The following standards are established to enhance the informal, natural character of the Pine Lake community: A. Permitted plant materials include, but are not limited to, those found on the city-approved plant materials list. Plants identified as invasive species or invasive species of concern by the Georgia Department of Natural Resources are prohibited as landscape materials. B. Existing, natural surface drainage ways, flood areas and water retention areas shall be preserved whenever feasible and shall be stabilized using ground covers and plants commonly found in such natural areas for the purposes of minimizing storm water run-off, facilitating infiltration into the soil to filter stormwater and preventing siltation of streams. C. No ground area shall be allowed to remain exposed with the exception of seasonal gardens. All ground area shall be covered with grass or dense ground covers. Open areas outside the floodplain may be stabilized using natural plant mulch, pea gravel or other city-approved mulch materials. D. A rainwater detention system shall be required to collect rainwater from building roofs for each new dwelling unit and accessory buildings. Such rainwater detention systems shall be tied to either the stormwater detention system or a detention area or installed with hoses that distribute rainwater to gardens or site landscaping. E. Pea gravel and decorative landscaping stone may be used for up to 50 percent of ground cover in front yards and yards adjacent to a street, exclusive of required parking and driveways.