Pierce County · Zoning Ordinance
Appendix B - LAND SUBDIVISION ORDINANCE
4-3. Final Plat.
About this text
- As published by Municode, current through 2025-01-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
4-3.1 Conformance: The final plat shall be consistent with the approved preliminary plat. If desired by the subdivider, he may submit only that portion of the preliminary plat he proposes to record and develop at that time; provided, that such portion conforms with all requirements of this ordinance. The recorded plat (final plat) is to be prepared and sealed by a registered land surveyor, licensed in the State of Georgia. No plat of a land subdivision shall be recorded unless the plat conforms to the requirements of the Zoning Ordinance and this Subdivision Ordinance, and the applicable local government has formally accepted dedication of any proposed streets and encroachments. The plat shall not be recorded until the developer submits to the Zoning Administrator all final permits required for the construction of all improvements from all applicable state, local, and federal agencies.
4-3.2 Filing: The final plat filed with the Zoning Administrator shall include the following:
a. A letter of application, containing:
1) The name and address of the person(s) developing the subdivision and their agents;
2) Zoning of the property to be subdivided;
3) Description of intended phases of development, if the subdivision is to be developed in phases;
4) Plans for serving the proposed subdivision with sewer and water facilities.
b. A complete list of deviations, if any, from the approved preliminary plat.
c. A copy of the agreement for providing the necessary water and sewer facilities.
d. A fee to cover the cost of investigation and review of the preliminary plat, improvement plans, final plat, and final recording will be charged at the time of application. The fees are determined by the Pierce County Board of Commissioners in cooperation with the City Councils of Blackshear, Offerman, and Patterson.
e. Five (5) copies of the final plat, which shall include the following:
1) Sheet design: The final plat shall conform to the items listed under the preliminary plat (see Section 4-1.1) and the requirements thereof, as set forth in this ordinance.
The sheet size shall be 24 by 36 inches unless another size is approved by the Zoning Administrator. The final plat shall be drawn to an appropriate scale (stated and graphical). If necessary, more than one sheet may be used as long as a key map is provided to related each sheet to the entire platted area.
2) Surveyor certificate: The following certificate shall be entered on the face of the plat: "I certify that all measurements are correct and were prepared from an actual survey of the property made under my supervision; the field data upon which this plat is based has a closure precision of one foot in feet and an angular error of per angle point, and was adjusted using rule; the plat has
been calculated for closure and is found to be accurate within one foot in feet; monument and pin locations are correctly shown by the symbols
and the pins are [type of metallic material and length].
Signed (Seal) (Date) Surveyor, Georgia Registration no.
3) Flood-prone areas: Any flood-prone areas must be indicated on the final plat.
4) Wetlands: Any identified wetlands must be indicated on the final plat, and proof of compliance with any U.S. Army Corps of Engineers requirements for wetlands must be submitted prior to recording of the final plat. Should no wetlands exist in the subdivision, the plat must include a statement to that effect.
5) Groundwater recharge areas: Any identified groundwater recharge areas must be indicated on the final plat. If none are present in the subdivision, the plat must include a statement to that effect.
f. Owner certificate: The following certificate shall be entered on the face of the plat:
We, the undersigned owner(s) and/or mortgagee(s) of the Subdivision, hereby offer to dedicate and/or reserve for public use the rights-of-way, easements, and other public areas as designated on this plat.
Owner Date Mortagee Date ________________ ________________ ________________ ________________ ________________ ________________ ________________ ________________
g. Approvals: The following spaces shall be provided in the form listed below for approval by all agencies having jurisdiction. Placement on plat may vary.
Approved by the Pierce County Health Department, Pierce County, Georgia.
Date Signed Health Department Representative Approved by the Pierce County Planning, Zoning, and Code Enforcement Board Date Signed
Planning Director
h. Surveying data: The final plat shall contain the location, bearing, and length of every street line, lot line, and boundary line, whether curved or straight. A note will be made on the plat as to whether curved dimensions are arc or chord distances. Easement lines (and width), land lot lines, and land district lines will be shown. The final plat shall also identify each tract within the proposed subdivision by block and lot number.
i. Dimensions: All dimensions shall be shown in feet and decimals to the nearest onehundredth (1/100) of a foot, and all angles shall be shown to the nearest second. The error of closure shall not exceed one in ten thousand (1/10,000), or as defined by the technical standards required by O.C.G.A. § 15-6-67, of the Law Governing the Practice of Professional Engineering and Surveying, as amended. The final plat shall have a note listing the following:
Total acres Total lots
j. Monuments: The final plat shall show the accurate location, material, and description of all monuments. A permanent master bench mark shall be established (subject to the approval of the Zoning Administrator) within or adjacent to the site by transfer of levels, not less than third order accuracy, from the nearest approved bench mark of known mean sea level (M.S.L.) elevation, showing its location on the final plat and recording its elevation to the nearest hundredth (1/100) of a foot.
k. Easements: The final plat shall show the location and width of all public utility easements and drainage easements where required, including required maintenance easements outside of public rights-of-way.
4-3.3 Filing certificate: The final plat shall be deemed filed with the Planning, Zoning, and Code Enforcement Board when it is filed with the Zoning Administrator. At the time of filing, a certificate of filing shall be furnished to the applicant which will include the time and date of filing. The final plat shall be prepared in accordance with this ordinance and applicable County and/or City requirements by a registered land surveyor who is licensed under the laws of the State of Georgia. The Zoning Administrator shall have the authority to reject the final plat if they find that it does not conform with the approved preliminary plat or this ordinance. If the plat is rejected, the Zoning Administrator shall provide the subdivider with a written statement specifying all the respects in which it does not conform. The subdivider may appear to the Planning, Zoning, and Code Enforcement Board from such rejection.
4-3.4 Approval by individual agencies: No final plat shall be approved unless the Planning, Zoning, and Code Enforcement Board first obtains approval of the Pierce County Health Department. This and other agencies shall approve, with or without modification, or disapprove the final plat to the extent to which each has jurisdiction. Within ten (10) days of time of submittal, the developer will be notified of approval or disapproval. If disapproved, reasons for disapproval shall be noted.
4-3.5 Staff development review: Upon receipt of the final plat, the Zoning Administrator shall prepare those materials for presentation to the Planning Staff. The Planning Staff shall review the final plat for technical compliance with the Subdivision Ordinance, Zoning Ordinance, Comprehensive Plan, and other ordinances that might have an impact on the proposed land subdivision. The Planning Staff shall provide a written statement recommending either approval, conditional approval, postponement, or disapproval.
4-3.6 Coordination: It shall be the responsibility of the Zoning Administrator to ensure that the respective reviews of the Health Department, Planning Staff, and other applicable agencies are brought together in a timely fashion.
4-3.7 Review by the Planning, Zoning, and Code Enforcement Board. The Planning, Zoning, and Code Enforcement Board or their designee shall review and approve the final plat, giving due consideration to the reviews of the Planning Staff and the Health Department.
4-3.8 Recording a plat: Upon satisfactory compliance with this ordinance, and after acceptance by the applicable local government of any proposed streets and improvements, and the posting of the required guarantee, the local government shall release the plat to the Zoning Administrator for recording.
4-3.9 Revision to a recorded plat: Proposed revisions to a recorded plat which do not affect platted rights-of-way may be submitted for administrative approval in accord with the provisions of Section 4-3.12. In addition, a revision to a recorded plat shall show the name, phase (if applicable), date of the recorded subdivision plat being revised, and the exact citation with regard to the County Land Records and the book and page number wherein said plat is recorded. Revision to a recorded plat which involve platted rights-of-way or other major changes shall be submitted as a preliminary plat.
4-3.10 Distribution: The Zoning Administrator shall distribute the final plat to the following agencies: Clerk of Court, Public Works Department, Building Inspector, Utilities Department, Fire Department, Police Department, Tax Assessor, Health Department, E-911, Servicing Telecommunications Company, Servicing Electrical Utility Company, Servicing Cable TV and Broadband Companies, Board of Education, and Planning, Zoning, and Code Enforcement Board.
4-3.11 Administrative approval of re-subdivisions and combination of lots: Where located on an existing road or street, the combination of existing lots, or the modification of boundaries between lots, where the total number of lots does not increase, and the resultant lots are equal to the current standards of the Subdivision Ordinance and Zoning Ordinance as determined by the Planning Staff, shall be subject to administrative approval. Such plats shall conform fully to the requirements of this ordinance and the Zoning Ordinance. No non-conforming lots shall be created. It shall be the responsibility of the Zoning Administrator to coordinate said administrative review.
4-3.12 Exempt Plat Process: Any plat submitted for recording to the office of the Clerk of Superior Court, Pierce County that is not subject to this ordinance shall comply with O.C.G.A. § 15-6-67(d), as amended. All plats exempt from the standard review process must be assigned a map and parcel number by the Board of Tax Assesors if a new lot is being created. Resurveys of existing parcels which do not involve a map and parcel change must be verified by the Zoning Administrator and the Tax Assessor's office. All exempt plats, which include resurveys of lots of record, exempt re-subdivisions, and exemptions by definition, must be stamped as exempt prior to recording.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.