5-2.1 Utility: Utility locations, wherever feasible, shall be located within the platted right-ofway. If easements are required, they shall be a minimum width of twenty (20) feet. Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase, they shall be platted within said subdivision or phase thereof.