12-3. Application for Building/Development Permit.
About this text
- As published by Municode, current through 2025-01-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
All applications for building/development permits shall be accompanied by two copies of a plat or plan drawn to scale, and furnished by the applicant, showing the actual dimensions of the lot to be built upon, the size and location of the lot, the number of dwelling units or other uses the building is designed to accommodate, the setback lines of the building on the lot, and such other information as may be essential for determining whether the provisions of this ordinance are being observed. The following is required on the site plan before the site plan is considered by the Code Inspector.
Any building/development permit shall become void if the work involved has not begun within six (6) months after the date of issuance of the permit or if the work or development authorized by such permit is suspended or abandoned for a period of six (6) months after the work or development is commenced; provided that extensions of time in periods not exceeding six (6) months each may be allowed in writing by the Code Inspector. Any unapproved
deviation from the site plan shall cause the Code Inspector to not issue a Certificate of Occupancy.
The applicant for a building/development permit shall submit a certificate with this application which certifies that the lot which he proposes to develop is a lot of record. When the lot in question does not meet the lot width and lot area requirements of this ordinance, then the applicant shall certify that such lot was a lot of record prior to the adoption of this ordinance or the adoption of the Pierce County Subdivision Regulations or is a lot which has been created through governmental taking of property.
12-3.1 Coordination with Development of Regional Impact Requirements. The Georgia Department of Community Affairs, pursuant to the Georgia Planning Act, has established criteria for the identification of certain large scale developments which have the potential to cause land use impacts beyond the boundaries of the respective local
government where a project might be proposed. These developments, known as Developments of Regional Impact (DRIs), shall be submitted, based on established DCA standards, procedures, and format, to the South Georgia Regional Commission (SGRC)
for review and recommendation prior to issuance of any local building or development permit or utility tap (does not apply to any activity reviewed under any earlier Zoning district amendment). As such, these requirements establish an official delay in the local permitting and/or review process to allow for compliance with these requirements.
12-3.2 Coordination with Water Resource District Requirements. As identified in Section 10, the following Water Resource Districts are established for Pierce County and the Cities of Blackshear, Offerman, and Patterson: Groundwater Recharge Areas, Flood Hazard
Districts, and Wetlands Districts. Data showing the boundaries of the Groundwater Recharge Areas, Flood Hazard Districts, and wetlands are available as digital overlays.
Prior to issuance of any local building/development permits, these databases shall be checked, and if any are found applicable to the subject project, all requirements of Section 10, Water Resource Districts, shall be enforced as part of the permitting
process.