When used in this ordinance, the following words and phrases shall have the meaning given in this section. Words not defined herein shall be construed to have a meaning given by common and ordinary use as defined by Webster's Third New International Dictionary, copyright 1970. The term "shall" is mandatory. When not inconsistent with the context, words used in the singular number include the plural and those used in the plural number include the singular. Words used in the present tense include the future. The following definitions shall apply in the interpretation and enforcement of this ordinance, unless otherwise specifically stated: 1. Aquifer. Any stratum or zone of rock beneath the surface of the earth capable of containing or producing water from a well. 2. Area of special flood hazard. The land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. 3. As-built drawings. Amended site plans specifying the locations, dimensions, elevations, capacities and operational capabilities of road and drainage structures and facilities as they have been constructed. 4. Base flood. The flood having a one percent chance of being equaled or exceeded in any given year, also known as the intermediate regional flood. 5. Best management practices (BMPs). Schedules of activities, prohibitions of practices, general good house keeping practices, pollution prevention and educational practices, maintenance procedures, and other management practices to prevent or reduce the discharge of pollutants directly or indirectly to stormwater, receiving waters, or stormwater conveyance systems. BMPs also include treatment practices, operating procedures, and practices to control site runoff, spillage or leaks, sludge or water disposal, or drainage from raw materials storage. 6. Buffer. An area along the course of any state waters to be maintained in an undisturbed and natural condition. 7. Cart path system. A network of cart paths planned and constructed throughout Peachtree City. The overall plan for the cart path system is shown on the Peachtree City cart path map adopted in 1982, and as amended from time to time. 8. Conceptual plat. A plat made preparatory to the preliminary plat to enable the subdivider to save time and expense in reaching general agreement with the city planner and planning commission as to the form of the plat and the objectives of these regulations. 9. Conservation commission. The Georgia Soil and Water Conservation Commission. 10. Construction. Any alteration of land for the purpose of achieving its development of changing use, including particularly any preparation for, building of, or erection of a structure. 11. Construction Activity. Activities subject to NPDES Construction Permits. These include construction projects resulting in land disturbance of five acres or more. Such activities include but are not limited to clearing and grubbing, grading, excavating, and demolition. 12. Cut. A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to excavated surface. Also known as excavation. 13. Department. The Georgia Department of Natural Resources. 14. Design storm. The rainfall event of such size and frequency as described in the Stormwater Design Manual, which is used for the design of stormwater facilities. 15. Developer. Any person who acts in his own behalf or as the agent of any owner of property and engages in alteration of land or vegetation in preparation for construction activity. 16. Development. Any action in preparation for construction activities which result in alteration of either land or vegetation other than such minor land disturbing activities as home gardens and individual home landscaping repairs or maintenance work which result in minor soil erosion. 17. Community development director. The Peachtree City Community Development director or their designee. 18. Director. The director of the Georgia Environmental Protection Division. 19. District. The Towaliga Soil and Water Conservation district. 20. Division. The Georgia Environmental Protection Division. 21. Drainage. A general term applied to the removal of surface or subsurface water from a given area either by gravity or by pumping, commonly applied herein to surface water. 22. Drainage plan. A plan prepared using appropriate and commonly accepted engineering standards which specifies the means for alteration or development of a drainage system. 23. Drainage structure. Any stormwater conveyance structure as defined below, and any piping or ditching for stormwater management purposes. 24. Drainage system. The surface and subsurface system for the removal of water from the land, including both the natural elements of streams, marshes, and ponds, whether of an intermittent or continuous nature, and the manmade element which includes culverts, ditches, channels, retention facilities and the storm sewer system. 25. DRASTIC methodology. The standardized system for evaluating ground-water pollution potential using the hydro geologic settings described in U.S. Environmental Protection Agency document EPA-600-2-87-035. 26. Driveway. A vehicular access corridor privately owned and maintained. Residential driveways shall not serve more than two single-family residential lots. That portion of a driveway which is constructed on the city right-of-way must be constructed to city standards. 27. Erosion. The process by which land surface is worn away by the action of wind, water, ice or gravity. 28. Erosion and sediment control plan. A plan for the control of soil erosion and sediment resulting from land disturbing activity. Also known as the "plan." 29. Existing grade. The vertical location of the existing ground surface prior to cutting or filling. 30. Filling. The placement of any soil or other solid material, either organic or inorganic, on a natural ground surface or excavation. 31. Finished grade. The final elevation and contour of the ground after cutting or filling and conforming to the proposed design. 32. Flood. A temporary rise in the level of rivers, streams and lakes which results in inundation of areas not ordinarily covered by water. 33. Flood hazard boundary map. A map issued by the Federal Emergency Management Agency in the report entitled the Flood Insurance Study for the City of Peachtree City, dated October 21, 1976, and any revisions thereto, where the boundaries of the area of special flood hazard have been defined as zone A. 34. Flood insurance rate map (FIRM). A map issued by the Federal Emergency Management Agency in support of the Flood Insurance Study for the City of Peachtree City, dated March 18, 1996, and any revisions thereto, delineating areas of special flood hazard, base flood elevations, risk premium zones, and other flood hazard data applicable to the community. 35. Flood insurance study. The official report provided by the Federal Emergency Management Agency, containing flood profiles, as well as the flood boundary-floodway map and the water surface elevation of the base flood. 36. Floodplain. Any land area susceptible to being inundated by flood waters from any source. A flood insurance rate map identifies most, but not necessarily all of Peachtree City's floodplain as the special flood hazard area. 37. Floodway. The channel of a river or other watercourse and the adjacent land areas subject to erosive velocities and damage from flood-borne debris that must be reserved in order to discharge the base flood (intermediate regional flood), without ultimately increasing the water surface elevation more than one foot. 38. Generalized wetlands map. The current U.S. Fish and Wildlife Service National Wetlands Inventory maps for the City of Peachtree City, Georgia. 39. Grading. Altering ground surfaces to specified elevations, dimensions, and/or slopes; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition. 40. Greenbelt. An area of land to be dedicated to the city which shall remain undisturbed, insofar as possible, from its natural state to form a screen or buffer. 41. Hazardous materials. Any material, including any substance, waste, or combination thereof, which because of its quantity, concentration, or physical, chemical, or infectious characteristics may cause, or significantly contribute to, a substantial present or potential hazard to human health, safety, property, or the environment when improperly treated, stored, transported, disposed of, or otherwise managed. 42. Hotspot. An area where the land use or activities generate or have the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater. 43. Illegal discharge. Any direct or indirect non-storm water discharge to the storm drain system, except as exempted in Section 1010 of this ordinance. 44. Illicit connections. An illicit connection is defined as the following: Any drain or conveyance, whether on the surface or subsurface, which allows an illegal discharge to enter the storm drain system including but not limited to any conveyances which allow any non-storm water discharge including sewage, process wastewater, and wash water to enter the storm drain system and any connections to the storm drain system from indoor drains and sinks, regardless of whether said drain or connection had been previously allowed, permitted, or approved by an authorized enforcement agency or any drain or conveyance connected from a commercial or industrial land use to the storm drain system which has not been documented in plans, maps, or equivalent records and approved by an authorized enforcement agency. 45. Impervious surface. A manmade structure or surface which prevents the infiltration of stormwater into the ground below the structure or surface. Structures or surfaces which are constructed so as to only minimally affect the infiltration of stormwater are not considered impervious surfaces. These include: playground equipment, picnic tables, and specially designed decks and patios which allow for infiltration of stormwater. 46. Industrial activity. Activities subject to NPDES Industrial Permits as defined in 40 CFR, Section 122.26 (b)(14). 47. Intermediate regional flood. A 100-year frequency flood, as defined on the flood hazard map, which has a one-percent chance of being equaled or exceeded in any given year. 48. Intermittent stream. Any stream which flows for only part of the year and does not support aquatic life whose life history requires residence in flowing water for a continuous period of at least six months. 49. Issuing authority. Peachtree City, which has been certified by the director of the Environmental Protection Division of the Department of Natural Resources as an issuing authority, pursuant to the Erosion and Sedimentation Act of 1975, as amended. 50. Jurisdictional wetland means an area that meets the definitional requirements for wetlands as determined by the U.S. Army Corps of Engineers. 51. Jurisdictional wetland determination means a delineation of jurisdictional wetland boundaries by the U.S. Army Corps of Engineers, as required by section 404 of the Clean Water Act, 33 U.S.C. § 1344, as amended. 52. Land disturbing activity. Any activity which results in changes in the volume or flow rates of rainfall runoff, soil erosion from water or wind; or the movement of sediments into state waters or onto land within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land. 53. Live retention. That quantity of water capable of being effectively contained by a designated facility for stormwater storage for a specified period of time. 54. Lot. A tract, portion or parcel of land separated from other tracts, portions or parcels by description on a subdivision plat of record or survey map or described by metes and bounds, and intended to be used to facilitate transfer of ownership or for building development. For the purposes of this ordinance, the term does not include any portion of a dedicated right-of-way. 55. Maintenance of stormwater facility. Preserving the enclosing walls or impounding embankment of the retention facility in good condition; ensuring structural soundness, functional adequacy and freedom from sediment; and rectifying any unforeseen erosion problems. 56. Manufactured home. Means a structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 days or longer and intended to be improved property. 57. Metropolitan River Protection Act (MRPA). A Georgia law referenced as O.C.G.A. § 12-5-440 et seq., which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins. 58. National Pollutant Discharge Elimination System (NPDES) Storm Water Discharge Permit. A permit issued by the U.S. Environmental Protection Agency (or by the state of Georgia under authority delegated pursuant to 33 USC § 1342(b)) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis. 59. Natural ground surface. The ground surface in its original state before any grading, excavation or filling. 60. Nephelometric turbidity units (NTU). Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed particles are present. 61. New road construction. Installing a road where no travel surface generally used by the public exists, but may include the extension of an existing road. 62. Non-storm water discharge. Any discharge to the storm drain system that is not composed entirely of storm water. 63. Owner. The person in whom is vested the fee ownership, dominion or title of property, by proprietor; this term may also include a tenant, if chargeable under his lease for the maintenance of the property, and any agent of the owner or tenant, including a developer. 64. Perennial stream. Any stream which flows continuously throughout the year or supports aquatic life whose life history requires residence in flowing water for a continuous period of six months or longer. 65. Permit. The authorization necessary to conduct a land-disturbing activity under the provisions of this ordinance. 66. Person. Any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality, or other political subdivision of this state, any interstate body or any other legal entity 67. Pollutant. Anything which causes or contributes to pollution. Pollutants may include, but are not limited to: paints, varnishes, and solvents; oil and other automotive fluids; non-hazardous liquid, solid, and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects, and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; hazardous substances and wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; heat; and noxious or offensive matter of any kind. 68. Pollution susceptibility. The relative vulnerability of an aquifer to being polluted from spills; discharges; leaks; impoundments; applications of chemicals, injections, and other human activities in the recharge area. 69. Pollution susceptibility map. The Georgia Department of Natural Resources Hydrologic Atlas 20: Groundwater Pollution Susceptibility Map of Georgia. 70. Pretreatment. The onsite reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in stormwater prior to or in lieu of discharging or otherwise introducing such pollutants into the publicly owned drainage system. 71. Project. The entire proposed development project regardless of the size of the area of land to be disturbed. 72. Reach. A longitude segment of a stream or river measured along specified points on the stream or river. 73. Recharge area. Any portion of the earth's surface where water infiltrates into the ground to replenish an aquifer. 74. Reconstruction. Replacing an existing road surface involving activities that go beyond resurfacing. 75. Regulated activity. Any activity which will, or which may reasonably be expected to, result in the discharge of dredged or fill material into waters of the U.S. excepting those activities exempted in section 404 of the Federal Clean Water Act. 76. Reserve strip. A parcel of land whose principal purpose is to control access to streets. 77. Resurfacing. Installing one or more courses of asphalt, concrete, or other impervious surface over existing pavement. 78. Stormwater facility. A facility which provides for storage of storm water runoff and controlled release of this runoff during and after a flood storm. 79. Right-of-way. "Right-of-way" shall mean a strip or parcel of land occupied by or intended to be occupied by a street, crosswalk, pedestrian path, cart path, utility system, water main, sanitary sewer or storm drain sewer main, drainage ditches and watercourses or any other valid public use. The usage of the term "right-of-way" for land platting purposes shall mean that every right-of-way hereafter established and shown on a record or final plat is to be separate and distinct from the lots or parcels adjoining such right-of-way, and not included within the dimensions or areas of such other lots or parcels. Rights-of-way intended for streets, crosswalks, water mains, sanitary sewers, storm drains or other use involving maintenance by a public [agency, shall be dedicated or deeded to public] use by the maker of the plat on which such right-of-way is established. 80. Roadway drainage structure. Bridges, culverts and ditches associated with roadway construction, which allow stream flows to move freely under a stream crossing or to convey stormwater runoff from a roadway to a stream. 81. Runoff coefficient. The ratio of runoff to rainfall. 82. Sediment. Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, ice, or gravity as a product of erosion. 83. Sedimentation. The action or process of forming or depositing sediment. 84. Sedimentation facility. A facility specifically developed for the purpose of allowing the deposition of sediment resulting from the land development process. 85. Shear failure. Failure of an earthen bank caused by the steepness of the slope. 86. Significant recharge areas. Those areas mapped by the Georgia Department of Natural Resources in Hydrologic Atlas 18 (1989 edition). 87. Stabilization. The process of establishing an enduring soil cover of vegetation and/or mulch or other ground cover and/or combination with installing temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity. 88. State waters. Any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, natural drainage systems which contain flowing water and which appear on the USGS Quad map, springs, wells, wetlands and other bodies of surface or subsurface water, natural and artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation. Wetlands shall also be considered jurisdictional waters of the United States, as that term is defined by 42 USCFR and the regulations promulgated thereunder. 89. Stormwater. Any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation. 90. Stormwater Design Manual. Volume 2 (Technical Handbook) of the Georgia Stormwater Management Manual, current edition, as published by the Atlanta Regional Commission and Peachtree City design standards. The Georgia Stormwater Management Manual is available online at www.georgiastormwater.org. 91. Stormwater pollution prevention plan. A document which describes the best management practices and activities to be implemented by a person or business to identify sources of pollution or contamination at a site and the actions to eliminate or reduce pollutant discharges to stormwater, stormwater conveyance systems, and/or receiving waters to the maximum extent practicable. 92. Stormwater runoff. The portion of a precipitation on the land which reaches the drainage system. 93. Stream. Natural, running water flowing continuously or intermittently in a channel on or below the surface of the ground. 94. Structural erosion and sediment control practices. Measures for the stabilization of erosive or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures, sediment traps, land grading, etc. 95. Structural stormwater control. A structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity, the quality, the period of release or the velocity of flow. 96. Structure. Anything constructed or erected, the use of which requires a location on the ground, or attached to something having a location on the ground, including, but not limited to, tennis courts, fences, swimming pools, and buildings. 97. Subdivider. Any person, persons, partnership, corporation or other entity or the estate of such entity having a proprietary interest in the land to be divided. 98. Subdivision. Subdivision includes all divisions of a tract or parcel of land into two or more lots, building sites, or other divisions for the purposes, whether immediate or future, of sale, gift, or building development and includes all divisions or development of land involving a new street or a change in an existing street. It shall also include resubdivision, the process of subdividing and the land or area subdivided; provided, however, divisions of land into parcels of five acres or more where no new street is involved are not included in this definition. 99. Substantial improvement. Any repair, reconstruction, or improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure, either: (1) Before the improvement or repair is started, or (2) If the structure has been damaged and is being restored, before the damage occurred. For the purpose of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor or other structural part of the building commences, whether or not that alteration affects the external dimensions of the structure. The term does not, however, include either any project for improvement of a structure to comply with existing state or local health, sanitary, or safety code specifications which are solely necessary to assure safe living conditions; or any alteration of a structure listed on the National Register of Historic Places or a state inventory of historic places. 100. Tree. A woody plant which, when mature, has a single or combined trunk with a caliper (diameter) of eight or more inches five feet above the ground, or any flowering ornamental woody plant having a caliper of two or more inches five feet above the ground. 101. Undisturbed natural buffer. A tract of land in its natural undisturbed state where no vegetation can be removed or planted without a city permit. No herbicides, pesticides, or other chemicals, either natural or manmade can be used in this buffer. The city may permit the trimming of tree branches and the removal of noxious weeds, woody plants that are not trees, or other undesirable vegetation that will not adversely impact water quality. The city will permit the installation of vegetation (not grasses commonly used for lawns), in this area which will, in the opinion of the city, enhance water quality. 102. Utility. Any public or private water or sewer piping systems, water or sewer pumping stations, electric power lines, fuel pipelines, telephone lines, roads, driveways, bridges, river/lake access facilities, storm water systems, publicly owned cart paths, and railroads or other utilities identified by Peachtree City. 103. Vegetation. All plant growth, especially trees, shrubs, vines, ferns, mosses, and grasses. 104. Vegetative erosion and sediment control practices. Measures for the stabilization of erosive or sediment producing areas by covering the soil with: (a) Permanent seeding, sprigging or planting, producing long-term vegetative cover; or (b) Temporary seeding, producing short-term vegetative cover; or (c) Sodding, covering areas with a turf of perennial sod-forming grass. 105. Watercourse. Any natural or man-made conveyance channel, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which stormwater flows either continuously or intermittently and which has a definite channel, bed and banks, and including any areas adjacent thereto subject to inundation by reason of overflow or floodwater. 106. Wetlands. Those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas. The ecological parameters for designating wetlands include hydric soils, hydrophytic vegetation, and hydrological conditions that involve a temporary or permanent source of water to cause soil saturation.