--- title: Peachtree City Zoning Ordinance, Sec. 1114. Landscape plan approval process collection: local-codes id: local-code:peachtree-city/zoning/1114 cite_as: Peachtree City, Ga., Zoning Ordinance § 1114 canonical_url: https://georgiacommons.org/code/local/peachtree-city/zoning/1114 md_url: https://georgiacommons.org/code/local/peachtree-city/zoning/1114.md text_url: https://georgiacommons.org/code/local/peachtree-city/zoning/1114/text source_url: https://library.municode.com/ga/peachtree_city/codes/code_of_ordinances date: 2026-11-14 status: active jurisdiction: city:peachtree-city jurisdiction_name: Peachtree City place_fips: "1359724" corpus_version: local-codes-peachtree-city-0a3741f04819 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/peachtree-city/zoning/~appendix-b/~article-xi/~division-3.md previous: https://georgiacommons.org/code/local/peachtree-city/zoning/1113.md next: https://georgiacommons.org/code/local/peachtree-city/zoning/1114.5.md index: https://georgiacommons.org/code/local/peachtree-city.md branch: zoning edition: As published by Municode, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:peachtree-city/zoning/1114@2026-11-14-b1bcbddc5d --- # Peachtree City Zoning Ordinance, Sec. 1114. Landscape plan approval process > As published by Municode, retrieved 2026-11-14 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix B - LAND DEVELOPMENT ORDINANCE / Article XI - VEGETATION PROTECTION AND LANDSCAPE REQUIREMENTS / Division 3 - PARKING LOT DESIGN STANDARDS AND LANDSCAPING REQUIREMENTS FOR RETAIL, COMMERCIAL AND INDUSTRIAL PROPERTIES (a) The plan shall not be accepted until after the site is cleared and graded and the building is under construction. (b) The city landscape architect shall review the plan for conformance with these regulations. If the plan does not meet these requirements, the plan will be returned with comments and suggestions for correction. If the plan meets the requirements, the plan shall be placed on the next available planning commission agenda. (c) The planning and zoning administrator shall submit the results of the city landscape architect's review to the planning commission. (d) The planning commission shall review the plan, taking into consideration the requirements identified herein and the recommendation of the city landscape architect. (e) Should the planning commission approve the plan, a copy shall be returned to the developer with the approval inscribed thereon, along with a notation of any understandings and conditions. (f) If the planning commission does not approve the plan, the developer may resubmit, with necessary changes, following the same procedures as if it were an original application, or he may appeal the decision using the procedures set out herein. (g) All landscaping identified on the approved plan shall be installed prior to the issuance of a certificate of occupancy. (1) In lieu of installing the plant material, a cash bond or other acceptable security in an amount equal to 125 percent of the city's estimated cost of the required improvements which have not been installed or are not installed in a satisfactory manner may be submitted to the planning and zoning administrator. (2) Upon posting a bond or security, the developer shall have a one-year period in which to complete the required improvements in a satisfactory manner, or the bond or other security shall be forfeited and revoked, and the city shall then take whatever action is necessary to complete the required improvements. (3) When a developer has installed the required landscaping improvements, he shall request that the planning and zoning administrator schedule an inspection by the city landscape architect. If the city landscape architect approves the installation, he shall submit a written report to the planning and zoning administrator, and the project shall be released for a certificate of occupancy. If the city landscape architect does not approve the installation, he shall submit a report stating his reasons for disapproval so the developer can make the necessary corrections. A re-inspection fee, as established within the schedule of fees, shall be required for any required re-inspections. ## History (Ord. No. 1072, § 1, 2-6-2014)