The construction plans shall not be accepted for review until after the preliminary plat is approved by city staff and the planning commission representative. The city planner shall be responsible for administering the construction plan review and approval process. Application for construction plan approval shall be made directly to the city planner and shall include, at a minimum, the following: (a) Applicable review fee. (b) Three copies of construction drawings and soil sedimentation and erosion control plans, which meet all specifications contained within section 503 of these regulations. (c) Electronic copy (pdf format) of entire submittal package. (d) The city planner shall review the construction plan submittal within three business days of receipt to ensure compliance with section 503 of these regulations as well as other city ordinances and guidelines. (1) If the construction plans do not meet the requirements of section 503, the plans shall be returned to the applicant for corrections. A resubmittal fee shall be required when the revised plans are submitted. (2) If the construction plans meet the requirements of section 503, the city planner shall distribute the plans and supporting documentation to appropriate city staff for review and comment. (d) City staff shall have 20 business days, excluding weekends and holidays, from the date a complete application is submitted to review the documents and return comments to the city planner. The city planner shall assemble these comments and return them to the applicant. (e) If revisions are necessary, three copies of the revised construction plans shall be submitted to the city planner, at which time they will be date stamped as received. A resubmittal fee shall be required when the revised drawings are submitted. (f) Once the construction plans are approved, they shall be signed by the city planner and the city engineer and then distributed to the development inspector who will review the plans and schedule a pre-construction meeting with the applicant. (g) Approval of construction plans shall expire 12 months from the date of approval unless a land disturbance permit is issued by the development inspector.