The subdivider shall provide street paving and proper drainage control structures, which may include ditch slopes with grass cover, paved ditches, drainage canals, erosion control devices, retention ponds, and/or curb and gutter. Grass cover shall be established on all unpaved ditches and unpaved shoulders. All streets and roads shall be paved according to standards set by the Georgia Department of Transportation Standard Specifications for Roads and Bridges.