Pierce County · Zoning Ordinance
Appendix B - LAND SUBDIVISION ORDINANCE
2-1. Interpretation of Certain Terms and Words.
About this text
- As published by Municode, current through 2025-01-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Words used in the present tense include the future tense. Words used in the singular include the plural, and words used in the plural include the singular.
The word "person" includes a firm, partnership, company, corporation, or association.
The word "lot" includes the word "plot" or "parcel."
The word "building" includes the word "structure."
The word "shall" is always mandatory, and not merely discretionary.
The word "used" or "occupied," as applied to any land or building, shall be construed to include the words "intended, arranged, or designed to be used or occupied."
Abutting property. Any property that is immediately adjacent or contiguous to property proposed to be subdivided or that is located immediately across any road or public right-of-way.
Alleys. A public right-of-way, not intended to be a vehicular arterial or to provide the primary means of access to abutting property, but used for service access to the rear or side properties otherwise abutting a public street.
Applicant. Any person who submits subdivision plans to the county for the purpose of obtaining approval thereof.
Architect. A qualified person registered and currently licensed or otherwise authorized to practice architecture in the State of Georgia.
Buffer. That portion of a given lot, not covered by buildings, pavement, parking, access areas, and service areas, established as landscaped open space for the purposes of screening and separating properties. A buffer consists of trees, shrubs, and other natural vegetation, to be replanted where sparsely vegetated or disturbed.
Building line. A line beyond which no foundation wall or part of the structure of any building shall project, with the exception of roof overhang, walkways, and the subsurface projection of footings; provided, however, that such overhang does not exceed six feet and does not encroach upon the adjacent property or right-of-way.
Building. Any structure, except a manufactured home or mobile home, which has a roof and which is for the shelter, support, or enclosure of persons, animals, or property of any kind.
Comprehensive Plan. The most current Comprehensive Plan(s) for Pierce County and the Cities of Blackshear, Offerman, and Patterson, as duly adopted and subsequently amended by the respective member governments. This plan includes future land use designations, community work programs, and other elements for each respective local government.
Conditional Use Permit. A Conditional Use Permit is a use which, within certain districts specified by this ordinance, is not permitted as a matter of right but may be permitted within these districts by the applicable governing body (City Council or County Commission) after the Planning, Zoning, and Code Enforcement Board has reviewed the proposed use and provided a recommendation to the applicable governing body. Standards for Conditional Use Permit review are in [Appendix A,] Section 16-3.
Consultant. The licensed design or engineering professional or firm hired by the subdivider to oversee all aspects of the subdivision and design process.
County commission. The Board of Commissioners of Pierce County, Georgia.
County. Pierce County, Georgia.
Crosswalk. A right-of-way within a block dedicated to public use for pedestrian use only and so designed as to provide access to adjacent streets or lots.
Cul-de-sac. A street having only one end open for access to another street, the other end being terminated by a turnaround as specified in this article.
Curb Cut. The providing of vehicular ingress and/or egress between a property and an abutting public street.
Developer. Same as subdivider (see definition).
Development. The act or process of erecting buildings, structures, or of making improvements to property, or laying out and dividing land.
Dwelling Unit. An enclosure of one or more rooms, including kitchen and bathroom facilities, designed or constructed as a unit for residential occupancy by one household.
Easement. A grant by the owner of land for the use of such land by others, including public usage, for a specific purpose or purposes.
Governing Authority. As used in this ordinance, the Board of County Commissioners of Pierce County and/or the City Councils of the Cities of Blackshear, Offerman, and/or Patterson, as applicable.
Hardship. A situation arising as the result of extraneous or unique circumstances which deprives the developer of the reasonable use of his/her land if the strict application of the various provisions of this article are applied. (See Variance)
Improvement plan. The second stage of plat or subdivision plan review.
Land characteristics. A soils inventory of the area proposed for development. The inventory will include a soils map and identification of soil types. This information may be obtained by request of the property owner from the local Natural Resources Conservation Service office.
Landscape architect. A design professional registered and currently licensed or otherwise authorized to perform professional services, including, but not limited to, consultation, investigation, planning, design, preparation of drawings and specifications, and responsible supervision, all in connection with the preservation or determination of proper land uses, natural land features, esthetics, planting plans, the shaping of land to produce the best functional and esthetic effect, and grading plans with determination of drainage. This term shall also include the consideration of environmental problems involving land areas, as such problems relate to the public health, safety, and welfare.
Lot of Record. A lot which is part of a subdivision recorded in the office of the Clerk of the Superior Court of Pierce County, or a parcel described by metes and bounds, the description of which has been so recorded prior to the adoption of the Pierce County, Blackshear, Offerman, and Patterson Subdivision Regulations.
Lot Width or Frontage. The width in linear feet of a lot or parcel where it abuts the right-of-way of any public street. In the case of corner lots and through lots, the longest side of the lot that runs adjacent to the right-of-way shall be considered the lot width. In the case of irregularly shaped lots, the side of the lot that most closely approximates a straight line and abuts the right-of-way shall be considered the lot width.
Lot, Corner. A lot having frontage on two or more public streets at their intersection.
Lot, Through. A lot other than a corner lot, having frontage on more than one street; or a corner lot having frontage on three or more streets.
Lot. A tract or parcel of land, held in a single ownership by one person, or in common ownership by more than one, which has both usable lot area and lot dimensions equal to or greater than the lot width and lot area requirements established by this ordinance for the zoning district in which such tract of land is located and for the use proposed for the tract of land. (See [Appendix A,] Sections 3-20 and 3-21)
Manufactured Home Park. An area, under single ownership and not subdivided into customary lots planned for individual ownership, containing three or more manufactured homes used as living facilities, with each such home having its own defined space; or an area containing three or more spaces designed or intended for the parking of manufactured homes to be used as living facilities for rent or lease.
Manufactured Home. A factory-built structure, transportable in one or more sections, designed to be used as a dwelling with or without a permanent foundation, constructed on or after June 15, 1976 in compliance with the Manufactured Home Construction and Safety Standards (42 U.S.C. 5401-5426).
Mobile Home. A factory-built structure, transportable in one or more sections, designed to be used as a dwelling with or without a permanent foundation, constructed prior to the enforcement of the Manufactured Home Construction and Safety Standards (42 U.S.C.
5401-5426), effective June 15, 1976. Mobile homes, as defined herein, may not be placed within any zoning district in Pierce County or the Cities of Blackshear, Offerman, and Patterson.
Non-Conforming. A building, structure, lot, or use of land existing at the time of the enactment of this ordinance which does not conform to the regulations of the district in which it is located.
Open Space. That required portion of a lot at ground level, unoccupied by enclosed buildings and available to all occupants of the property.
Owner(s). If a sole proprietorship, the proprietor; if a partnership, all partners (general and limited); if a corporation, all officers, directors, and persons holding at least ten percent (10%) of the outstanding shares.
Planning Staff. Qualified employees of the government of Pierce County or the Cities of Blackshear, Offerman, and Patterson charged with handling matters related to planning, such as comprehensive plans, future land use, subdivision of land, and other related matters. This definition shall include the Zoning Administrator, the Planning Director, their designees, and staff employed under their supervision, as appropriate.
Planning, Zoning, and Code Enforcement Board. An advisory board whose members are appointed by the governments of Pierce County and the Cities of Blackshear, Offerman, and Patterson, Georgia. The primary purpose of the Planning, Zoning, and Code Enforcement Board is to provide recommendations to the local governing bodies regarding land development decisions; the Board is not authorized to take any final action regarding the zoning or use of any property, this being the prerogative of the local governing bodies (i.e., County Commission and City Councils). For full details on the role of the Planning, Zoning, and Code Enforcement Board, the Board's Charter should be consulted.
Plat, final. The final stage of plat or subdivision plan review.
Plat, preliminary. The first stage of plat or subdivision plan review.
Plat. A map, generally of a subdivision, showing the location, boundaries and ownership of individual properties.
Principal Building. The building containing or to contain the principal use of a lot.
Principal Use. The principal purpose for which a lot or the main building thereon is designed, arranged, or intended, and for which it is or may be used, occupied, or maintained.
Private right-of-way. A portion of land being used or to be used as a street, road, thoroughfare, crosswalk, pipeway, drainage canal, and/or other similar uses and designated by means of right-of-way but not deeded to the governing authority.
Public right-of-way. A portion of land being used or to be used as a public street, road, thoroughfare, crosswalk, pipeway, drainage canal, and/or other similar uses and designated by means of right-of-way deed to the governing authority.
Public water and sewage systems. A system owned and operated by Pierce County or one of its incorporated municipalities.
Setback. The minimum distance required between the parcel boundary and a building or structure located on the parcel.
Street, public. Right-of-way dedicated to the city, county, state, or federal government, or owned by the city, county, state, or federal government, which is developed, maintained, and used primarily for the purpose of transportation and/or movement, by vehicle, foot, or other means, and for access to abutting property.
Structure. Anything constructed or erected with a fixed location on or in the ground, or attached to something having a fixed location on the ground. Among other things, structures include buildings, manufactured homes, billboards, swimming pools, carports, and fallout shelters, but do not include walls or fences.
Subdivider. Any person, firm, corporation, association or partnership or any agent thereof who undertakes or proposes to undertake the subdivision of land so as to constitute as herein defined.
Subdivision. The division of a lot, tract or parcel of land into four or more lots, tracts, parcels, or other divisions of land for the purpose, whether immediate or future, of sale or building development. The following shall not be considered subdivisions within the meaning of this article.
1. Division in two or more lots where each lot has a minimum of three acres and no streets are created.
2. Divisions of property upon court order, including but not limited to judgments or foreclosure.
3. Where the combination or recombination of portions of previously platted lots where the total number of lots, tracts, parcels, sites, or plots of land is not increased and the resultant lots, tracts, parcels, sites, or plots of land are equal to the standards of these regulations, the zoning ordinance, or other applicable regulations or ordinances as officially adopted by the Pierce County or the applicable municipality.
Subdivision plans. Subdivision plans are interpreted to be all plans required for delineation of rights-of-way, easements, lots, preservation areas, etc., and all construction plans required for the development of all physical facilities pertaining thereto.
Tax assessor. The Pierce County Board of Tax Assessors.
Tract. A portion of land with definite and ascertainable limits or boundaries. (See definition of "Lot.")
Utility. Any community service available to the public by means of an overhead or underground distribution or collection system such as electricity, telephone, water, gas, and sewage disposal.
Variance. A relaxation of the standards of this Ordinance that will not be contrary to the public interest and where, owing to conditions peculiar to the property, the literal application of this Ordinance would cause an unnecessary hardship. The final action on variances is taken by the Zoning Board of Appeals after said board receives a recommendation from the Planning, Zoning, and Code Enforcement Board.
Yard, Front. That area of a lot lying between the abutting street right-of-way line and the principal building of the lot and extending across the front of a lot from side lot line to side lot line.
Yard, Rear. That area of a lot extending across the rear of a lot from side lot line to side lot line and lying between the rear lot line and the principal building on the lot.
Yard, Side. That area of a lot between the side lot line and the principal building on the lot extending from the front yard to the rear yard.
Zoning Administrator. The person, officer, or official and this authorized representative, whom the County Commission and/or City Councils have designated as their agent for the administration of these regulations.
Zoning District. A delineated section or sections of Pierce County and/or the Cities of Blackshear, Offerman, and Patterson for which the zoning regulations governing the use of buildings and premises, the height of buildings, the size of yards, the intensity of use, and various other requirements are uniform.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.