--- title: Pine Mountain Zoning Ordinance, SECTION 1 (Article VIII). EXISTING LOTS OF RECORD collection: local-codes id: local-code:pine-mountain/zoning/article-viii-1 cite_as: Pine Mountain, Ga., Zoning Ordinance, Article VIII, ยง 1 canonical_url: https://georgiacommons.org/code/local/pine-mountain/zoning/article-viii-1 md_url: https://georgiacommons.org/code/local/pine-mountain/zoning/article-viii-1.md text_url: https://georgiacommons.org/code/local/pine-mountain/zoning/article-viii-1/text source_url: https://pinemountainga.org/sites/default/files/uploads/zoning/2022/zoning_ordinance_2019_organized.pdf date: 2026-11-14 status: active jurisdiction: city:pine-mountain jurisdiction_name: Pine Mountain place_fips: "1361124" corpus_version: local-codes-pine-mountain-c77b81e345c0 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/pine-mountain/zoning/~article-viii.md previous: https://georgiacommons.org/code/local/pine-mountain/zoning/article-viii.md next: https://georgiacommons.org/code/local/pine-mountain/zoning/article-viii-2.md index: https://georgiacommons.org/code/local/pine-mountain.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-14 edition_date_kind: retrieved source_publisher: city website version_id: local-code:pine-mountain/zoning/article-viii-1@2026-11-14-6474d86116 --- # Pine Mountain Zoning Ordinance, SECTION 1 (Article VIII). EXISTING LOTS OF RECORD > As posted on the city's website, retrieved 2026-11-14 Part of: Article VIII - EXCEPTIONS AND MODIFICATIONS Any lot or parcel of land in any district owned at the date of adoption of this Ordinance, or amendment thereof, not adjoining undeveloped land under the same ownership may be used as a building site even though such lot or parcel fails to meet the minimum requirements for lot area, lot width, or both. With respect to such lots or parcels, yard requirements and other requirements shall be subject to the following: 1.1 Meet applicable setback requirements. 1.2 Not to exceed the maximum lot coverage.