--- title: Pine Lake Zoning Ordinance, Sec. 9-4. Application process collection: local-codes id: local-code:pine-lake/zoning/9-4 cite_as: Pine Lake, Ga., Zoning Ordinance ยง 9-4 canonical_url: https://georgiacommons.org/code/local/pine-lake/zoning/9-4 md_url: https://georgiacommons.org/code/local/pine-lake/zoning/9-4.md text_url: https://georgiacommons.org/code/local/pine-lake/zoning/9-4/text source_url: https://library.municode.com/ga/pine_lake/codes/code_of_ordinances date: 2026-07-30 status: active jurisdiction: city:pine-lake jurisdiction_name: Pine Lake place_fips: "1361040" corpus_version: local-codes-pine-lake-a43c126b52f5 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/pine-lake/zoning/~appendix-a/~article-9.md previous: https://georgiacommons.org/code/local/pine-lake/zoning/9-3.md next: https://georgiacommons.org/code/local/pine-lake/zoning/9-5.md index: https://georgiacommons.org/code/local/pine-lake.md branch: zoning edition: As published by Municode, current through 2026-07-30 edition_date_kind: current_through source_publisher: Municode version_id: local-code:pine-lake/zoning/9-4@2026-07-30-47fa508074 --- # Pine Lake Zoning Ordinance, Sec. 9-4. Application process > As published by Municode, current through 2026-07-30 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article 9 - MIXED USE OVERLAY A. A pre-application conference shall be held by the Zoning Official for the purpose of reviewing the application process and requirements of the Mixed-Use Overlay prior to submittal of an application for assignment of a Mixed-Use Overlay. Discussion of the projected mixed-use project design and its relationship to the standards of this article shall form a portion of those discussions. B. Following the pre-application conference, ten copies of the site plan, elevation drawings of each building facade and landscape plan shall be submitted, as applicable, and shall be reviewed for compliance with the Mixed-Use Overlay requirements by the zoning official. C. All exterior demolition, new construction (including building additions), expansions of outdoor dining areas or any construction that results in increased lot coverage or modification of the building footprint shall be subject to the pre-application conference and submittal requirements. Routine repair and maintenance and interior improvements are not subject to the pre-application conference provided they involve no change of use. For example, a proposal involving conversion of a retail store to a restaurant would require a pre-application conference to determine impact on such facilities as restrooms and parking.