Skip to content
Georgia Commons
Menu

Peachtree City · Zoning Ordinance

Appendix A - ZONING / Article X - REQUIREMENTS BY DISTRICT

Sec. 1005B. Property rezoned to OI.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • This section's figures, maps, or images are in the source and are not shown here.

(1005B.1) Three tracts of land fronting on Georgia Highway 74 North are rezoned from GR-6 general residential to OI office/institutional. These three tracts of land are more particularly described on a document entitled "Proposed Zoning and Development Map for the McWilliams Property," drawn by Lorber and Associates and dated July 22, 1994. Said map is maintained in the office of the city clerk, and a copy is incorporated herein as figure 1005B.1. For purposes of identification, the three tracts affected by this rezoning action are labeled parcel "A" (about 1.2 acres), parcel "C" (about 1.3 acres), and Parcel "D" (about 1.0 acres). Altogether, this rezoning includes 3.5 acres.

Figure 1005B.1

(Ord. No. 628, 10-20-1994)

(1005B.2) Ergle tract:

(a) Two tracts of property described below shall be rezoned from their present classification of AR Agricultural Reserve to OI Office Institutional. Said properties are more particularly described as follows:

Tract 1: All that tract or parcel of Land lying and being in Land Lot 158 of the 7th District, Fayette County, Georgia and being more particularly described as follows:

Beginning at an ½" rebar placed at the northern right-of-way of Wisdom Road and the eastern right of way of State Road 74 and the thence along said eastern right of way line along a curve to the right an arc distance of 281.58 feet having a radius of 2,754.80 feet being subtended by a chord of North 08°18'59" West a distance of 281.46 feet to a point; thence North 08°18'59" West, a distance of 258.43 feet to an axle found; thence North 88°15'12" East, a distance of 230.09 feet to a ½" rebar set; thence South 08°05'23" East, a distance of 164.19 feet to an axle found; thence South 86°09'27" West, a distance of 20.92 feet to a point; thence South 09°39'51" East, a distance of 343.73 feet to a point on the northern right of way of Wisdom Road; thence along said right of way along a curve to the left an arc distance of 126.34 feet having a radius of 1885.25 feet being subtended by a chord of South 80°38'37" West a distance of 126.32 feet to a point; thence South 78°06'30" West, a distance of 78.02 feet to a ½" rebar placed and the Point of Beginning. Containing 112,309 square feet or 2.578 acres.

Tract 2: All that tract or parcel of Land lying and being in Land Lot 158 of the 7th District, Fayette County, Georgia and being more particularly described as follows:

Commencing at a ½" rebar placed at the northern right-of-way of Wisdom Road and the eastern right of way of State Road 74 and the thence along said eastern right of way line North 78°06'30" East, a distance of 78.02 feet to a point; thence along said right of way along a curve to the right an arc distance of 126.34 feet having a radius of 1885.25 feet being subtended by a chord of North 80°38'37" East a distance of 126.32 feet to a point and THE TRUE POINT OF BEGINNING; thence leaving said right of way North 09°39'51" West, a distance of 343.73 feet to a point; thence North 86°09'27" East, a distance of 20.92 feet to an axle found; thence North 86°09'27" East, a distance of 164.49 feet to a 1-1/2" open top pipe found; thence South 09°21'05" East, a distance of 342.78 feet to an axle found on the northern right of way of Wisdom Road; thence along said northern right of way South 87°53'27" West, a distance of 88.22 feet to a point; thence continuing along said right of way along a curve to the left an arc distance of 95.35 feet having a radius of 1885.25 feet being subtended by a chord of South 84°05'45" West a distance of 95.34 feet to a point an THE TRUE POINT OF BEGINNING. Containing 62,694 square feet or 1.440 Acres.

(b) The above-described tracts are illustrated in the Boundary and Topography Survey prepared by Metro Engineering and Surveying Company, Inc. (dated March 14, 2005), a copy of which is attached hereto as exhibit "A" and incorporated herein by express reference.

It is intended that the OI zoning district be established specifically for a commercial and office complex to be developed substantially in accordance with the following express conditions:

(1005B.2.1) Conformance with master plan. Development shall take place in conformance with the master plan prepared by Summer/Wise & Associates Architects (last revised April 25, 2005), a copy of which is attached hereto as exhibit "B" and incorporated herein by express reference. Any substantive change to this plan or any of the conditions and requirements of this section shall require a new rezoning action.

(1005B.2.2) Permitted uses.

(a) Business, professional, and government office facilities.

(b) Business involving the rendering of a personal service on the premises in establishments having a size of 6,000 square feet or less.

(1005B.2.3) Uses not permitted.

(a) Transportation facility or terminal.

(b) Self-service storage facilities, i.e., mini-warehouses.

(c) Adult bookstores.

(d) Package stores.

(e) Gas stations.

(f) Off-street auto parking facility.

(g) Massage parlors.

(h) Open yard for the sale, rental, and/or storage of materials or equipment, including junk or salvage materials.

(i) Convenience-type stores.

(j) Restaurants or food service establishments.

(k) Bars.

(1005B.2.4) Conditional uses. No conditional uses shall be permitted within this zoning district.

(1005B.2.5) Other requirements.

(a) Maximum building size. The overall area of all commercial and office space shall not exceed 39,000 SF.

(b) Building height. The maximum building height shall not exceed three stories or 60 feet in height from finish grade.

(c) Parking. Parking shall be provided as set forth in Section 909. Dumpsters, loading and service areas shall not be located within any building setbacks and shall be properly screened from view in accordance with current city ordinances.

The owner of the property shall ensure that vehicles parking on the property are limited to those used by employees or visitors of the tenants within the buildings. The entire parking lot shall be posted as "No Parking" after business hours and shall not be used as overflow parking for any of the surrounding businesses.

(d) Landscape buffer. A minimum landscaped buffer of no less than 25' in width shall be provided between this development and the adjoining Fairfield subdivision. All landscaped islands shown in the parking area must be provided. Within this buffer, a combination of meandering berms, fencing and landscaping must be installed to provide a permanent vegetated buffer separating the two properties. The berm must be a minimum of two to three feet in height with a minimum four- to five-foot high privacy fence as shown on the Conceptual Buffer Plan prepared by Peterson Planning (last revised May 27, 2005), a copy of which is attached hereto as exhibit "C" and incorporated herein by express reference.

The purpose of the landscape buffer is to provide a minimum visual screen of ten feet in height from the finish grade of the parking lot at the time of installation. The fence shall be painted or stained a neutral color and shall be maintained by the property owner. A combination of evergreen shrubs and trees shall be installed on both sides of the fence.

The berm and landscaping shall extend beyond the property within the city-owned greenbelt behind the residential lots backing up to Wisdom Road and taper into the existing dense foliage to provide a vegetated buffer in this area.

(e) Curb cuts. The overall development shall be limited to one right-in/right-out curb cut on GA 74. The teardrop island within this entrance must consist of stamped and stained concrete, brick or concrete pavers as opposed to plain concrete. The overall site will be limited to two full-turning entrances from Wisdom Road.

(f) Access drive. The internal access drive interconnecting with the adjoining Dalton West tract shall be designed in such a manner as to allow the free-flow of traffic through this site from Wisdom Road to the adjoining property.

(g) Architectural concept. A unified architectural concept for the overall tract must be developed and approved by the planning commission. The architectural design, building materials and color selections of all buildings and structures on the site must be substantially the same or similar to the schematic elevations as prepared by Summer/Wise & Associates Architects (dated June 2, 2005), a copy of which is attached hereto as exhibit "D" and incorporated herein by express reference.

All sides of each building and structure on the site must include similar architectural detailing, building materials and color selections. Standard wall pack or other security lighting shall not be permitted on the exterior of the buildings unless approved by the planning commission.

(g) Site lighting. A complete site lighting plan, including all lighting proposed on the exterior of the buildings, must be developed and approved by the planning commission. A lighting plan must be submitted which indicates that light from the parking lots, drive aisles, drive-thru and ATM buildings does not leave the property boundaries. The level of illumination within all parking and service areas must not exceed three foot-candles. Lighting underneath the ATM canopy shall comply with current federal regulations.

The level of illumination at all property boundaries must not exceed 0.5 footcandles. Light poles within the parking areas and drive aisles adjacent to the adjoining subdivision must be no higher than 14 feet from finish grade. Additionally, all lights within 50 feet of the rear property boundary must be placed on a timer and turned off no later than 11:00 p.m. each night.

(h) Signage program. Signage shall be provided as set forth within the city's sign ordinance and in accordance with an overall sign program for the tract that shall be approved by the planning commission.

(i) Outdoor speakers. All outdoor speaker systems must be adjusted so that noise from these speakers does not carry onto adjoining properties.

(j) Landscape concept. A complete landscape plan must be developed and approved by the planning commission. The plan must provide for a fully landscaped entrances off of GA 74 and Wisdom Road, including meandering berms and substantial landscaping within the tree save and landscape buffer adjacent to GA 74. Clearing and grading shall be kept to a minimum within the landscaped buffers adjacent to the adjoining subdivision, and these areas must be heavily landscaped with evergreen trees and plant material to assist in providing a visual separation between the proposed development and the adjoining subdivision. All landscaped areas within the site, including the GA 74 and Wisdom Road right-of-ways, must be irrigated.

(k) Utility connections. The property must be connected to the city's sanitary sewer system, and the existing septic systems must be removed. All overhead utility lines that traverse the site must be relocated underground.

(l) Business hours. The business hours of operation for all tenants within both buildings open to the general public, unless a specific business operates by appointments, shall be limited to 6:00 a.m.—9:00 p.m.

(m) Multi-use path connection. A multi-use path connection must be provided to this development and shall be located within the right-of-way on the north side of Wisdom Road and extend from the existing entrance to the Fairfield subdivision to the easternmost entrance to this development. The multi-use path must be located so that berming and landscaping can be provided between the path and the city-owned greenbelt where applicable.

(n) Signal warrant study. The applicant shall fund up to, but not exceeding $9,000.00, to the city for the preparation of a Signal Warrant Study for the GA 74/Wisdom Road intersection. This fee shall be in addition to any funds already spent to prepare traffic studies or signal warrant studies to date.

(o) Application of requirements and conditions. The requirements and conditions specified in this section shall remain in effect unless specifically amended or revoked by subsequent action of city council in accordance with the established procedure for zoning amendments; and, in addition, if it is determined that the property will not be developed in substantially the same manner as depicted on the Summer/Wise & Associates Architects master plan referenced above, and each condition of that plan substantially complied with, the zoning of this property shall automatically revert back to the zoning the property currently holds.

(Ord. No. 848, 6-2-05)

(1005B.3) HomeTech Mortgage, LLC tract:

(a) The property described below shall be rezoned from its present classification of AR Agricultural Reserve to OI Office Institutional. Said property is more particularly described as follows:

All that tract or parcel of land lying and being in Land Lot No. 158 of the 7 th District, Fayette County, Georgia, and more particularly described as follows:

Beginning at a point on the east right-of-way line of State Highway No. 74, which point is located 212.6' southerly from the north Land Lot Line of said Land Lot No. 158 as measured along the easterly right-of-way line of said State Highway No. 74; and from the Point of Beginning thus determined running thence North 86 ½ degrees east a distance of 231.6 feet to an iron pin; running thence south 1 ¼ degrees west a distance of 100 feet to an iron pin; running thence south 86 ½ degrees west to the easterly right-of-way line of State Highway No. 74; running thence northerly along the right-of-way of said highway a distance of 100 feet to the Point of Beginning; less and except any portion of captioned property lying and being within the right-of-way of Georgia Highway 74.

(b) The above-described tract is illustrated in the Boundary and Topography Survey prepared by W.D. Gray and Associates, Inc. (dated January 26, 2006), a copy of which is attached hereto as exhibit "A" and incorporated herein by express reference.

It is intended that the OI zoning district be established specifically for a single office building to be developed substantially in accordance with the following express conditions:

(1005B.3.1) Conformance with master plan. Development shall take place in conformance with the schematic site plan prepared by Lorber & Associates, Inc., a copy of which is attached hereto as exhibit "B" and incorporated herein by express reference. Any substantive change to this plan or any of the conditions and requirements of this section shall require a new rezoning action.

(1005B.3.2) Permitted uses.

(a) Business, professional, and government office facilities.

(b) Business involving the rendering of a personal service on the premises in establishments having a size of 6,000 square feet or less.

(1005B.3.3) Uses not permitted.

(a) Transportation facility or terminal.

(b) Self-service storage facilities, i.e., mini-warehouses.

(c) Adult bookstores.

(d) Package stores.

(e) Gas stations.

(f) Off-street auto parking facility.

(g) Massage parlors.

(h) Open yard for the sale, rental, and/or storage of materials or equipment, including junk or salvage materials.

(i) Convenience-type stores.

(j) Restaurants or food service establishments.

(k) Bars.

(1005B.3.4) Conditional uses. No conditional uses shall be permitted within this zoning district.

(1005B.3.5) Other requirements.

(a) Maximum building size. The overall area of the office building shall not exceed 4,000 s.f.

(b) Building height. The maximum building height shall not exceed one story in height.

(c) Parking. Parking shall be provided as set forth in Section 909. Dumpsters, loading and service areas shall not be located within any building setbacks and shall be properly screened from view in accordance with current city ordinances.

(d) Curb cuts. The overall development shall be limited to one right-in/right-out curb cut on GA 74 with appropriate turning lanes as approved by GDOT. The teardrop island within this entrance must consist of stamped and/or stained concrete, brick or concrete pavers as opposed to plain concrete.

(e) Interparcel access. Interparcel access should be provided between this development and the adjoining Campanile's Home Furnishings tract to the north.

(f) Architectural concept. The architectural design and exterior building materials of the proposed building must be compatible with the surrounding developments. All sides of the building must include architectural detailing and similar building materials. Additionally, no wall-packs or other external security lighting sources will be permitted on the building.

(g) Site lighting. A complete site lighting plan, including all lighting proposed on the exterior of the buildings, must be developed and approved by the planning commission. All lighting within the parking lot shall be limited to 250-watt high-pressure sodium fixtures with a maximum pole height of 30 feet from finish grade to the top of the pole. The level of illumination within the parking area must not exceed three foot-candles

(h) Signage program. Signage shall be provided as set forth within the city's sign ordinance and in accordance with an overall sign program for the tract that shall be approved by the planning commission. The property shall be limited to one monument sign; one wall sign facing SR 74 identifying the name of the main tenant within the building; and no window signs or other individual tenant signage outside of the building.

(i) Landscape concept. A complete landscape plan must be developed and approved by the planning commission. The plan must provide for a fully landscaped entrance off of GA 74, including meandering berms and substantial landscaping within the tree save and landscape buffer adjacent to GA 74 to screen views to the parking lot. All landscaped areas within the site, including the GA 74 right-of-way, must be irrigated.

(j) Utility connections. The property must be connected to the city's sanitary sewer system, and the existing septic systems must be removed. All overhead utility lines that traverse the site must be relocated underground.

(k) Application of requirements and conditions. The requirements and conditions specified in this section shall remain in effect unless specifically amended or revoked by subsequent action of city council in accordance with the established procedure for zoning amendments; and, in addition, if it is determined that the property will not be developed in substantially the same manner as depicted on the Lorber & Associates schematic site plan referenced above, and each condition of that plan substantially complied with, the zoning of this property shall automatically revert back to the zoning the property currently holds.

(Ord. No. 886, 6-15-2006)

(1005B.4) Peeples Lake tract.

(a) A single tract of land described below shall be rezoned from its present zoning classification of O-I Office Institutional (Fayette County) to OI Office Institutional (Peachtree City). Said property is more particularly described as follows:

All that tract or parcel of land lying and being in Land Lot 18 of the 6th Land District of Fayette County, Georgia, and being more particularly described as follows:

Begin at a 1" open topped pipe marking the intersection of the northerly right-of-way of State Route 74 and the westerly Land Lot Line of Land Lot 18 also being the easterly property line of The Fayette County Animal Shelter Property; Thence North 00°32'24" East for a distance of 309.94 feet to a 1" open topped pipe; Thence North 00°26'34" West for a distance of 238.06 feet to a point; Thence South 88°22'43" East for a distance of 549.08 feet to a point; Thence South 01°36'53" West for a distance of 200.11 feet to a point; Thence South 88°23'06" East for a distance of 900.43 feet to a point; on the westerly right-of-way of Redwine Road, said right-of-way is 80 feet at this point; Thence South 11°35'40" East for a distance of 201.77 feet to a transitional right-of-way between Redwine Road and the northerly right-of-way of State Route 74; Thence along the transitional right-of way the following bearing and distances, South 01°34'50" West for a distance of 78.75 feet to a point; Thence South 12°23'16" West for a distance of 33.26 feet to a point; Thence South 56°11'01" West for a distance of 43.29 feet to a point on the northerly right-of-way of State Route 74; THENCE along said right-of-way of State Route 74 the following calls: along a curve to the left having a radius of 1237.54 feet and an arc length of 76.51 feet, being subtended by a chord of North 81°36'51" West, for a distance of 76.50 feet to a point; THENCE along a curve to the left having a radius of 12001.54 feet and an arc length of 153.93 feet, being subtended by a chord of North 85°31'56" West, for a distance of 153.93 feet to a point; THENCE along a curve to the left having a radius of 5330.60 feet and an arc length of 676.05 feet, being subtended by a chord of North 86°56'01" West, for a distance of 675.60 feet to a point; THENCE along a curve to the left having a radius of 5330.60 feet and an arc length of 477.00 feet, being subtended by a chord of South 86°53'14" West, for a distance of 476.84 feet to a point; THENCE along a curve to the left having a radius of 5330.60 feet and an arc length of 60.20 feet, being subtended by a chord of South 82°52'03" West, for a distance of 60.20 feet to the Point of Beginning; Together with and subject to covenants, easements, and restrictions of record.

Said property contains 13.0 acres.

(b) This tract is illustrated on the Boundary and Topography Survey prepared by Integrated Science and Engineering (dated August 8, 2006), a copy of which is attached hereto as exhibit "A" and incorporated herein by express reference.

It is intended that the OI zoning district be established specifically for a medical and professional office complex to be developed substantially in accordance with the following express conditions:

(1005B.4.1) Conformance with master plan.

Development shall take place in conformance with the master plan prepared by Group VI Corporation (last revised October 18, 2006), a copy of which is attached hereto as Exhibit "B" and incorporated herein by express reference. Any substantive change to this plan or any of the conditions and requirements of this section shall require a new rezoning action.

(1005B.4.2) Permitted uses.

(a) Business, professional, and government office facilities.

(b) Business involving the rendering of a personal service on the premises in establishments having a size of 6,000 square feet or less.

(c) Indoor commercial recreation facility.

(d) Social, civic or professional club.

(e) School, college or university.

(1005B.4.3) Uses not permitted.

(a) Transportation facility or terminal.

(b) Self-service storage facilities, i.e., mini-warehouses.

(c) Adult bookstores.

(d) Package stores.

(e) Gas stations.

(f) Off-street auto parking facility.

(g) Massage parlors.

(h) Open yard for the sale, rental, and/or storage of materials or equipment, including junk or salvage materials.

(i) Convenience-type stores.

(j) Restaurants or food service establishments.

(k) Bars.

(1005B.4.4) Conditional uses.

No conditional uses shall be permitted within this zoning district.

(1005B.4.5) Other requirements.

(a) Maximum building size. The gross square footage of all buildings shall not exceed 110,000 SF.

(b) Setbacks. All impervious surfaces shall be located no less than forty (40) feet from SR 74 and no less than thirty (30) feet from Redwine Road.

The minimum front building setbacks adjacent to SR 74 and Redwine Road shall be no less than forty (40) feet.

The minimum side setback shall be no less than ten (10) feet. Where the subject tract adjoins a residentially-zoned property, the minimum building setback shall be no less than seventy-five (75) feet.

The minimum rear setback shall be no less than 25'. Where the subject tract adjoins a residentially-zoned property, the minimum building setback shall be no less than seventy-five (75) feet, except on Parcel "A", where the minimum building setback shall be no les than thirty (30) feet.

(c) Building height. The maximum building height shall not exceed sixty (60) feet in height from finish grade to the top of the building.

(d) Parking. Parking shall be provided as set forth in Section 909. Dumpsters, loading and service areas shall not be located within any building setbacks and shall be properly screened from view in accordance with current ordinances.

Parking and/or access drives shall be located no closer than thirty (30) feet from any residentially-zoned property.

(d) Landscape buffer. Landscaped buffers shall be provided between the development on this site and the adjoining residentially-zoned property and along SR 74 and Redwine Road. Within these buffers, a combination of meandering berms and evergreen plant material must be installed to provide a permanent vegetative buffer. The berms must be a minimum of four (4) feet in height with 4:1 slopes.

The landscape buffer adjacent to SR 74 shall be no less than forty (40) feet in width, as measured from the right-of-way.

The landscape buffer adjacent to Redwine Road shall be no less than thirty (30) feet in width, as measured from the right-of-way.

The landscape buffer adjacent to residentially-zoned property shall be no less than thirty (30) feet in width, as measured from the property line.

(e) Curb cuts. The overall development shall be limited to one existing full-turning and one future right-in/right-out curb cut on SR 74 as well as one future full-turning curb cut on Redwine Road. All future curb cuts shall consist of stamped and stained concrete, brick or concrete pavers as opposed to plain concrete.

(f) Architectural concept. A unified architectural concept for the overall tract must be developed and approved by the Planning Commission. The architectural design, building materials and color selections of all buildings and structures on the site must be substantially the same or similar to the rendering of the Starr's Mill Professional Center building as provided by Group VI Corporation (dated October 9, 2008), a copy of which is attached hereto as Exhibit "C" and incorporated herein by express reference.

All sides of each building and structure on the site must include similar architectural detailing, building materials and color selections. Standard wall pack or other security lighting on the exterior of the buildings shall be limited to full cutoff fixtures.

(g) Site lighting. A complete site lighting plan, including all lighting proposed on the exterior of the buildings, must be developed and approved by the Planning Commission. All site lighting must include high-pressure sodium fixtures. A lighting plan must be submitted which indicates that light from the parking lots and drive aisles does not leave the property boundaries. The average level of illumination within all parking and service areas must not exceed 3 foot-candles. Flood and/or spot lights attached to the light poles used to illuminate the site or the buildings shall not be permitted.

The level of illumination at all property boundaries must not exceed 0.5 footcandles.

(h) Signage program. Signage shall be provided as set forth within the City's Sign Ordinance and in accordance with an overall sign program for the tract that shall be approved by the Planning Commission.

(i) Outdoor speakers. Outdoor speakers shall not be permitted.

(j) Landscape concept. A complete landscape plan must be developed and approved by the Planning Commission. The plan must provide for fully landscaped entrances off of GA 74 and Redwine Road, including meandering berms and substantial landscaping within the tree save and landscape buffers adjacent to both roads.

All required landscaping shall be maintained in a horticulturally healthy an aesthetically pleasing manner. All planting beds and lawn areas should include an underground irrigation system with a programmable timer and operational rain shut-off device. If an underground irrigation system is not available, all planting areas shall be no more than one hundred (100) feet from a watering source and assurances shall be furnished to the city landscape architect that water will be available and appropriate watering shall take place.

(k) Utility connections. The property must be connected to the City's sanitary sewer system, and the existing septic systems must be removed upon development of that portion of the overall site.

To the greatest extent practicable, all overhead utility lines that traverse the site, except for high voltage transmission lines, shall be relocated underground or removed from the site.

(l) Business hours. The business hours of operation for all tenants within all buildings open to the general public, unless a specific business operates by appointments, shall be limited to 6:00 a.m.—9:00 p.m.

(m) Multi-use path connection. A multi-use path connection must be provided to this development and shall be located within the GDOT right-of-way and/or on city-owned property on the north side of SR 74. The multi-use path shall be constructed as each portion of the site is developed and shall be incorporated into the berming and landscaping adjacent to SR 74 and Redwine Road.

(n) Change in use of adjoining property. All buffers and setbacks adjoining existing residentially-zoned property that require additional depth or width because of the adjoining zoning designation, shall be automatically reduced to standard widths, as described within this ordinance, upon the changing of zoning designations of those residential properties.

(o) Application of requirements and conditions. The requirements and conditions specified in this section shall remain in effect unless specifically amended or revoked by subsequent action of City Council in accordance with the established procedure for zoning amendments.

(Ord. No. 893, 11-2-2006)

(1005B.5) Southern Pines tract.

(a) Two tracts of land as described below shall be rezoned from their current zoning classification of C-C Community Commercial and O-I Office Institutional (unincorporated Fayette County) to OI Office Institutional (Peachtree City). Said parcels are more particularly described as follows:

Parcel 1

All that tract or parcel of land lying and being in land Lot 18 of the 6th District, Fayette County, and being more particularly described as follows:

COMMENCE at the point of intersection of the southerly right-of-way line of State Highway #74 (right-of-way varies) with the westerly land lot line of Land Lot 18; Thence along said right-of-way North 85 degrees 30 minutes 07 seconds East for a distance of 119.87 feet to a point; Thence along a curve to the right having a radius of 5925.00 feet and an arc length of 278.29 feet, being subtended by a chord of North 86 degrees 50 minutes 51 seconds East for a distance of 278.27 feet to a point; Thence South 01 degrees 48 minutes 25 seconds East for a distance of 81.00 feet to a point; Thence along a curve to the right having a radius of 5844.00 feet and an arc length of 97.40 feet, being subtended by a chord of North 88 degrees 40 minutes 14 seconds East for a distance of 97.40 feet to a point; Thence North 00 degrees 51 minutes 07 seconds West for a distance of 81.00 feet to a point; Thence along a curve to the right having a radius of 5925.00 feet and an arc length of 842.31 feet, being subtended by a chord of South 86 degrees 46 minutes 45 seconds East for a distance of 841.60 feet to a point; Thence along a curve to the right having a radius of 1289.00 feet and an arc length of 42.56 feet, being subtended by a chord of South 81 degrees 45 minutes 39 seconds East for a distance of 42.56 feet to a point; Thence South 33 degrees 40 minutes 08 seconds East for a distance of 69.43 feet to a point; Thence South 77 degrees 03 minutes 20 seconds East for a distance of 4.06 feet to a point; Thence leaving said right-of-way, South 12 degrees 56 minutes 40 seconds West for a distance of 9.90 feet to the POINT OF BEGINNING; Thence South 12 degrees 56 minutes 40 seconds West, a distance of 161.54 feet; Thence along a curve to the right having a radius of 420.00 feet and arc length of 260.23 feet, being subtended by a chord of South 30 degrees 41 minutes 40 seconds West for a distance of 256.09 feet; Thence North 29 degrees 54 minutes 15 seconds West, a distance of 136.35 feet; Thence North 62 degrees 39 minutes 26 seconds West, a distance of 184.20 feet; Thence along a curve to the left, having a radius of 50.00 feet and an arc length of 99.02 feet, being subtended by a chord of North 29 degrees 23 minutes 29 seconds West for a distance of 83.61 feet; Thence North 03 degrees 52 minutes 27 seconds East, a distance of 150.70 feet; Thence along a curve to the right, having a radius of 5,865.00 feet and an arc length of 341.09 feet, being subtended by a chord of South 84 degrees 22 minutes 22 seconds East for a distance of 341.04 feet to a point; Thence along a curve to the right, having a radius of 1,229.00 feet and an arc length of 91.21 feet, being subtended by a chord of South 80 degrees 34 minutes 50 seconds East for a distance of 91.19 feet to the POINT OF BEGINNING.

Containing 2.63 acres, more or less.

Parcel 2

All that tract or parcel of land lying and being in land Lot 18 of the 6th District, Fayette County, and being more particularly described as follows:

COMMENCE at the point of intersection of the southerly right-of-way line of State Highway #74 (right-of-way varies) with the westerly land lot line of Land Lot 18; Thence along said right-of-way North 85 degrees 30 minutes 07 seconds East for a distance of 119.87 feet to a point; Thence along a curve to the right having a radius of 5925.00 feet and an arc length of 278.29 feet, being subtended by a chord of North 86 degrees 50 minutes 51 seconds East for a distance of 278.27 feet to a point; Thence South 01 degrees 48 minutes 25 seconds East for a distance of 81.00 feet to a point; Thence along a curve to the right having a radius of 5844.00 feet and an arc length of 97.40 feet, being subtended by a chord of North 88 degrees 40 minutes 14 seconds East for a distance of 97.40 feet to a point; Thence North 00 degrees 51 minutes 07 seconds West for a distance of 81.00 feet to a point; Thence along a curve to the right having a radius of 5925.00 feet and an arc length of 842.31 feet, being subtended by a chord of South 86 degrees 46 minutes 45 seconds East for a distance of 841.60 feet to a point; Thence along a curve to the right having a radius of 1289.00 feet and an arc length of 42.56 feet, being subtended by a chord of South 81 degrees 45 minutes 39 seconds East for a distance of 42.56 feet to a point; Thence South 33 degrees 40 minutes 08 seconds East for a distance of 69.43 feet to a point; Thence South 77 degrees 03 minutes 20 seconds East for a distance of 64.06 feet to a point; Thence leaving said right-of-way, South 12 degrees 56 minutes 40 seconds West for a distance of 9.90 feet to the POINT OF BEGINNING; Thence along a curve to the right, having a radius of 1229.00 feet and an arc length of 244.74 feet, being subtended by a chord of South 69 degrees 57 minutes 07 seconds East for a distance of 244.34 feet; Thence South 26 degrees 08 minutes 45 seconds West, a distance of 24.42 feet; Thence North 89 degrees 14 minutes 54 seconds West, a distance of 59.97 feet; Thence South 00 degrees 43 minutes 14 seconds West, a distance of 253.05 feet; Thence North 72 degrees 39 minutes 26 seconds West, a distance of 251.43 feet; Thence along a curve to the left, having a radius of 480.00 feet and an arc length of 134.92 feet, being subtended by a chord of North 20 degrees 59 minutes 49 seconds East for a distance of 134.48 feet; Thence North 12 degrees 56 minutes 40 seconds East, a distance of 161.54 feet to the POINT OF BEGINNING.

Containing 1.43 acres, more or less.

(b) These tracts are illustrated on the Plan of Annexation and Zoning for The Gates, prepared by Integrated Science and Engineering (dated October 24, 2012), a copy of which is attached hereto as Exhibit "A" and incorporated herein by express reference.

It is intended that the OI zoning district be established specifically for the development of no more than one professional office building and associated parking on each tract of land, to be developed substantially in accordance with the following express conditions:

(1005B.5.1) Conformance with master plan.

Development shall take place substantially in conformance with the concept plan for The Gates prepared by Integrated Science and Engineering (last revised September 24, 2012), a copy of which is attached hereto as Exhibit "B" and incorporated herein by express reference. Any substantive change to this plan or any of the conditions and requirements of this section shall require a new rezoning action.

(1005B.5.2) Permitted uses.

1. Business, professional and government office facilities.

2. Business involving the rendering of a personal service on the premises in establishments having a size of 6,000 square feet or less.

3. Accessory uses (see Section 908).

(1005B.5.3) Uses not permitted.

1. Transportation facility or terminal.

2. Self-service storage facilities, i.e., mini-warehouses.

3. Adult bookstores.

4. Package stores.

5. Gas stations.

6. Off-street auto parking facility.

7. Massage parlors.

8. Open yard for the sale, rental, and/or storage of materials or equipment, including junk or salvage materials.

9. Convenience-type stores.

10. Restaurants or food service establishments.

11. Bars.

(1005B.5.4) Conditional uses.

No conditional uses shall be permitted within this zoning district.

(1005B.5.5) Other requirements.

1. Maximum building size: The combined gross square footage of both buildings shall not exceed 20,000 SF in size.

2. Building setbacks:

(a) Front: 40 feet; provided there is no automobile parking or drop-off area located between the building and the internal street.

(b) Side: Ten feet.

(c) Rear: 20 feet.

3. Maximum building height: The maximum building height shall not exceed two stories in height or 35 feet in height from finish grade to the ridge line of the roof.

4. Parking: Parking shall be provided as set forth in Section 909 and shall be located so as not to be visible from the internal road as you enter the development from SR 74.

The owner of the property shall ensure that vehicles parking on the property are limited to those used by employees or visitors of the tenants within the buildings. The entire parking lot shall be posted as "No Parking" after business hours and shall not be used as overflow parking for any of the surrounding businesses.

5. Curb cuts: There shall be no more than one access drive into each office tract from the entrance road. No access to these tracts shall be provided from SR 74. The access drives should align and be approved by the city engineer in respect to design and sight distance as a part of the concept plat process.

6. Transition yard: A transition yard, as defined within the city zoning ordinance, shall be provided between the office development and the adjoining residential lots as shown on the approved concept plan.

7. Architectural concept: A unified architectural concept for the overall office component shall be submitted to and approved by the planning commission. The architectural design, building materials and color selections shall be residential in character to complement the homes within the subdivision.

All sides of the office buildings and associated structures shall include similar architectural detailing, building materials and color selections.

8. Storage: No storage shall be permitted on the zoning lot outside of a fully enclosed building.

Dumpsters, loading and service areas shall not be located within any building setback and shall be properly screened from view in accordance with current city ordinances.

9. Business hours: The business hours of operation for all tenants within both buildings open to the general public, unless a specific business operates by appointments, shall be limited to 6:00 a.m.—9:00 p.m.

(Ord. No. 1049, § 1, 10-18-2012)

(1005B.6) Foot Pain, LLC tracts.

(a) Four tracts of land as described below shall be rezoned from their current zoning classification of C-C Community Commercial and O-I Office Institutional (unincorporated Fayette County) to OI Office Institutional (Peachtree City).

These parcels are more particularly described as follows:

Tract 1—Peachtree Professional tract.

All that tract or parcel of land lying and being in Land Lot 69 of the 7th District, Fayette County, Georgia, and being more particularly described as follows:

Beginning at the intersection of the westerly right-of-way of Georgia State highway 54 and the north line of Land Lot 6 then southwesterly along the westerly right-of-way 610.74 feet to a ½" rebar found; thence south 89 degrees 47 minutes 02 seconds a distance of 6.65 feet to a ½" rebar set on the ROW of Georgia State Highway 54 and the true POINT OF BEGINNING; thence along said right-of-way south 23 degrees 01 minutes 42 seconds west a distance of 178.99 feet to a ½" rebar set; thence continue along said right-of-way south 67 degrees 24 minutes 14 seconds east a distance of 7.48 feet to a ½" rebar found. Thence continue along said right-of-way south 22 degrees 35 minutes 46 seconds west a distance of 72.08 feet to a point; thence continue along said right-of-way south 23 degrees 47 minutes 09 seconds west a distance of 45.00 feet to a ½ rebar set; thence continue along said right-of-way north 66 degrees 16 minutes 53 seconds west a distance of 9.09 feet to a ½" rebar set; thence continue along said right-of-way 23 degrees 03 minutes 04 seconds west a distance of 15.95 feet to a ½ rebar set; thence continue along said right-of-way south 68 degrees, 02 minutes 56 seconds east a distance of 8.93 feet to a concrete right-of-way monument found; thence continue along said right-of-way south 68 degrees 02 minutes 56 seconds east a distance of 108.27 feet to a 5/8" rebar found; thence leaving said right-of-way north 88 degrees 37 minutes 57 seconds west a distance of 325.98 feet to a ½" rebar set on the west land lot line of Land Lot 69 and the easterly right-of-way line of Sumner Road (50' right-of-way) said land lot line and right-of-way line also being the dividing line between Fayette County and the City of Peachtree City; thence along said land lot line and right-of-way north 01 degrees 09 minutes 46 seconds a distance of 380.31 feet to a ½: rebar set; thence continue along said land lot and right-of-way line north 00 degrees 15 minutes 53 seconds east a distance of 149.98 feet to a ½" rebar found; thence leaving said land lot line and right-of-way line north 89 degrees 50 minutes 01 seconds east a distance of 239.31 feet to a ½" rebar found; thence south 00 degrees 07 minutes 24 seconds east a distance of 149.90 feet to a ½" rebar found; thence north 89 degrees 47 minutes 02 seconds east a distance of 234.61 feet to a ½" rebar set on the westerly right-of-way of Georgia State Highway 54 and the true POINT OF BEGINNING; said tract containing 4.36 acres more or less and being shown on an ALTA/ASCM Land Title Survey prepared for Foot Pain, LLC, United Community Bank, and Chicago Title Insurance Company by W.D. Gray and Associates, Inc. dated September 5, 2012.

Said tract is depicted in Exhibit "A".

Tract 2—Paper Rose Studio tract.

ALL THAT TRACT or parcel of land lying and being in Land Lot 69 of the 7th District of Fayette County, Georgia, being more particularly described as follows:

Beginning at a point located on the west line of Land Lot 69, which point is located 1,958.7 feet north of the southwest corner of said land lot, as measured along said land lot line, running thence north 00 degrees 14 minutes east 144.6 feet to a point; running thence south 89 degrees 54 minutes east 346.5 feet to a point located on the existing right-of-way of Georgia State Highway 54 (having an 80-foot right-of-way at the time of preparation of said survey); running thence southwesterly along said right-of-way 156.1 feet to a point; running thence north 89 degrees 54 minute west 288.3 feet to the Point of Beginning; said parcel having a two-story frame residential dwelling located thereon; as per plat of survey prepared by Koons Wood & Associates for McCurdy, Wilcox & Reeves, dates May 21, 1986, revised November 25, 1987.

There is excepted from the afore-described parcel that portion of the said property lying within the bounds and limits of Georgia State Highway 54.

Said tract is depicted in Exhibit "B".

Tract 3—Peachtree City Chiropractic tract.

All that certain tract or parcel of land lying and being in Land Lot 69 of the 7th Land District of Fayette County, Georgia, being more particularly described as follows:

To locate the true POINT OF BEGINNING, commence at the point of intersection of Land Lot 68, Land Lot 69, Land Lot 92, and Land Lot 93 of the 7th Land District; run thence in a northerly direction along the common land lot line of Land Lot 69 and Land Lot 92 a distance of 1,777.7 feet to a point; said point being the TRUE POINT OF BEGINNING; running thence along said common land lot line north 0 degrees 15 minutes 06 seconds east a distance of 180.52 feet to a point; running thence leaving said common land lot line south 89 degrees 59 minutes 35 seconds east a distance of 270.38 feet to the westerly right-of-way of Georgia State Highway 54 (right-of-way varies); running thence along said right-of-way south 22 degrees 21 minutes 49 seconds west a distance of 201.03 feet to a point; running thence leaving said right-of-way north 88 degrees 24 minutes 19 seconds west a distance of 194.76 feet to a point located on the common land lot line of Land Lot 69 and Land Lot 92, said point being the TRUE POINT OF BEGINNING; said tract containing approximately 0.980 acres, as shown on that certain as-built survey prepared for Dr. John R. Justice, by Welborn Land Surveying, Inc., Mark R. Welborn, G.R.L.S., Certificate No. 2711, dated September 26, 2002.

Said tract is depicted in Exhibit "C".

Tract 4—Paletta Group tract.

All that tract or parcel of land lying and being in Land Lot 69 of the 7th District of Fayette County, Georgia and being more particularly described as follows:

Beginning at a point located at the intersection of the northerly right-of-way of Sumner Road with the northwesterly right-of-way of Georgia State Highway 54; thence running northeasterly along the northwesterly right-of-way of Georgia State Highway 54 a distance of 88.60 feet to an iron pin set and the TRUE POINT OF BEGINNING; thence running south 88 degrees 41 minutes 22 seconds west a distance of 75.95 feet to a point located on the westerly right-of-way of Sumner Road; thence running north 00 degrees 38 minutes 38 seconds west along the said westerly right-of-way of Sumner Road a distance of 30.79 feet to a ROW monument found; thence running north 01 degrees 08 minutes 08 seconds east along the said westerly right-of-way of Sumner Road a distance of 284.22 feet to an iron pin found; thence departing said right-of-way and running south 88 degrees 24 minutes 19 seconds east a distance of 200.55 feel to an iron pin set on the northwesterly right-of-way of Georgia State Highway 54; thence running south 24 degrees 14 minutes 46 seconds west along the said northwesterly right-of-way of Georgia State Highway 54 a distance of 131.49 feet to a ROW monument found; thence running south 24 degrees 14 minutes 45 seconds west along the said northwesterly right-of-way of Georgia State Highway 54 a distance of 138.14 feet to a ROW monument found; thence running south 17 degrees 12 minutes 06 seconds west along the said northwesterly right-of-way of Georgia State Highway 54 a distance of 64.69 feet to an iron pin set and the true POINT OF BEGINNING; said tract containing 0.969 acres.

Said tract is depicted in Exhibit "D".

It is intended that the OI zoning district be established specifically for medical and/or professional office buildings and associated ancillary uses as identified herein, and that future buildings be developed substantially in accordance with the following express conditions:

(1005B.6.1) Permitted uses.

1. Business and professional offices, including medical, dental, legal, financial, architectural, engineering, real estate, insurance and manufacturer representatives, provided no goods are offered for sale on the premises.

2. Business involving the rendering of a personal service on the premises in establishments having a size of 6,000 square feet or less.

3. Non-commercial club or lodges.

4. Funeral home.

5. Publicly owned building, facility or land.

6. Building, facility or land for the distribution of utility services.

7. Research/testing facilities and professional laboratories.

8. Banks and financial institutions with drive-thru or automated teller machines.

9. Educational institutions, including colleges and universities, business schools, trade schools, professional schools and technical schools.

10. Accessory uses (see Section 908).

11. Indoor, sit-down restaurants with not more than 60 seats, provided that no drive-thru or drive-in facilities are permitted.

(Ord. No. 1193, § 1, 7-15-2021)

(1005B.6.2) Conditional uses.

No conditional uses shall be permitted.

(1005B.6.3) Other requirements.

(a) Multiple frontage lot: Because the subject tracts abut both SR 54 and Sumner Road, they are considered multiple frontage lots and, therefore, front building and parking setbacks shall be established adjoining the right-of-way of both public streets.

(b) Setbacks: All impervious surfaces, including buildings, parking, stormwater detention facilities, etc., shall be located no less than 40 feet from the right-of-way of SR 54 and no less than 50 feet from the right-of-way of Sumner Road.

The minimum side building setbacks shall be no less than ten feet.

The minimum rear building setback shall be no less than 20 feet.

(c) Maximum building height: The maximum building height shall not exceed two stories in height or 35 feet in height from finish grade to the ridge line of the roof.

(d) Parking: Parking shall be provided as set forth in Section 909. No automobile parking shall be permitted within the established front building setbacks.

(e) Curb cuts: There shall be no vehicular access from these tracts of land to or from Sumner Road.

(f) Architectural detailing: All sides of the buildings and associated structures shall include similar architectural detailing, building materials and color selections.

(g) Storage: No storage shall be permitted on the zoning lot outside of a fully enclosed building.

(h) [Dumpsters, loading and service areas:] Dumpsters, loading and service areas shall not be located within any building setback and shall be properly screened from view in accordance with current city ordinances.

(i) Site lighting: All site lighting, including all fixtures mounted on the exterior of the buildings, shall comply with the city's lighting ordinance.

(j) Sumner Road undisturbed buffer: An undisturbed buffer of no less than 25 feet in width as measured from the right-of-way of Sumner Road shall be preserved on each tract of land and shall be designated on the plat of the overall property. Other than perpendicular utility crossings, clearing, grading or the removal of any vegetation from these buffers shall not be permitted. In those areas void of vegetation, the buffer shall be re-established with evergreen plant material (minimum six feet in height from finish grade) planted in staggered rows at no less than eight feet on center.

(k) Multi-use path connection: The applicant shall coordinate with city staff to identify a location for an at-grade multi-use path crossing on Sumner Road and shall then be responsible for constructing a multi-use path from the SR 54/Sumner Road intersection to the northernmost property line of the Peachtree Professional Center tract. A detailed plan shall be prepared in accordance with city standards and submitted to city staff for review prior to construction. The applicant shall be solely responsible for design and construction of this connection at no cost to the city. It is understood the multi-use path shall not impact the existing buffer adjacent to Sumner Road.

(l) Landscaping enhancements: The applicant shall prepare a detailed analysis of landscaping requirements as they relate to Fayette County in comparison to those required by Peachtree City. Should additional plant material be required to satisfy the city's tree replacement requirements, the applicant shall prepare a landscape plan identifying how the existing landscaping will be enhanced to comply with Peachtree City requirements.

It is understood this requirement shall apply to the Peachtree Professional building tract only. Landscaping requirements on the remaining tracts will be analyzed as these tracts are either expanded or redeveloped in the future.

(m) Non-conforming issues: Upon approval of the annexation, existing conditions on each tract of land, to include parking design, landscaping, signage, lighting, etc., that do not comply with current city ordinances shall be considered legally non-conforming. Should these improvements be modified and/or if the property is redeveloped, these items shall be brought into conformance with city ordinances to the greatest extent practicable.

Exhibit "A"

Exhibit "B"

Exhibit "C"

Exhibit "D"

(Ord. No. 1066, § 1, 6-6-2013)

(1005B.7) Starr's Mill Academy Pre-School and Childcare Center, Inc. Tract.

(a) A single tract of land as described below shall be rezoned from its present zoning designation of A-R Agricultural Residential (unincorporated Fayette County) to OI Office Institutional (Peachtree City). Said property is more particularly described as follows:

All that tract or parcel of land lying and being in Land Lot 18 of the 6th District, Fayette County, Georgia, and being more particularly described as follows:

To find the true point of beginning, commence at a point located at the intersection of the southwesterly right of way line of State Highway #74 (100′ R/W) and the northwesterly right of way line of Brechin Drive (60′ R/W); thence run in a northwesterly direction along the southwesterly right of way line of State Highway #74 a distance of 576.13 feet to an iron pin found; said iron pin is the point of beginning; thence from the point of beginning and leaving said right of way of State Highway #74 and running north 89 degrees 52 minutes 04 seconds west a distance of 606.67 feet to a 1″ Solid Rod; thence south 89 degrees 44 minutes 53 seconds west a distance of 248.58 feet to an iron pin found; thence north 00 degrees 01 minutes 33 seconds east a distance of 550.01 feet to an iron pin found; thence south 89 degrees 56 minutes 18 seconds east a distance of 337.46 feet to an iron pin found at the southwesterly right of way line of State Highway #74; thence along the southwesterly right of way line of State Highway #74 and along the arc of a curve having a radius of 1,490.91 feet (said arc being subtended by a chord having a bearing of south 46 degrees 52 minutes 07 seconds east and a chord length of 212.37 feet) a distance of 212.55 feet to a point; thence continuing along said right of way line and along the arc of a curve having radius of 16,689.81 feet (said arc being subtended by a chord having a bearing of South 41 degrees 51 minutes 06 seconds east and a chord length of 543.40 feet) a distance of 543.42 feet to the point of beginning. Said tract of land contains 333,776 square feet as shown on plat of survey prepared by Solar Land Surveying Company dated September 28, 2002, certified by John W. Stanzillis, Jr., G.R.L.S. No. 2109.

LESS AND EXCEPT that property condemned by the Department of Transportation in Condemnation case styled Department of Transportation vs. 1.0 acres of land, et al., Docket No. 2008V-0921CE, in the Superior Court of Fayette County, Georgia, Order and Judgment dated June 9, 2008, filed June 9, 2008, recorded in Deed Book 3408, Page 355, Fayette County, Georgia records.

(b) This tract is illustrated on the attached Exhibit "A" and incorporated herein by express reference.

It is intended that the OI zoning district be established in accordance with the following express conditions:

(1005B.7.1) Conditions.

1. The Applicant shall be solely responsible for constructing a multi-use path connection from The Gates subdivision to their existing parking lot in a location deemed acceptable by the City Engineer. The path shall be designed and constructed in accordance with the city's multi-use path design standards.

2. The existing signage on the tract will be improved to city standards.

3. The zoning designation of the subject tract shall be OI Office Institutional.

4. The Land Use Designation of the subject tract shall be OFF Office.

(c) Permitted uses.

(a) Use permitted for this tract shall those permitted under the OI zoning district.

Exhibit "A"

(Ord. No. 1111(OI), § 1, 5-5-2016)

(1005B.8) Terry Business Park. The subdivision known as the Terry Business Park shall be zoned O-I Office Institutional, to include the following properties: 100, 105, 110, 115, 120, and 130 Genevieve Court.

(Ord. No. 1196-A, § 1, 10-7-2021)

(1005B.9) The property located at 1920 State Route 54 W shall be zoned to O-I Office Institutional.

History

The history line the source prints at the end of the section.

(Ord. No. 1196-A, § 1, 10-7-2021)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:peachtree-city/zoning/1005b@2026-11-14-7259a6c73e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Peachtree City Zoning Ordinance, Sec. 1005B. Property rezoned to OI | Georgia Commons