All utility lines within the city shall be placed underground with the following exceptions: (1) Those lines which were in place above ground prior to May 21, 1987; (2) Those lines, temporary in nature, which are intended to provide immediate service to an area for a period not to exceed 180 days, subject to the approval of the city engineer; (3) Major transmission lines which do not provide service to adjoining properties, but are intended to distribute service between substations, subject to the approval of the city engineer; and (4) When an electric distribution line already exists overhead on, adjacent to, or across the street from a piece of property zoned for industrial use, that line may be extended overhead to the industrial property provided the overhead line extension is placed underground at the closest feasible point to the property line and does not attach directly to any structure on the property; and (5) Underground utility lines being installed, relocated or upgraded within the city shall be located in accordance with standard drawings 303 and 304 in the "DESIGN STANDARDS" section at the rear of the [this] land development ordinance. Those utilities being placed along publicly owned and maintained rights-of-way shall follow drawing number 303. Those utilities being placed along privately owned and maintained streets shall follow drawing number 304. Exceptions may be granted by the city engineer with the concurrence of the utility company or companies involved.