drives shall meet the requirements for graded aggregate sub-base.
(a) Pavement restoration shall meet the requirements of the regulatory agency responsible for the pavement. Obtain agency approval of pavement restorations before requesting final payment.
(b) Obtain the department's approval of restoration of pavement not the responsibility of a regulatory agency such as private roads and drives.
(c) Complete pavement restoration as soon as possible after backfilling.
(d) Prior to replacing pavement, make a final cut in the pavement 12 inches back from the edge of the previous cut line. Make the cut using a rotary saw. Remove pavement and base material to a depth of ten inches below finished grade.
Construct an eight-inch thick concrete (3,000 psi) bridge the full width of the pavement cut (ie... trench width plus 24 inches). Apply tack coat and two inches of type F asphalt when concrete has cured.
(e) Replace all street roadway pavement, driveways, sidewalks, and curbs with the same material and to the same dimensions as existing.
(f) Should any pavement restoration or repairs fail or settle during the life of the contract, including the bonded period, promptly restore or repair defects.
3) Concrete pavement removal and replacement shall conform to the applicable sections of the Georgia Department of Transportation Standard Specifications for the Construction of Roads and Bridges, latest edition.
6.5.8 Railroad crossings. Railroad crossings shall be made in accordance with all requirements of the affected railroad. It will be the contractor's responsibility to obtain all requirements from the railroads and furnish all labor and materials required to fulfill such requirements. The contractor shall furnish and install the casing under the tracks with whatever material and with whatever methods and under whatever regulations are required by the railroads.
6.5.9 Stream and ditch crossing.
1) At all points where banks of streams or drainage ditches are disturbed by excavation or where natural vegetation is removed, carefully compact backfill and place rip rap to prevent subsequent settlement and erosion.
2) Place rip rap a distance of not less than ten feet upstream and downstream or ten feet each side of the stream in any disturbed area. Extend rip rap from one foot below stream bed to top of bank. Place to conform with the natural slope of the stream bank.
3) The requirements of this section apply equally to construction along side a stream or drainage ditch as well as crossing a stream or drainage ditch.
4) Embed stone rip rap by hand so as to form a compact layer at least 12 inches thick.
Place rip rap in such a way that the smaller stones are not segregated but evenly distributed. Place stones in the crevices between the larger stones so that a dense, well-graded mass is produced.
6.5.10 Cleaning and maintenance.
1) The contractor shall remove all surplus material, tools, and temporary structures. The site of construction shall be left clean, to the satisfaction of the department.
2) After the work is accepted as a whole, the contractor shall maintain the surface of the unpaved trenches, adjacent curbs, sidewalks, gutters, shoulders, street paving, shrubbery, fences, sod, grass and other disturbed surfaces for a period of 90 days thereafter.
3) Should any trenches in or outside paved areas settle below grade, they shall be promptly built back by the contractor, who shall furnish select backfill material for this purpose.
4) The contractor shall furnish all material and labor required for such maintenance and/or repairs and the work shall be done in a manner satisfactory to the department.
5) The contractor shall be responsible for a period of one year for faulty workmanship and materials.
6.5.11 Grassing.
1) The contractor shall furnish all materials for and properly restore to the satisfaction of the department, all ground surfaces irrespective of the type, which may be disturbed in the progress of the work.
2) This work shall include in general but without limitation, the spreading of topsoil, seeding, fertilizing and mulching required to restore disturbed areas as necessary for the proper completion of the work as may be required, directed or as specified herein.
On all "sod" type lawns and other improved, well-established grass areas, the sod/grass shall be carefully removed, kept alive and replaced after the backfilling is finished. The contractor shall also remove all spoil from such areas as quickly as possible after the excavation is backfilled, and he shall leave the premises in as good of condition as before undertaking the work. It is the intent of these regulations to place seed over all disturbed areas, to place topsoil and seed where established lawn areas existed prior to construction, and to provide for sod removal/replacement.
3) The requirements of the Georgia Department of Transportation "Standard Specifications for the Construction of Roads and Bridges," latest edition, shall apply insofar as they are applicable.
4) When directed, areas to be seeded shall be covered with a layer of topsoil where topsoil has been disturbed by the pipe laying operation. The topsoil shall be of sufficient thickness that when spread and compacted, a minimum of four inches will be available. Furnish natural topsoil of a good condition and tillable structure. Obtain topsoil as borrow from an outside source and from piles of uniform texture, drainage, and other characteristics so as to constitute a homogeneous mixture approved by the department. No existing materials may be re-used in this work unless approved.
Furnish topsoil free from objectionable materials such as hard clods, stiff clay, sods, hardpan, partially disintegrated stone, or other materials that are not integrally a natural component of good agricultural soils and which are harmful to or unnecessary for successful plant growth.
5) Seeding shall be performed using a properly proportioned mixture of inoculated seed as shown on the sediment and erosion plans.
6) Replace existing grassed areas with grass of similar characteristics and appearance meeting as a minimum the requirements of these regulations.
7) The subgrade for the areas to be seeded shall be brought to a uniform grade, free of stones larger than one inch. Where topsoil is required, the topsoil shall be uniformly graded, trimmed and raked free from unsuitable material, ridges, bumps or depressions. Over this area, spread agricultural lime at the rate of 40 pounds per 1,000 square feet, and spread fertilizer uniformly on the surface of the ground at the rate of 1,500 pounds per acre. Mix the lime and fertilizer uniformly into the top four inches of the soil by suitable harrows, rotary tillers or other approved equipment.
8) On all well established and "sod" type lawns, the sod/grass shall be cut into rolls, carefully removed, kept watered and alive and replaced after backfilling has been properly completed.
9) The contractor shall be responsible for maintaining all seeded areas including mowing, watering and reseeding defective areas until a satisfactory stand of grass is accomplished and final acceptance of the work by the department is obtained. Areas showing evidence of settlement or loss of topsoil shall be rebuilt and reseeded as required.
6.5.12 Temporary toilet accommodations. If deemed necessary by the department, temporary toilet facilities shall be set up to meet all county and state regulations.
ARTICLE 7 SANITARY SEWER SYSTEM SPECIFICATIONS
7.1 Preconstruction requirements.
7.1.1 Contractor qualifications. Contractors performing sewer line installations must be licensed in accordance with State of Georgia law and local ordinances and approved by the water, sewer and environmental services department (hereafter referred to in this article as "the department"). They should be completely familiar with the procedures and contract requirements associated with this type of project. Unsatisfactory work will cause a contractor to not be approved for future work.
7.1.2 Soil erosion and sedimentation control plan. Developers, engineers, design professionals and contractors performing work in Paulding County are responsible for following the terms and provisions of article 9 of these regulations on soil erosion and sedimentation control.
7.1.3 Easement acquisition and utility encroachment permits.
1) It shall be the responsibility of the developer to obtain any off-site easements required to connect the project to existing public sanitary sewers. Easements will be conveyed to the department for all facilities that are to be conveyed to the department. This process must be started early enough to allow construction of the sanitary sewer before any building construction is to begin. No building permits, water meter or sanitary sewer tap applications can be issued until off-site water mains and sanitary sewers have been constructed and accepted.
2) All easements shall allow adequate room to construct the sanitary sewer and appurtenances. Permanent easements shall be a minimum of 20 feet wide, ten feet on each side of the line; except, however, that when the depth of the sanitary sewer exceeds ten feet the required sanitary sewer easement width shall increase such that the easement width is at least twice the depth from the ground surface to the bottom of the pipe.
3) Easement drawings shall be prepared for work outside the development prior to approval of the sanitary sewer plans. The drawings shall be of a size suitable for legal recording and shall be prepared by a registered land surveyor. The drawing will show property lines, the name of property owners with length of line encroaching on each property owner, size of line, line designation, manhole number and stations, width of permanent and construction easement, scale of drawing, north arrow, land lot and district numbers, and a tie to the nearest land lot corner. Any streets or other existing easements shall also be shown. Easement agreements referencing these drawings shall be prepared and attached to the drawings, signed by the property owners, and recorded at the Paulding County Clerk of Superior Court's office.
4) The designer shall furnish appropriate drawings for submittal to the owner of any state or federal highways, railroads, power lines, water lines, gas lines, petroleum lines or any other utility lines on which the sanitary sewer construction will encroach.
The drawing shall normally be 81 /2 inches x 11 inches or 81 /2 inches x 14 inches and shall show a plan view and a profile view. The drawing will show the same information required for easement drawings. Also, the drawing will show the right-of-way of the existing street or utility, the owner's designation of the line, the name or number of the nearest intersection or mile post or tower number and the distance to that appurtenance. The clearance distance between the street surface, or the bottom of the rail, or the utility and the sanitary sewer will be shown. The drawing will show the type of material to be used for the sanitary sewer and the method of construction to be used.
The drawing will also contain any other special information required by the owner of the facility on which the sanitary sewer is encroaching. Three copies of the utility encroachment drawing will be furnished with the plans when they are submitted for approval. Construction permits shall not be issued until the utility encroachment permit has been obtained and until any special conditions such as insurance requirements have been complied with.
7.2 Design criteria.
7.2.1 General. The criteria listed herein are not intended to cover all aspects of design, but rather to mention the basic guidelines and those particulars that are required by the Paulding County Department of Water, Sewer and Environmental Services. For more detailed criteria, the reader should refer to standard references such as "Ten States Standards," Georgia EPD Regulations, Water Pollution Control Federation Manual of Practice No. FD-5, and other available literature.
7.2.2 Sanitary sewers separate from storm sewers. Sanitary sewers shall be designed as separate sanitary sewers only in which rainwater from roofs, streets and other areas and groundwater from foundation drains are excluded. Overflows from sanitary sewers to storm sewers are not permitted.
7.2.3 Sizing factors.
1) The sanitary sewer system should be designed for the estimated ultimate tributary population. Tributary population is considered to be all areas upstream of the discharge point of the system being designed. Sewers will be designed and installed to the uppermost property line of the development being served. Consideration should be given to the maximum anticipated capacity of institutions, industrial parks, etc.
2) In determining the required capacities of sanitary sewers, the following factors should be considered: 1) maximum hourly sewage flow; 2) additional maximum sewage or waste flow from industrial plants; 3) ground water infiltration; 4) topography of the area; and 5) depth of excavation.
3) New sanitary sewer systems shall be designed on the basis of an average daily flow of sewage of not less than 400 gallons per household per day. Normally all sanitary sewers shall be designed with a peaking factor of not less than four and this may be increased as required by the department. Peak factors will be higher for smaller basins. Sanitary sewers should be designed to carry the peak flow when flowing at a depth of 2
/3-pipe diameter. When deviation from the foregoing per capita rates are demonstrated, a description of the procedure used for design shall be included.
No sewer main shall be less than eight inches and no service lateral shall be less than six inches.
7.2.4 Depth requirements.
1) Any sewers installed in the street shall be sufficiently deep to provide six feet of cover at the inlet end of all service laterals at the street right-of-way, and over any part of the main or service within the street right-of-way.
2) Any sewers on off-street easements shall have a minimum of four feet of cover. In extraordinary circumstances where there is no other alternative, ductile iron pipe shall be used where there is less than six feet of cover. Filling over the pipe to obtain minimum cover is not allowed, if the fill will impede the natural flow of surface water or will cause an erosion problem.
7.2.5 Slope.
1) All sewers shall be so designed and constructed to give mean velocities, when flowing full, of not less than two feet per second based on Manning's Formula using an "n" value of 0.013. The following are the minimum slopes that should be provided;
however, slopes greater than these are desirable (see following page):
Minimum Slope In Feet Sewer Size (Inches) Per 100 Feet 6 1.00 8 0.40 10 0.29 12 0.22 14 0.17 15 0.15 16 0.14 18 0.12 21 0.10 24 0.08 27 0.07 30 0.06 36 0.05
2) These minimum slopes will be used only when sufficient flows are expected to maintain a velocity of two feet per second and maintain a cleansing action in the line.
Sewers shall be laid with uniform slope between manholes. Sewers on 15 percent slope or greater shall be ductile iron pipe and shall be anchored securely with concrete anchors to prevent displacement by erosion or shock. Maximum slope of sewers shall be 20 percent and sewers shall be designed at less than 15 percent whenever possible.
7.2.6 Increasing size. When a small sewer is connected to a larger one, the connection shall be made by matching the crowns of both sewers to same elevation.
7.2.7 Ductile iron pipe.
1) Ductile iron pipe shall be required for sanitary sewer mains:
(a) Over or under all storm sewers.
(b) Crossing water mains.
(c) Under all stream crossings.
(d) With less than six feet of cover or over 18 feet of cover.
(e) With 15 percent or greater slope.
(f) Inside casings.
(g) At all other locations specified by the department.
7.2.8 Sanitary sewer pipe material requirements. The department reserves the right to disallow any manufacturer that does not have a consistent, long-term record of quality control and successful product performance. Acceptable sanitary sewer pipe materials include Polyvinyl Chloride (PVC), Ductile Iron Pipe (D.I.P), and Steel Pipe and Reinforced Concrete Pipe (R.C.P.). Ductile Iron Pipe shall be used where certain conditions exist. This should be addressed at the preliminary review stage.
7.2.9 Subgrade and pipe bedding. All D.I.P., Steel or R.C.P. pipe shall have a minimum of Class "C" bedding. All PVC pipe shall have a minimum of Class "B" bedding. Wherever water or wet soil is encountered, Class "B" bedding shall be provided. If specifically designated on the plans, Class "A" or "B" bedding may be required. Typically the manufacturer's recommendations shall govern the bedding requirements of the various pipes at the varying depths.
However, the department reserves the right to increase the bedding requirements for any sewer main where the department believes the manufacturer's recommendations are not sufficient.
7.2.10 Manholes.
1) Manholes shall be installed at the end of each line; all changes in grade, size, or alignment; at all intersections; and at distances not greater than 400 feet. In no circumstances will a spacing of greater than 300 feet be allowed when the slope exceeds ten percent. Cleanouts may be used only for service laterals and special conditions and shall not be substituted for manholes. Manholes in cross-country areas shall be elevated so that the top is 18 inches above grade, with bolt down ceiling lids and a vent pipe extending above the 100-year flood elevation.
2) A drop pipe shall be provided for a sewer entering a manhole at an elevation of more than two feet above the manhole invert. Drop manholes shall be constructed in accordance with the standard details. The drop pipe shall be of ductile iron materials with mechanical joints. Also, at least one piece of ductile iron pipe shall be used on the incoming line to reach a solid, unexcavated foundation. All outside 90 degree elbows shall have thrust block poured below the elbow. Outside drop manholes will be noted on the construction plans. Where the difference in elevation between the incoming sanitary sewer and the manhole invert is less than two feet, the invert shall be row back brick, sloped from invert to invert to prevent solids deposition.
3) The flow channel through manholes should be made to conform in shape and slope to that of the sewers. Minimum drop through a manhole should be 0.1 feet. Precast inverts shall not be used.
7.2.11 Protection of water supply.
1) There shall be no physical cross-connection between a public or private potable water supply system and a sanitary sewer that would permit the passage of any sewage or polluted water into the potable supply.
2) A horizontal separation of at least ten feet is required between sanitary sewer lines and existing or proposed water mains (measured edge to edge). Should conditions prevent a separation of ten feet, the lines shall be laid in separate trenches and sanitary sewers shall be ductile iron. Where sewer mains cross existing or proposed water lines, an 18-inch vertical separation is required between the two mains (measured edge to edge).
3) Wherever possible, the elevation of the crown of the sewer shall be at least 18 inches below the invert of the water main. The two pipes shall be installed such that a full length of pipe will be centered over the crossing so that all joints will be separated as much as possible. Ductile iron pipe shall be installed for both mains at points where the two lines cross.
4) When sewers are laid within public streets, the manholes and lines shall normally be laid along the center of the street at a depth of not less than seven feet below the road surface to the top of the pipe so that service laterals will have six feet of cover at the edge of the right-of-way. In curves and other areas where this is not possible, the lines and manholes are to be installed within the confines of the curb to avoid conflict with the curb and other utilities. Ductile iron pipe shall be used for sewer lines crossing storm sewers and at other locations specified by the department.
7.2.12 Service laterals.
1) A sewer service shall be provided for every existing or proposed lot or building. All services shall be shown on the construction plans. All service laterals shall be a minimum of six inches in diameter. A common service shall not be allowed for two or more buildings. The service shall extend to five feet inside the property line of the lot being served and normally be within ten feet of the lower corner of the lot. The contractor shall install a cleanout at the right-of-way and extend the PVC cleanout to a height of three foot above the finished grade. The contractor shall also place a four inches x four inches pre-treated wood post painted green above the end of the service lateral to enable the builder to locate the service. All service laterals shall have six feet of cover at the right-of-way. Where such cover cannot be achieved, services shall be ductile iron.
2) Six inch services shall be laid at a minimum grade of one percent. Service laterals tied directly to manholes shall enter the manholes through cored holes and shall be provided with a pre-molded rubber boot as described in this article. Laterals shall enter the manhole no higher than six inches above the table and shall be provided with a concrete flume to slope the flow into the manhole invert.
3) The developer shall be responsible for serving all lots developed. On any lot where the service cannot be found, the developer shall be responsible for payment of the cost of installation of another service lateral. Also, unless noted on the final plat, the service shall be low enough to serve the first floor elevation at the building line. The builder shall be responsible for the location of services prior to the pouring of the foundation, driveway or other appurtenance. The department will not be responsible for any house built too low to be served nor for any service covered by construction.
4) No plumber or contractor will be allowed to connect to the sewerage system except to the end of the service provided for such connection, when proper permit is issued. After the service is run from the end of the lateral provided by the sewer line contractor to the house plumbing, the cleanout at the right-of-way may be cut down to a level six inches below the finished grade. The cleanout shall be provided with a cast iron ferrule with a brass screw plug to enable the cleanout to be located with a metal detector.
Plastic plugs are not allowed.
7.2.13 Provisions for future extensions.
1) Where the developer does not contemplate installation of sewers to the most upstream property line of drainage basins running through the development, a 20-foot wide permanent easement and 60-foot wide construction easement shall be required for future use of the department. These easements must be shown and recorded on the final plat.
2) Sanitary sewer lines must end at a manhole. Stubbing out sewer lines for future extensions without placing a manhole cover at the end of the sewer line is not allowed.
7.2.14 Sanitary sewer line extension requirements. If an existing trunk line must be extended to serve the property, the developer may be required to pay all of the initial costs. If the line extension would serve other developments within a one-year period, the department may negotiate with the initial developer for a pro rata share participation from future developers who wish to connect to the extension during the one-year period.
7.2.15 Air and vacuum relief valve assemblies. A and V assemblies shall be located along sewer force mains where appropriate as determined by a design professional in responsible charge of the sanitary sewer system design. All A and V assembly locations are subject to the approval of the department.
7.2.16 Polyethylene encasement. Ductile iron pipe shall be provided with polyethylene encasement whenever the sewer line either crosses or is in close proximity to a steel gas main.
7.2.17 Easements.
1) Easements for sanitary sewer lines and drainage purposes may be combined, but must be a minimum of 30 feet wide if designated for combination.
2) Sewer easements off the street right-of-way shall be clearly defined on the plat of the individual property owner and said property owner will be required to keep the easement free of all obstructions.
3) All easements shall be cleared of debris, excess dirt and other materials. The ground shall be smoothed down and grassed within ten days of completing construction work.
The use of sediment control measures will be required to protect the area until a vegetative cover is obtained.
4) Where the developer does not contemplate installation of sewers to the most upstream property line of drainage basins running through the development, a 20-foot wide permanent easement and 60-foot wide construction easement will be required for future use of the county. These easements must be shown and recorded on the final plat.
7.2.18 Joint restraint inside casing. Inside of casings, the sewer line joints shall be slip joint restrained by using U.S. Pipe "Field-Lok" gaskets or approved equal.
7.2.19 Wastewater lift stations. For the purposes of this section, references to wastewater lift stations shall also include wastewater lift stations A wastewater lift station means a pumping station that moves wastewater from a lower elevation to a higher elevation through pipes.
1) Approval of lift station usage.
(a) Lift stations. A new lift station will only be considered for approval by the Paulding County Water System Director after consultation with Paulding County Community Development Department and upon satisfaction of the following conditions:
i. Gravity sewer is unavailable to the property. "Unavailable to the property" shall mean that gravity sewer is more than 5,000 feet down gradient. This distance requirement may be varied by up to 1,000 feet by the Paulding County Water System Director after consideration of the following factors:
(1) Actual field conditions;
(2) Size of the project; and/or
(3) Availability of necessary easements.
ii. Layout and placement are in accordance with the current Paulding County Master Sewer Study and Plan as approved by the Paulding County Board of Commissioners; and
iii. The new lift station is not located downstream from an existing lift station.
Where the new lift station is proposed to be located downstream from an existing lift station, the water system director or designee may, at their discretion, require a gravity line to be installed to carry flow from the existing lift station to the proposed downstream lift station thus eliminating the existing lift station. The Paulding County Water System Director or designee may, at their discretion, allow the developer to move some or all of the existing lift station equipment and reuse it. If the reuse of equipment is allowed, the developer must coordinate with the Paulding County Lift Station Maintenance Team Leader and assume complete
responsibility for handling of all flows during the transition period.
(b) Industrial/commercial lift stations. Approval for the installation of a new industrial or commercial lift station may be considered by the Paulding County Water System Director after consultation with the Commercial Development Assistance Review Team (CDART) for the proposed development.
(c) Lift stations authorized by a development agreement. Where the layout and placement of a new lift station serves to benefit water system infrastructure as evidenced by a development agreement approved by the board of commissioners, approval for the installation of the new lift station is authorized.
(d) Preapproval required. The formal review and approval of any new lift station must be completed prior to the submission of rezoning applications or construction plans.
2) Lift Station location.
(a) The designer shall locate the lift station to drain the largest possible subbasin(s) associated with the proposed development. The Paulding County Engineering Division Manager or designee shall have final approval of the location of the lift station. The parcel required for the lift station shall be deeded to the county prior to placing the lift station into service.
(b) Force mains shall be located on easements deeded to the county prior to placing the line in service. The use of public road right-of-way for force main installation is considered an exception subject to approval by the director of PDOT after review by the utility coordinator. PDOT or the water system may require provisions for funding future relocation if the force main is located through intersections or along corridors anticipated to be improved under the County Comprehensive Transportation Plan or Statewide Transportation Plan.
3) Betterment in conjunction with a proposed lift station.
(a) Where a new lift station is proposed, the Paulding County Water System Director, or designee, will investigate the service impact associated with future Paulding County needs within the sub-basin, and the potential installation of additional force mains required to serve the sub-basin which drain to the lift station. If in the engineering division manager's or designee's opinion, a larger lift station or additional or larger force main should be installed concurrently with the developer's project, the designer shall design and the Paulding County Engineering Division Manager or designee shall review and approve the design of said betterment. Where practical, all force mains shall be installed in parallel and in the same trench.
(b) The extra cost associated with the betterment may be paid by the county under a development agreement. The conditions relating to the method of payment will be negotiated by Paulding County Water System on a case-by-case basis during the development review process.
4) Acceptance. The developer shall provide for the benefit of the county a one-year warranty from the date of county acceptance for the entire lift station/force main system to Paulding County Water System.
5) Lift station fees. In comparison to gravity sewer systems, lift stations carry significant ongoing operational, maintenance and, ultimately, replacement costs. As a result, a developer seeking to install and dedicate a lift station for a particular project shall be required to pay the lift station fees set forth in this section prior to receiving county approval to construct a new lift station for a development project.
These fees are intended to recover some or all of the projected future costs to operate, maintain, and replace the sewage pumping station over a 20-year planning period.
(a) Operation and maintenance fee. So that existing water and sewer customers are not burdened by the cost of future operation and maintenance of a developerinstalled pump station, a developer shall pay for such future operation and maintenance of its pumping stations dedicated to the Paulding County as follows:
Lift station Category Charge For Future O&M 0—99 Horsepower (HP) $220,000 100—249 HP $249,000 250—350 HP $415,000
(b) Phase-out fee. Because of the various costs associated with the operation of lift stations, it is the operational goal of the county to limit the number of new lift stations added to the existing sewer system and to gradually phase-out or replace such stations with gravity sewer. In order to defray the future costs that will be associated with phasing out a newly-approved lift station following its service life, the developer shall pay a phase-out fee to defray the future costs of converting the lift station to a gravity system. The phase-out fee shall be calculated using the following formula:
Phase-out Fee = D × C (1 + cci)^20 (P/F) D: Distance from the lift station location to the nearest down gradient interceptor sewer. If no down gradient sewer exists at the time of plan approval, the distance shall be to that of the centerline of the stream along which a future interceptor will be built. The maximum distance shall be 5,000 feet.
C: Cost per linear foot of constructing new eight-inch gravity sewer to the nearest down gradient interceptor sewer as estimated by the water system using recent competitive bids on other projects.
cci: Average construction cost index factor of the previous five years.
P/F: The factor to calculate the present worth of future expenses in 20 years at an interest rate equal to the effective rate of the most recent water and sewer revenue bond issue.
(c) Force main relocation fee. This fee shall be paid by the developer if the location of a force main seeking to be dedicated is potentially impacted by future roadway construction for which the county has a planned road construction project. The amount of this fee shall be determined by the Paulding County Water System Director, or designee thereof, calculating the approximate cost to relocate the force main from its existing/proposed location to the closest reasonable future location that will not be impacted by future roadway construction.
(d) All fees required by this section shall be paid by the developer prior to receiving any county approval for the construction of a lift station and/or force main.
(e) Neither the operation and maintenance fee nor the phase-out fee shall be assed if there is no net increase in the number of pump stations within the drainage basin as a result of the project development.
6) Lift station general design requirements.
(a) Lift stations, force mains, and all related appurtenances must be designed and installed in a professional manner and in accordance with all Paulding County design standards, applicable building codes, construction standards, federal, state, and county regulations, etc.
(b) The developer's engineer (professional engineer registered in the State of Georgia) shall design the system. The engineer shall have expertise in lift station and force main design and operation.
(c) The designer shall consult with the Paulding County Engineering Division Manager, or designee, during the design of the system.
(d) Any excess lift station capacity due to the difference in capacity between the developer's projected flows and the standard equipment sizes shall not be considered as belonging to the developer. Any such "extra" capacity beyond that needed for the original development shall become the property of the Paulding County Water System to utilize at its discretion.
(e) A "construction permit" must be obtained from Paulding County Community Development Department and a pre-construction conference must be held with the Paulding County Water System Engineering & Construction (E&C) inspector, developer/owner, design engineer, and contractor before any work may begin.
(f) The installer of the lift station and force main must be included on the current Paulding County Water System Approved Utility Contractors List. The list is available on the county website or by contacting the Paulding County Engineering Division Manager.
7) Lift station specific minimum requirements. The following minimum requirements shall apply to lift stations:
(a) General.
i. The depth of the wet well shall determine whether a submersible or mounted pump is used. Wet wells for mounted pumps shall not exceed 15 feet in depth, subject to the design conditions and approval of the department.
ii. Lift stations having less than 500 gpm capacity (per pump) shall utilize two pumps each having a capacity equal to the design flow.
iii. Lift stations having a capacity of 500 gpm or more shall be reviewed on an individual basis and may have requirements differing from those outlined herein.
iv. Grinder type centrifugal pumps will be used for pumps having a capacity of less than 100 gpm. Force mains shall be sized to provide a velocity of at least two feet per second.
v. The design shall allow for easy removal of any pump or equipment item without the need for the shut-down of the entire lift station. A lift assembly shall be provided for pump or equipment removal.
vi. The design engineer should consult the department after preliminary design data has been developed for information on approved pump
manufacturers. The department reserves the right to review each application on an individual basis and to reject the use of nonapproved manufacturers.
(b) Submittals.
i. Submittal of construction plans shall include the following lift station information:
(1) Capacity calculations. Use one gpm capacity per house on residential developments of less than 200 units, except that the minimum pump
capacity shall be 30 gpm.
(2) System head calculations, tabulated and plotted on the pump curve.
Include a plot of force main velocity.
(3) Construction drawings, details and specifications in sufficient detail to ascertain compliance with these regulations.
(4) Cycle time. Calculations showing determination of wet well volume and cycle time at design conditions. Wet well volume should be
sufficient to provide a cycle time of no less than five minutes from a pump "on" to next pump "on" time.
(5) Storage volume. Calculations showing volume of storage available in the even of a power outage. The storage zone shall be delineated on plan and profile drawings of the sanitary sewer system (see the
subsection below on "standby power").
(6) Buoyancy computations showing that structures are protected against flotation.
ii. After construction plan approval, but before purchasing any lift station equipment, shop drawings shall be submitted containing the following information:
(1) Manufacturer's catalog sheets, performance curves, installation drawings, specifications and list of options for the specific pump that is offered for approval.
(2) Similar catalog data for controls, valves, hatches, yard hydrants, precast wet well and other manufactured items.
iii. After installation and before placing the system into full operation, the work must be inspected by the developer's engineer, who must then issue a certification to the department verifying that all work has been completed in accordance with approved plans. This certification shall include all construction of the lift station and force main. After acceptance of the work by the engineer, a factory representative shall inspect and start up the system certifying rotation, capacity, amperage draw, lack of vibration and other standard check points. This certification shall state the beginning date of the warranty and include a copy of the warranty.
iv. On or before the date of start-up, five sets of Factory O and M Manuals shall be delivered to the department. These shall include the name of the purchaser, the serial numbers of pumps, detailed wiring schematics, telephone number and address for purchase of parts.
v. After construction is complete, as-built drawings shall be furnished including one set of mylar sepias plus four sets of prints.
(c) Spare parts—per manufacturer's recommendations. Lift stations shall be supplied with a spare complete pump, an extra impeller, set of bearings and a complete set of manufacturer's recommended spare parts.
(d) Standby power.
i. The minimum requirement for standby power for lift stations shall be that each station that does not have a permanent in-place generator shall have installed a manual transfer switch and receptacle for quick connection of a portable generator.
ii. The need for providing a permanent in-place generator will be determined on the basis of storage time in the sanitary sewers leading to the lift station. If the storage time is less than 12 hours then a permanent generator must be installed. If storage time equals 12 hours or more only a transfer switch and provisions for connecting to a portable generator will be required. The following rules shall apply:
(1) Storage volume available shall be taken as the volume between the low water level in the wet well and the elevation at which overflow would first occur (this might be the top of the wet well or that
upstream manhole having the lowest top elevation). Volume of the wet well, manholes and sanitary sewer mains will be counted.
(2) The rate of sewage inflow for these computations shall be taken as 150 gallons per day per residential unit. Systems serving other than residential customers will be considered individually.
(3) Height of manholes shall not be extended above normal for the purpose of meeting this regulation. The design shall ensure overflow before backing sewage into a dwelling or other building.
iii. When required, emergency power will be supplied by an on-site emergency generator. The generator shall be diesel powered with an automatic transfer switch and provisions for an automatic exercise cycle. Specifications for the generator shall be submitted to the department for approval.
(e) Site requirements.
i. Flooding. Lift stations must remain fully operational and accessible during the 25-year flood. All electrical controls shall be above the 100-year flood level. All motors and mechanical equipment shall be protected against physical damage from the 100-year flood.
ii. Access road. Access roads shall be paved with a 12-foot wide surface of either concrete (six inches thick with wire mesh) or asphalt (six inches graded aggregate base plus two inches Type E asphalt). Maximum grade shall be 20 percent. Where access road lengths exceed 350 feet, six inches graded aggregate base may be used in lieu of a paved driveway. In cases where gravel driveways are utilized, the maximum grade shall be ten percent.
iii. Ownership. Both the lift station and the access road right-of-way shall have fee simple ownership dedicated to the county, and this shall be indicated on the subdivision plat. The dedicated space for the lift station shall include sufficient space for parking two trucks, plus turn-around, plus slope maintenance. The dedicated width on road right-of-way shall be 40 feet minimum.
iv. Fencing. Lift station sites shall be fenced with a minimum of six-foot high chain link fencing topped with three strands of barbed wire. Access gates shall be a minimum of 15 feet in width. The space inside the fencing shall be large enough to facilitate service vehicle access to the pumping station whenever the access road length exceeds 200 feet or when the road grade exceeds ten percent.
v. Water supply. A metered water supply line (one-inch minimum size) shall be installed to the site, with the meter placed on the outside of the fencing.
Inside the fence, in an insulated, vented, above ground enclosure, a pressure reducing valve shall be placed in the water main, followed by a reduced pressure zone back flow preventer with by-pass. Beyond the enclosure, a freeze-proof yard hydrant (Murdock BFHM-100 or approved equal) shall be installed near the wet well. The hydrant shall be equipped with a suitable backflow preventer (Watts No. NF8 or approved equal).
vi. Lighting. One pole-mounted, photo cell controlled, 150-watt mercury vapor security light shall be installed. It shall be equipped with a manual on/off switch (located in the main control panel) to override the photo cell control.
vii. Screening. Where natural screening is not present to screen the site from view of residences, special plantings shall be installed to screen the site.
viii. Ground covers. All unpaved ground areas inside the fence and extending four feet beyond the fence shall be treated with a herbicide and covered with a geotextile fabric, followed with a four-inch layer of no. 57 stone. The geotextile fabric shall be a nonwoven polypropylene weighing eight ounces per square yard with a minimum burst strength of 250 p.s.i., such as Amoco Type 4553 or equal.
(f) Design features.
i. Wet well volume. The wet well volume shall be sized to limit pump cycles to no more than six cycles per hour under worst conditions.
ii. Ventilation. For wet wells, the minimum requirement shall be two-gravity vent pipes designed for natural ventilation. Vents shall be elevated to a minimum of two feet above the 100-year flood plain. Where conditions are conducive to formation of hazardous conditions (in the design engineer's opinion), then mechanical ventilation shall be provided. For dry wells, mechanical ventilation shall be required.
iii. Structures. Submersible lift stations shall have a wet well structure and a separate valve pit. Both structures shall be precast concrete with a monolithic base. The valve pit shall be a minimum of four-foot x four-foot x five-foot-deep with an aluminum ladder, and provided with a floor drain pipe, and a three-foot x three-foot lockable aluminum access hatch. Wet wells may be either round or rectangular and shall have a diameter or width of at least five feet. Wet wells shall be sized to meet cycle time requirements with a drawdown (i.e., the distance between high water level and low water level) of not more than three feet. The wet well shall have a lockable aluminum hatch large enough for easy removal of pumps. Riser sections in precast units shall be sealed watertight using butyl rubber sealant or other approved sealant. Mastic shall not be used. Structures shall be adequately reinforced for all loading conditions normally encountered during shipping, construction and service. All openings (for pipes, hatch, conduits) shall be either cast in place or cored. Sanitary sewer pipe connections shall utilize rubber boot connectors and be watertight. The wet well shall be equipped with an aluminum ladder.
iv. Accessories. All materials in the wet well and valve pit shall be corrosion resistant. Mechanical equipment requiring ferrous metals shall have a coal tar epoxy coating. Guide rails for pumps shall be stainless steel.
Miscellaneous metals including fasteners shall be aluminum or stainless steel; anchor bolts shall be stainless steel.
v. Pressure gauge. A pressure gauge shall be installed on the force main downstream of the gate valves, inside the valve pit and visible from ground level. A corporation stop shall be installed on the tap to allow removal of the gauge.
vi. Valves. The discharge pipe of each pump shall have a slow-closing check valve followed by a gate valve before the two pipes join into a common force main.
vii. Surge control valves. The pumping system shall be checked to determine if a surge control valve is required. If a valve is required, it shall be located within the valve pit on the common force main and a drain line installed to drain the wet well.
(g) Required pump features.
i. Nonclog, Vortex, or suitable substitution impeller made from cast iron unless extreme conditions require stainless steel.
ii. Be capable of passing a three-inch sphere (except grinder and vortex pumps).
iii. Be capable of dry operation without overheating.
iv. Have mechanical seals with seal leak/overload sensor read by the controller.
v. Pump and motor casings shall be cast iron, and all fasteners shall be stainless steel.
vi. Motor shall be selected to be non-overloading under all operating conditions.
vii. Motor winding shall have a heat sensor with auto reset to prevent overheating; three-phase motors shall have two sensors.
viii. Operating speed of the pump shall not exceed 3600 rpm without special approval.
ix. Pumps shall have a five-year warranty.
x. Pumps shall be automatically connected to the discharge connection elbow when lowered into place and shall be easily removed for inspection or service. There shall be no need for personnel to enter pump well. Sealing of the pumping unit to the discharge connection elbow shall be accomplished by a simple linear downward motion of the pump. Each pump shall be equipped with a stainless-steel chain for easy removal.
xi. Only Paulding County-approved pumps shall utilized (e.g., Grundfos, Mody, Hydromatic, Zoeller or approved equal).
xii. Motors shall be capable often starts per hour.
(h) Force main.
i. The force main shall be sized for a minimum velocity of two feet per second with one pump operating.
ii. Force mains of four-inch diameter or larger shall be Class 350 or equivalent pressure class ductile iron pipe or L905, DR-14 PVC pipe or approved equal. Smaller force mains may be used only with grinder pumps and shall be PVC Pipe, SDR-21 with gasket joints. Buried PVC pipe shall be marked continuously with metallized locator wire.
iii. The force main profile shall slope continuously upward where practical. If high points occur where air could be trapped in the pipe, then a
combination air release and vacuum relief valve (of the type made for sewage applications) will be installed at the high points.
iv. The minimum depth of cover over force mains shall be four feet.
(i) Electrical.
i. Lift station controls and electrical components shall be factory-wired in completely weatherproof stainless steel metal cabinets (NEMA 4X stainless steel). The cabinet shall be provided with condensate heaters, ventilation fans, air conditioning where required for VFD. Spare fuses of each type that is used in the electrical/control system shall be furnished.
Panels shall be manufactured by Goforth Williamson Inc.
ii. A main circuit breaker shall be installed to disconnect power to the entire station.
iii. Three phase power will be provided for all motors exceeding five HP. Phase converters will not be allowed.
iv. Protection against voltage surge and loss of a phase for control power and three phase service shall be provided.
v. The factory-wired panel shall be equipped with a ground bus and neutral bus. Terminal shall be suitable for either aluminum or copper wire. All internal panel wiring shall be copper.
vi. Motors shall be suitable for either 230 volt or 460 volt operations. Design engineer shall consult with the appropriate local electric utility provider to verify specifics pertaining to electrical power availability.
vii. Wet well level shall be controlled by four sealed mercury tube float switches. All floats shall be provided with 25 feet of Type SJO flexible cord and shall be attached to a bracket mounted at the top of the wet well. Float functions shall be as follows:
Float no. 1—Low level (pumps off) Float no. 2—High level (lead pump on) Float no. 3—Extra high level (lag pump on) Float no. 4—Surcharge level (alarm activated) viii. The pump control system shall include the following features:
(1) Lead pump/lag pump alternator.
(2) From 20 HP to 49 HP shall have soft starts with a six-year drive protection warranty.
(3) From 50 HP and above shall have VFDs with a six-year drive protection warranty.
(4) Pump failure indicating light.
(5) Condensate heater.
(6) H-O-A switch and run light for each pump.
(7) Control voltage shall be 120V.
(8) Wiring shall be neatly tied and number coded to facilitate maintenance.
A schematic diagram shall be furnished with the panel.
(9) A 120V GFCI type electrical receptacle shall be located at the control panel.
(10) Lift stations will be equipped with a cellular based telemetering circuitry connecting to the department's SCADA system (Grundfos
Utility Connect). The specific requirements are:
a) Grundfos 10 351B Controller.
b) Grundfos CU 362 Controller Interface.
c) MP 204 Electronic Motor Protection Unit.
d) Vega C21 Radar.
(Ord. No. 24-08, § 1, 6-25-2024)
7.3 Materials.
7.3.1 General. All materials used in the work including equipment shall be new and unused materials of a reputable U.S. manufacturer conforming to the applicable requirements of these regulations, and no materials shall be used in the work until they have been approved by the department. Any reference to AWWA, ANSI, ASTM or other such specification shall mean the latest revision published.
7.3.2 Sanitary sewer pipe.
1) Ductile iron pipe (D.I.P.)
(a) D.I.P. shall be designed in accordance with AWWA C150. Minimum wall thickness for four inch - 12 inch diameter pipe shall be Pressure Class 350;
minimum wall thickness for 14 inch - 20 inch diameter pipe shall be Pressure Class 250; minimum wall thickness for 24 inch diameter pipe shall be Pressure Class 200; minimum wall thickness for pipe larger than 24 inch in diameter shall be Pressure Class 150. Pipe shall be manufactured in accordance with AWWA C151. Wall thicknesses greater than the minimums call for above may be required due to greater depths or varying bedding requirements.
(b) All D.I.P. shall be subject to inspection and approval by the department after delivery. No broken, cracked, imperfectly coated or otherwise damaged or unsatisfactory pipe or fittings shall be used. The pipe interior shall be Polybond, Polyline, polyurethane or Protecto 401 ceramic epoxy lined with a minimum thickness of 40 mm. The exterior shall be seal coated with an approved bituminous seal coat in accordance with AWWA C151.
(c) Pipe joints shall be push-on joints conforming to AWWA C111, unless specified otherwise on plans. Where called for, mechanical joints shall conform to AWWA C111.
2) Polyvinyl chloride (PVC) sewer pipe.
(a) Pipe and fittings. All PVC pipe and fittings through 15 inches shall meet the requirements as specified under ASTM D3034. PVC pipe 18 inches in diameter shall meet the requirements of ASTM F679. All pipe and fittings shall be suitable for use as a sanitary sewer conduit. Bell joints shall consist of an integral wall section with elastomeric gasket joint that provides a water tight seal. Standard laying lengths shall be 13.0 - 18.0 feet (+/- 1 inch). The pipe shall be capable of passing all tests that are detailed in this specification. Minimum wall thickness for pipe through 15 inches in diameter shall be as specified under SDR 35 in ASTM D3034. Minimum wall thickness for 18 inch diameter pipe shall be as specified under T-1 in ASTM F679. PVC sewers with more than 12 feet of cover may require wall thicknesses greater than SDR 35 or T-1. PVC is not allowed for sewers greater than 18 inches in diameter or more than 14 feet of cover or less than six feet of cover.
Each length of pipe shall be marked with the manufacturer's name, trade name, nominal size, class, hydrostatic test pressure, manufacturer's standard symbol to signify it was tested, and date of manufacture. Each rubber ring shall be marked with the manufacturer's identification, the size, the year of manufacture, and the classes of pipe with which it can be used.
All PVC fittings and accessories shall meet the requirements specified under ASTM D3034 or F679 and shall be manufactured and furnished by the pipe supplier. They shall have bell and/or spigot configurations compatible with that of the pipe and shall have an equivalent wall thickness.
(b) Pipe and fittings tests. All shipments of pipe and/or fittings shall be tested and certified to by an approved independent testing laboratory. Up to 0.5 percent of the number of pipe of each size furnished shall be tested, except that in no case shall less than two specimens be tested. The contractor shall be responsible for providing three certified copies of the test results obtained by the testing laboratory under provisions for testing in the applicable test procedures listed below. Testing shall be done at the contractor's expense, and no pipe shall be installed until the test results are approved by the department.
(c) Pipe stiffness. Minimum "pipe stiffness" (F/Y) at five percent deflection shall be 46 psi for all sizes, when tested in accordance with ASTM Standard Method of Test D2412, to determine the "External Loading Properties of Plastic Pipe by Parallel Plate Loading." There shall be no evidence of splitting, cracking or breaking at a deflection of up to 30 percent of the original diameter.
(d) Extrusion quality. There shall be no evidence of flaking, swelling or disintegration when the pipe material is tested in accordance with ASTM D2152, "Quality of Extruded Poly (Vinyl Chloride) Pipe and Molded Fittings by Acetone Immersion."
(e) Joint tightness. Pipe and fitting joints shall comply with ASTM D3212 for "Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals." Joint assemblies shall not leak when subjected to both an internal and external hydrostatic test at equivalent pressures of 10.8 psi gauge for a period of one hour.
Pipes shall be tested in straight alignment, axially deflected position, and by shear load test as otherwise defined in paragraphs 7.2, 7.3 and 7.4 of ASTM D3212.
(f) Impact resistance. Pipe shall comply with impact resistance test conducted in accordance with ASTM D2444, "Test for Impact Resistance of Thermoplastic Pipe and Fittings by Means of a Tup (Falling Weight)."
(g) Installation. PVC pipe will be installed in accordance with ASTM D2321 (latest revision). Class "B" bedding is the minimum bedding requirement for PVC pipe.
In any area where the pipe is below existing ground water level or below the 100-year flood plain level, the contractor will embed PVC pipe in sand or graded gravel.
(h) Deflection limit. Vertical deflection of installed pipe shall not exceed five percent of the undeflected diameter as defined in ASTM D3034. Upon completion of the pipe laying, and at least 30 days after installation (to allow for settling), the pipe will be tested for final acceptance (subject to the one-year maintenance period).
The test shall be performed by the contractor pulling a mandrel of specified dimensions through the pipeline.
3) Reinforce concrete pipe (R.C.P.).
(a) General. The use of reinforced concrete pipe for sanitary sewers will be subject to approval on a case-by-case basis depending upon the size of the sanitary sewer and site conditions. When approved for use, concrete gravity sanitary sewer pipe shall meet all materials and testing requirements of ASTM C76, ASTM C443 and ASTM C497 (except where modified herein).
(b) Quality assurance. The contractor must submit to the department the concrete pipe manufacturer's evidence of a working quality control program for approval, prior to any pipe being manufactured. The program and standards of manufacturing must be established and well defined. The program must include the minimum following requirements:
i. A full time quality control technician.
ii. A complete and working quality control laboratory capable of testing and recording the requirements set forth in these specifications for concrete pipe.
iii. A zero defect program for daily material testing and finished product testing to assure quality control as the pipe is being manufactured and shipped for this particular project.
(c) Material. R.C.P. material shall conform to the following specifications:
i. All concrete pipe and fittings 12 inches in diameter and larger shall be reinforced concrete sanitary sewer pipe conforming to the latest requirements of ASTM C76 with the following modifications: all concrete pipe with zero to 14 feet of fill shall be a minimum of Class III with 4,500 psi concrete.
All pipe with 12 to 24 feet of fill shall be Class IV with 4,500 psi concrete. All pipe with 24 feet of pipe and over shall be Class V with 5,500 psi concrete.
ii. Pipe shall have circumferential reinforcement as required for the particular class of pipe furnished. The bell and spigot of the joint shall contain circumferential and longitudinal reinforcement. Reinforced concrete pipe shall be centrifugally cast or vibrated, horizontally or vertically cast or made on a Packerhead machine and shall be furnished in lengths not more than 20 feet and not less than eight feet, except where short lengths are required for construction conditions. Reinforced concrete pipe shall have bell and spigot joints suitable for the use of a rubber gasket to be provided as part of this item.
iii. Concrete pipe for sanitary sewers shall have bell and spigot joints consisting of self-centering steel joint rings securely attached to the pipe reinforcing steel. The steel joint rings shall be suitable for use with a rubber O-ring type gasket to be provided as part of this item.
iv. Bell and spigot joints consisting of self-centering steel joint rings shall have the joint rings securely attached to the pipe reinforcing steel. The rings that form the joint shall be made so that they will join with a close, sliding fit.
The joint surfaces shall be such that the rubber gasket shall be confined on all sides and shall not support the weight of the pipe.
The spigot ring shall have an external groove accurately sized to receive the gasket. Special section steel for spigot rings shall conform to ASTM A283, Grade A, or ASTM A306, Grade 50.
The bell ring shall be flared to permit gradual deformation of the gasket when the joint is assembled. Minimum thickness of bell rings shall be 3 /16
inch. Bell rings 1 /4 inch or thicker shall conform to ASTM A283, Grade A, or ASTM A306, Grade 50. Bells less than 1 /4 inch thick shall conform to ASTM A570, Grade A.
Each ring shall be precisely sized by expansion beyond the elastic limit of the steel and then gauged on an accurate template. All exposed surfaces of both rings shall be protected by a corrosion-resistant coating of zinc applied by an approved metalizing process after proper cleaning.
v. Lining. The pipe interior shall be Polybond, Polyline, polyurethane or Protecto 401 ceramic epoxy line with a minimum thickness of 40 mm.
4) Steel pipe.
(a) Steel pipe shall meet the requirements of ASTM A139, Grade B, and shall have a wall thickness of 0.500 inches. Both the inside and the outside of the pipe shall have two coats, five mm DFT per coat, of Epoxy-Polyamide Coating (TNENEC Series 66 Epoxy-Line or Mobil 78 Series or approved equal). Pipe shall be sand-blasted to near white metal (SSPC-SP10) prior to coating.
(b) Flanges shall be steel welding neck style, ring joint type (with recessed groove and special ring gaskets), with Class 300 rating conforming to ANSI B16.5 / ASTM A105. Bolts, nuts and washers shall be A304 stainless steel.
7.3.3 Casing pipe.
1) Steel casing pipe shall be schedule 40 thickness with a minimum yield strength of 35,000 psi and shall conform to the requirements of ASTM A139. It shall be fully coated on the exterior and interior with a coal tar epoxy coating. The casing pipe diameter shall be six to eight inches greater than the "bell" diameter of the carrier pipe.
2) Wherever steel casing is required, the carrier pipe shall be ductile iron pipe with push-on joints, with Field-Lok gaskets. Approved spacers shall be used to secure the pipe on grade during grouting operations. A manhole shall be placed at each end of the cased section at a distance of five to ten feet beyond the end of the casing. Ductile iron pipe shall be continuous from manhole to manhole.
7.3.4 Wyes and bends. Wyes and bends shall be equal in quality to the materials of the pipeline being installed.
7.3.5 Manholes.
1) Precast manholes.
(a) Precast manholes shall be constructed of Portland cement concrete with a compressive strength of not less than 4000 psi at an age of 28 days. The minimum inside diameter of the manhole shall be as required by the standard detail. The wall thickness shall not be less than five inches. Manholes shall be placed on a stable subgrade. Joints in the wall shall be tongue and groove type. Sections shall be joined using O-ring rubber gaskets, flexible plastic gaskets conforming to the applicable provisions of ASTM Standard Specification, Serial Designation C443, or an approved bitumastic joint material. Precast concrete manholes shall consist of precast reinforced concrete sections with eccentric (or flat slab for shallow manholes) top section and a base section conforming with the typical manhole details as shown on the standard detail. Flat top manholes will be approved only if a need for such can be demonstrated by the design professional.
(b) Each section of the precast manhole shall have not more than two holes for the purpose of handling and laying. These holes shall be sealed with cement mortar using one part Portland cement to two parts clean sand, meeting ASTM Standard Specifications, Serial Designation C144.
(c) Holes in precast bases to receive sewer pipe shall be precast at the factory at the required locations and heights. Knocking out of holes in the field will not be permitted; however, holes can be cored in the field with a coring machine. The design, the materials used in, the manufacturing process, and the transportation of precast manhole shall be subject to inspection at any time by the department.
Materials found defective by the department will not be delivered to the job site.
Material on the job site that is found defective shall be removed immediately after being notified that such materials are unacceptable. Precast manhole shall conform to ASTM C478.
(d) Pre-molded rubber boots with stainless steel bands shall be used for connecting sewer pipe to manholes. These may either be the lock-in "Kor-N-Seal" type as manufactured by Interpace Division of Ball Rubber, Inc., or approved equal. In all cases, the boot shall be sized to suit the outside diameter of the type pipe being used.
(e) The invert of manholes shall be constructed of concrete or brick in accordance with the standard details and shall have a cross section of the exact shape of the invert of the sewer which it connects, changes in size and grade being made gradually and evenly. Changes in the direction of the sewer and entering branch or branches shall have a true curve of as large a radius as the size of the manhole will permit. Inverts shall have a "smooth trowel" finish. The manhole bench shall be sloped 30 degrees from the manhole wall toward the invert. Manholes shall be provided with steps built into the wall as shown on the detailed drawings. Drop manholes will be required where the invert of any incoming line will be higher than two feet from the invert of the outlet pipe. All manholes will be water tight when completely built.
2) Manhole steps. Manhole steps shall be of #4 steel reinforcing bars covered with Polypropylene plastic or rubber and shall be supplied with depth rings and other necessary appurtenances. The manhole steps shall conform to the applicable provisions of ASTM Specification C478, and shall be similar to and of equal quality to the "Sure Foot" by Oliver Tire and Rubber Company of Oakland, California, or "PSI-PF" by M.A. Industries of Peachtree City, Georgia. The step shall be factory built into the precast sections.
3) Manhole cover and frame. Manhole covers shall be cast iron with a coat of asphaltic paint applied at the foundry. The frame and cover shall be as shown on the detail drawings. All covers shall have "Sewer" printed on them. Manhole frame and covers shall be as manufactured by Neenah R-1765 (365 pounds) in paved roads, parking lots and driveways, and Neenah R-1779 (300 pounds) for nontraffic areas, or approved equal. Manhole frames shall be cast in the cone if located in nontraffic areas.
4) Waterproof manhole frame and cover. Waterproof manhole covers shall be cast iron with a coat of asphaltic paint applied at the foundry as shown on the drawings with a "bolted-down" lid. All covers shall have "Sewer" printed on them. Manhole frame and covers shall be as manufactured by Neenah Foundry Company R-1915-F2 (435 pounds) or approved equal. Manhole frames shall be cast in the cone if located in a nontraffic area.
5) Manhole foundation. The manhole base shall be set on a compacted mat of No. 57 crushed stone graded level at the thickness show on the standard detail drawings. In wet areas, the crushed stone mat shall be thickened as needed to provide a nonyielding foundation.
6) Brick. Brickwork required to complete the precast concrete manhole shall be constructed to meet ASTM Specifications, Serial Designation C144, thoroughly mixed to a workable plastic mixture. Brickwork shall be constructed in a neat and workmanlike manner. Cement mortar shall be used to grout interior exposed brick joints and faces.
No more than three courses of brick with nine inch maximum total depth of bricks may be used to adjust manhole covers.
7.3.6 Concrete and mortar.
1) Concrete shall consist of Portland cement, a fine aggregate, a coarse aggregate and water. Portland cement shall conform to Fed. Spec. SS-C-19 lb. Fine aggregate shall be a clean, sharp, well-graded sand conforming to Fed. Spec. SS-S-51. Coarse aggregate shall be uniformly graded broken stone or gravel which will pass a 11 /2 inch screen and
be retained on a 1 /4 inch screen. Aggregate shall be free of clay, loam silt, or organic matter. Water used for concrete shall be clean and free from vegetable, sewage or organic matter and the total amount used shall not exceed six gallons per sack of cement. Forms may be of wood or metal properly braced to prevent bulging. Concrete shall be thoroughly mixed and well vibrated into forms and around fittings. Exposed surfaces of concrete shall be protected from premature drying by being kept covered and moist for a period of seven days. After the forms have been removed, the voids in the interior surface, if any, shall be properly filled with cement mortar and the whole surface rubbed uniformly with neat cement.
2) All mortar shall be composed of one part Portland Cement to three parts sand, conforming to these specifications.
3) All concrete shall have a compressive strength of not less than 3,000 psi at an age of 28 days.
7.3.7 Reinforcing steel. Bars for concrete reinforcement shall be of the sizes, lengths and bent as shown on plans. Bars shall be ASTM Specifications A615, Grade 60. All steel shall be free from rust, scale or any foreign coating.
7.3.8 Brick. All brick shall be best grade, hard-burned, common, giving a ringing sound when struck and acceptable to the department. Only bricks presenting a regular and smooth face shall be used. When submerged in water for 24 hours, they shall not absorb more than ten percent of their weight in water. Brick shall be culled when delivered on the ground, and all imperfect brick are to be immediately removed from the work. All salmon, soft or arch brick or brick made of alluvial soil will be rejected. All brick used in the work shall be of uniform size.
7.3.9 Subgrade stabilizer stone. Stabilizer for subgrade shall be either approved crushed stone or gravel, uniformly graded from 1
/4 inch to 11 /2 inches in size.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.