(a) Policy. It is hereby declared to be public policy that all development submitted in accordance with applicable provisions of this article shall meet the requirements for their preparation and shall also provide information to enable a determination to be made by the city engineer as to plan conformance with public policy statements of this section. (b) Standards. All persons proposing development or construction shall submit plats to the city engineer illustrating the means by which conformance with policy provisions may be achieved and illustrating compliance with applicable development standards before issuance of a development or building permit. Electric, telephone and gas utilities shall submit plans and obtain a development permit only for major transmission installations located within right-of-way or easements devoted exclusively to installation of utility facilities. Individual single-family lots within approved subdivisions and outside of the intermediate regional floodplain shall be exempt from these requirements for new residential construction unless specified on the recorded plat. Grading, erosion control, sedimentation control, and drainage plans shall be prepared under the supervision of a current Georgia-registered professional engineer, architect, landscape architect, or combination as may be appropriate for project planning and design. When the hydrologic engineering analysis includes applications of the principles of flood routing, super critical flow, high energy dissipation or conversion, backwater curves, floodplain studies or other advanced hydrologic engineering techniques, the analysis shall be made by a current Georgia-registered professional engineer proficient in hydrology. Plans and supporting documentation to show conformance with this ordinance shall be submitted to the city engineer and shall include: (1) Evidence of conformance with the requirements of this section for grading, vegetation, alteration, erosion control, sedimentation control, flood control and drainage system alteration or development. Grading plans shall illustrate existing and proposed contours to the five-foot interval; golf courses and other open space areas shall be exempt from this requirement but general grading plans shall be submitted. Related plans shall show locations of structures, roads, surface drainage, existing and proposed drainage conduits and proposed alterations to the existing site; (2) A hydrologic engineering analysis of stormwater runoff under existing and proposed developed site conditions and a detailed evaluation of the projected effects on upstream and downstream properties within the affected drainage basin. This analysis shall include a determination of the culvert, floodplain and channel cross-section area required to carry the affected stream at the intermediate regional flood stage level. The requirements for a complete hydrologic study may be waived by the city engineer for any development where the plan submitted illustrates existing or proposed improvements sufficient to ensure compliance with applicable provisions of this article; (3) Delineation of the boundaries and contour elevations of the intermediate regional floodplain for streams draining in excess of 100 acres shall be clearly designated on each site plan, subdivision plat and construction plan. The actual building site in relation to the intermediate regional floodplain boundaries shall be shown; once shown and accepted by the city, the same information shall be indicated by the seller to the purchaser of each property so affected. The elevation contours representing the intermediate regional flood conditions shall be shown when they are located outside established ditch banks. A benchmark suitable for determining intermediate regional flood elevations shall be established; (4) The projected sequence of work represented by the grading, vegetation, erosion control, sedimentation control and drainage plans as related to other major items of construction; and (5) Upon development project completion, location, size and invert elevations of piped segments of the storm drainage system, of control weirs, and maximum water surface elevations in stormwater pools shall be shown on the final plat for a subdivision, and on final plat for other developments which shall be submitted to the city engineer. The professional engineer, architect, or landscape architect reviewing the construction shall provide a certificate that the development is in substantial compliance with approved plans for the project when required by the city engineer; (6) When reviewing any application for a land disturbing activity permit, the city shall consider the past record of the permit applicant in complying with previous land disturbing activity permits and this ordinance. If the applicant has had two or more violations of previous permits of this ordinance within three years prior to the date of the filing of the application under consideration, the city may require the applicant to post a bond up to, but not exceeding $3,000.00 per acre of the proposed land disturbing activity prior to issuing the permit. If the applicant does not comply with this ordinance or with the conditions of the permit after issuance, the city may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance.