Peachtree City · Zoning Ordinance

Appendix B - LAND DEVELOPMENT ORDINANCE / Article IV - PROCEDURE FOR PLAT APPROVALS AND CONSTRUCTION AUTHORIZATION FOR ALL SUBDIVISIONS

Sec. 406. Final plat approval process.

About this text

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

1. The final plat shall not be accepted for review until all of the following items, at a minimum, are installed and completed in accordance with the provisions of this ordinance:

(a) Storm drainage facilities.

(b) Structural stormwater management facilities.

(c) Curb and gutter.

(d) Granular base, base asphalt and asphalt topping of all streets.

(e) Water lines and fire hydrants.

(f) Sanitary sewer lines and manholes.

(g) Traffic control devices and pavement markings.

(h) Soil erosion control measures.

(i) Pin marker locations.

(j) Underground utilities, including gas, electric, etc.

(k) Multi-use path connections.

(m) Landscaping and street lighting.

2. The city planner shall be responsible for administering the final plat review and approval process. Application for final plat approval shall be made directly to the city planner and shall include, at a minimum, the following:

(a) Applicable review fee.

(b) Six paper copies and one Mylar original of the final plat which shall meet all specifications contained within section 503 of these regulations.

(c) Electronic copy of final plat in pdf format.

(d) One copy of as-built drawings, reports and certifications pursuant to the requirements of this ordinance and in accordance with the as-built drawing policy on file with the office of the city engineer. For all residential subdivisions, a complete video inspection of the storm drain system must also be submitted with the as-built drawings.

(e) Proof of payment for all streetlights within the subdivision. This letter shall be on the letterhead of the utility company providing streetlights for the subdivision.

(f) Warranty deed describing all street rights-of-way, greenbelts, utility easements, multi-use path easements and other property to be dedicated to the city for maintenance; provided, however, that any such conveyance is subject to acceptance by the city council. No drainage ditches or other open drainage ways shall be described in the conveyance or accepted by the city unless specifically allowed under section 1006 of article X of the land development ordinance.

(g) A title certificate in favor of the city from an attorney licensed to practice in the state dated the date of the deed identifying that the owner/subdivider of the property owns the property to be dedicated identifying all liens, mortgages, security deeds, mechanics or material men's lines affecting the property to be dedicated.

(h) Any lien releases, or releases of quitclaim deeds necessary to release the dedicated areas from the liens identified in the attorney's title certificate.

(i) If approved by the community development director prior to submittal of the final plat, a performance bond equal to 110 percent of the cost of construction, redeemable at a local bank in the metro Atlanta region, to guarantee the installation of any infrastructure not installed at the time of the request pursuant to the requirements of this ordinance. Only those items identified within subsection (p) below shall be considered.

(j) A maintenance bond equal to 50 percent of the cost of construction, redeemable at a local bank in the metro Atlanta region to assure the structural durability, stability and integrity of the associated improvements pursuant to the requirements of this ordinance.

(k) Documentation from an engineering testing firm acceptable to the city engineer, certifying that all sub-grade conditions, construction and materials meet the city's standards. Said certification shall be based on the level of testing specified by the city engineer.

(l) The city planner shall review the final plat submittal within three business days, excluding weekends and holidays, of receipt to ensure compliance with section 503 of these regulations as well as other city ordinances and guidelines.

(1) If the final plat does not meet the requirements of section 503, the plats shall be returned to the applicant for corrections. A resubmittal fee shall be required when the revised plat is submitted.

(2) If the final plat meets the requirements of section 503, the city planner shall distribute the plats and supporting documentation to appropriate city staff for review and comment

(m) City staff shall have 20 business days, excluding weekends and holidays, from the date a complete application is submitted to review the documents and return comments to the city planner. The city planner shall assemble these comments and return them to the applicant.

(n) If revisions are necessary, three copies of the revised final plat shall be submitted to the city planner. A resubmittal fee (as appropriate) shall be required when the revised plat is submitted.

(o) The final plat must be signed by the city planner, the city engineer, the city clerk and the mayor and/or city manager prior to being recorded. In the event that the plat contains any dedication of land to the city, such dedications must be accepted by the city council.

(p) Final plat approval shall not be given until all requirements of these regulations have been met, and the city has received a legally binding bond or other satisfactory instrument or assurance of financial security, in accordance with this ordinance, providing for the maintenance of all improvements required by these rules and regulations for a period of two years following the date of final acceptance of streets by the city and either:

(1) All improvements required for final plat approval under the rules and regulations of the city have been properly completed and approved, or

(2) All required stormwater facilities, grading, water and sewer utilities, street base, asphalt topping and curbing construction have been completed, and a cash deposit, escrow account or other legally binding instrument of financial security in an amount equal to 110 percent of the projected costs of completion as determined by the city engineer has been deposited with the city clerk for any required improvements not yet completed. Said cash deposit or escrow account may be withdrawn in direct proportion to the amount of work completed as approved by the city engineer provided that sufficient funds are retained in said cash deposit or escrow account to complete construction of all required improvements. All improvements must be completed within one year after approval of the final plat. Upon final acceptance of all improvements, any funds remaining in said deposit or account shall be returned to the depositor.

(q) The applicant shall be responsible for recording the approved final plat in the office of the clerk of the superior court of Fayette County and shall return one reproducible Mylar copy showing the stamp of the Fayette County court clerk and 16 full size copies measuring 18" × 24" to the city planner.

History

The history line the source prints at the end of the section.

(Ord. No. 972, § 1, 4-16-2009; Ord. No. 980, § 1, 7-16-2009; Ord. No. 1084, § 1, 9-18-2014)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:peachtree-city/zoning/406@2026-11-14-9ba0de1ed5

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Peachtree City Zoning Ordinance, Sec. 406. Final plat approval process | Georgia Commons