Sec. 707.1. Marking standards for underground utilities.
About this text
- As published by Municode, retrieved 2026-11-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- This section's figures, maps, or images are in the source and are not shown here.
I. Definitions. The following words are to be understood consistent with the definitions contained herein as applicable to this article:
(a) Emergency means a sudden or unforeseen occurrence involving a clear and imminent danger to life, health, or property; the interruption of utility services; or repairs to transportation facilities that require immediate action.
(b) Extraordinary circumstances means circumstances other than normal operating conditions which exist and make it impractical or impossible for a facility owner or operator to comply with the provisions of this article. Such extraordinary circumstances may include, but shall not be limited to, hurricanes, tornadoes, floods, ice and snow, and acts of God.
II. White lining.
(a) Background. White lining is a practice that has been widely used in the United States where the National Transportation Board concluded that pre-marking is a practice that helps prevent excavation damage. The procedure simply involves an excavator using white paint to indicate the route or area that is going to be excavated, such that the locator then knows exactly how much marking is required and where. White lining reduces confusion about what utilities need to be marked or not marked.
(b) Purpose. The purpose of white lining is to allow everyone involved with the dig site to know the exact location of the proposed excavation. White lining the excavation site is an excellent way to assist the utilities or utility locators in marking lines in the work area right the first time and in less time. This technique eliminates speculation by the locator about where the excavation will take place and will often enable the utility or its agent to locate faster and more accurately. In short, pre-marking the area and the extent of the intended excavation can reduce delays and the time it takes to perform the locate.
(c) Examples; timing. Examples of areas to be white lined are smaller (involving only a portion of a particular address) or linear excavations such as telecommunication drops and lines, service lines (such as for water, gas, electricity and sewer), utility pits, cuts and repairs, curb repairs, bore holes, directional boring pathways, pole and signage placements, etc. Such examples are merely explanatory of the type of excavation where white lining is appropriate and are not meant to be exclusive. White lining shall be completed prior to contacting GA811 to obtain a locate request ticket number. Electronic/virtual white lining is not an acceptable or recognized method.
(d) Exceptions to white lining. Exceptions are allowed as follows:
(1) Unless one or more utility facilities are damaged five times or more collectively by a contractor making the locate request within a 90-day contract period, white lining will not be required for any large project so designated in accordance with GPSC Rule 515-9-4-.13 (a copy of GPSC Rule 515-9-4-.13 currently in effect is attached as Exhibit "A" and by this reference is incorporated herein). A large project ticket holder whose past prohibits it from being exempt, as stated above, will be subject to no more than a two-day shutdown period and shall be required to white line the remainder of the project to meet the Large Project Marking Facility Locating Agreement Schedule that the ticket holder and utility originally agreed upon;
(2) Homeowners/occupants involved in excavation or land disturbance that is confined to a single address or parcel. Homeowners/occupants shall not submit locate requests for excavation or land disturbance that will be performed by a business, a contractor, or a utility. Businesses, contractors, and utilities are not exempt from white lining;
(3) "Emergencies" and "extraordinary circumstances" as such terms are defined herein, are statutory exceptions to the requirement for obtaining a locate ticket prior to commencing mechanized excavation and, hence, also exceptions to the requirement for white lining under this section. However, if a particular emergency notification is later determined not to have been an emergency or an extraordinary circumstance, then the excavator's failure to procure a locate ticket before excavating will be treated as a violation of this section. Also, pre-excavation emergency locate ticket requests (that is, a request for a locate ticket on an expedited basis sooner than the prescribed time limit) will not be an exception to white lining as required in this section;
(4) Residential telecommunication service drop lines that can be delineated by the route of the existing line on the ground for single residential address/parcel requests only; and
(5) Termite baiting systems.
(e) White lining symbols as directions to locator. White lining proposed dig sites that will follow a single path or trench shall be marked using white lines and/or arrows and shall be located for 20 feet on either side of the white line and for 20 feet outward beyond the designated "START" and "END" of such linear white line. Therefore, it is important to identify the starting and ending points.
(f) Identification of white lining excavator. In order to enable the locating utility or its locators to quickly identify the requested locate at the job site and expedite the locating process, such excavator when white lining shall identify himself or itself by labeling the white line area with the excavator's name or the applicable locate ticket number or both.
III. Facility marking by or for utilities.
(a) Utility markings. Facility owners or their locate contractors shall indicate utility facilities by placing their UPC alpha code, along with the type material (if known) that the facility consists of, at the beginning and end of locates. Also, arrows should be placed at the ends of markings to indicate that the underground facility continues. In accomplishing the locate task, the line locator shall use industry-approved and generally accepted methods of locating. The tolerance zone shall be 24 inches measured horizontally from the outer edge of either side of such marked utility facilities.
(1) To avoid confusion on long runs, the marks shall be frequent enough to identify the owner.
(2) The marks shall indicate the approximate center-line of the underground lines. For example, the middle of the cable, line or pipe shall be at the center of the dashed marks.
(3) Location marks shall be four to 12 inches in length and at intervals of five to ten feet.
(4) The line locator (person marking the lines) shall extend marks outside the proposed work area by 20 to 30 feet if those facilities extend outside the proposed excavation area.
(5) In areas such as flower beds, rock gardens, etc., flags or stakes may be an alternative to paint. The decision to use flags, paint, or stakes shall be based on the terrain and job conditions. For instance, flags or stakes in wet areas, offsets in dirt construction zones that have a high volume of traffic crossing their line location marks.
(6) Dead ends, stub-outs, termination points, etc., shall be marked as follows:
(7) Lines that have connections (e.g., T's or Y's) or changes in directions shall be clearly indicated. Marks indicating lines or connections shall clearly show the intersection and path of the line or connection. Marks that show changes in direction shall be placed closer together for more clarity and accuracy.
(8) Manholes and valves shall be identified by using a circle and letters if they are not visible (dirt covering valve boxes or pavement covering manhole cover).
(9) Facilities that cross but do not intersect shall be marked as described to indicate such installation manner.
(10) Unlocateable sewer laterals shall be marked by placing a green triangle on the sewer main and, if the location of the tap for such unlocateable sewer lateral is known, by placing a green "T" or "Y" or other appropriate symbol at the tap pointing generally toward the address served by such unlocateable sewer lateral.
(11) When facilities share the same trench, they shall be heavily identified and separated enough so that they can be readily identified. This would apply to lines that share the same color code. For example, cable television and telephone lines:
(12) If the facility to be marked has a diameter greater than 12 inches, the size of the facility shall be indicated if known. If the size is not known, then the mark shall indicate greater than 12 inches.
(13) Duct structures shall be marked by using a dot with parallel boundary on each side of the dot.
(14) In areas where there is a strong likelihood that any or all marker types showing line location would be destroyed, offsets shall be placed on a permanent surface. However, offsets should be used only in conjunction with marks placed above a facility. Offset spacing should be every third or fourth mark. For example, the following mark would indicate the line is 16 feet from the end of the arrow.
(15) In areas where cables are spliced, the facilities should be located individually as far as possible on both sides of the splice. When the signal is distorted due to the near proximity to the splice a circle with "SP" should indicate the area of distortion or "splice pit".
Authority: O.C.G.A. §§ 25-9-3, 25-9-6, 25-9-7(a)(2), 25-9-12, 25-9-13(f), 46-2-20(i) and 46-2-30 and GPSC Utility Rule 515-9-1-.01.
History
(Ord. No. 1075, § 1, 2-20-2014)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.