--- title: Pooler Zoning Ordinance, Section 11 (Appendix A, Article V). Traffic impact collection: local-codes id: local-code:pooler/zoning/appendix-a-article-v-11 cite_as: Pooler, Ga., Zoning Ordinance, Appendix A, Article V, ยง 11 canonical_url: https://georgiacommons.org/code/local/pooler/zoning/appendix-a-article-v-11 md_url: https://georgiacommons.org/code/local/pooler/zoning/appendix-a-article-v-11.md text_url: https://georgiacommons.org/code/local/pooler/zoning/appendix-a-article-v-11/text source_url: https://library.municode.com/ga/pooler date: 2026-11-11 status: active jurisdiction: city:pooler jurisdiction_name: Pooler place_fips: "1362104" corpus_version: local-codes-pooler-3020d91f8764 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/pooler/zoning/~appendix-a/~article-v.md previous: https://georgiacommons.org/code/local/pooler/zoning/appendix-a-article-v-10.md next: https://georgiacommons.org/code/local/pooler/zoning/appendix-a-article-v-12.md index: https://georgiacommons.org/code/local/pooler.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:pooler/zoning/appendix-a-article-v-11@2026-11-11-2a0cb114d4 --- # Pooler Zoning Ordinance, Section 11 (Appendix A, Article V). Traffic impact > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - ZONING / Article V - PROCEDURES FOR ADMINISTRATION AND ENFORCEMENT To protect the health, safety, and general welfare of the community, it has been determined to be necessary to adopt the following traffic impact requirements for the transportation system of the City of Pooler. Transportation is paramount to any community and studies shall be conducted to promote continued mobility of the system and provide improvements when adverse impacts arise. The traffic impact ordinance shall establish a minimum standard of traffic operations for the transportation system and provide for an administrative process to assure that no development is undertaken that would result in a lowering of the level of traffic operations below that established minimum standard. Dependent upon the impacts generated by the development, one of the following submissions will be required. (A) Technical memorandum. A technical memorandum is required when the project is likely to add less than 100 peak hour trips, and the adjacent intersection(s) are presently estimated to be operating at Level of Service (LOS) E or F. The scope for preparing a technical memorandum, which is a significantly scaled-down version of a traffic study, must be reviewed and approved by the City of Pooler. At a minimum, the potential impacts to intersections adjacent to the project should be evaluated. The technical memorandum shall be prepared under the direction of, and signed by, a professional engineer, registered in the State of Georgia to practice either traffic or civil engineering. (B) Traffic impact study. Shall be prepared under the direction of, and signed by, a professional engineer, registered in the State of Georgia to practice either traffic or civil engineering. A traffic impact study, if required, must be performed in accordance with the general guidelines recommended in the Institute of Transportation Engineers (ITE) publication, Traffic Access and Impact Studies for Site Development, unless otherwise specified in this article or as directed by the city. A traffic study must include the projected traffic from all previously approved projects that are not yet in place at the time of the study. The extent of the study area must be clearly defined by the developer and approved by the city prior to actually initiating the study. And the study must, as a minimum, include a thorough analysis of the A.M. and P.M. peak-hour traffic over the study area. (1) Study warrants. A traffic impact study shall be required if one of the following conditions is met: a. Land use intensity warrant. This warrant is met when 175 residential lots or 100 peak hour trips are generated as defined in the ITE publication, Traffic Access and Impact Studies for Site Development. b. Level-of-service warrant. This warrant is satisfied when Level of Service (LOS) "D" exists on the adjacent street, or the proposed development causes the LOS to drop to a "D". LOS determination should be in accordance with the procedures described in the Transportation Research Board Highway Capacity Manual. c. Roadway modifications warrant. This warrant is met when the proposed development is expected to significantly impact a road segment identified for improvement in the Transportation Improvement Program. It is also met when projected traffic will require modifications to the roadway system, such as turn lanes and deceleration lanes, to accommodate site generated traffic. d. Special cases. This warrant is satisfied when traffic generated from the development compromises the existing roadway system and may create safety, operational or other traffic problems in the vicinity of the site. This includes, but is not limited to, proposed driveways located within the functional limits of intersections, sight distance restrictions, requests for median openings, and recurring accidents on the adjacent street. (2) Study procedure. The impact study should be conducted under the supervision of a licensed and experienced traffic/transportation engineer. The study report will need to be certified and is the responsibility of the developer. Required components of a traffic impact study are: a. Land uses. A description of the land uses in the proposed development and any known proposed uses for other property in the surrounding area. b. Existing transportation system. A description of the existing transportation system with the study area and its existing capacities and structural ability to carry the additional traffic being generated. c. Trip generation. Trip generation estimations of the daily vehicular traffic, street am and pm peak hour volumes, and site am and pm peak hour volumes are to be obtained using the most recent edition of the ITE Trip Generation manual. Adjustments must be made for pass-by trips and mixed-use internal capture. d. Trip distribution. Show method of trip distribution on existing street roadway network. e. Recommendations. Identify measures to be implemented by the developer to mitigate the traffic impact, including onsite, proposed entrances and offsite roadway improvements. f. Improvement analysis. Show proposed programming of physical and operational improvements to accommodate site traffic. Additional analysis may be required and is site specific. This information includes: (i) Traffic signal warrant analysis using the FHWA Manual on Uniform Traffic Control Devices. The analysis (ii) Internal circulation and parking. Safety analysis which may include accident experience, restricted sight distance, pedestrians and bicycles. (iii) Capacity analysis and required storage at all proposed access points and intersections within the study area, using the current edition/version of the Highway Capacity Manual/Software. (iv) Neighborhood impacts, including cut through traffic, increased delay and proposed mitigation. (v) Distance from existing median openings if a median opening is being requested. (vi) Queuing if the proposed driveway is with the functional limits of an intersection. (vii) For an unsignalized intersection, the average total delay per vehicle shall not exceed 45 seconds. (viii) For a signalized intersection, the volume to capacity composite ratio shall not exceed 1.10 and the average total delay per vehicle shall not exceed 60 seconds. (ix) The delays referred to in (8) and (9) above shall be calculated according to the methodology described in the Highway Capacity Manual, latest edition. (3) Evaluation and determination. Each required traffic impact study will be evaluated by the city as to its technical accuracy and its impact on the established minimum standard of traffic operations. The cost of this evaluation shall be reimbursed to the city by the developer; and each evaluation shall produce a determination that a proposed project either complies with the standard or it does not comply. a. If it is determined that a proposed project complies with the established minimum standard of traffic operations, a development permit shall be issued for the project, provided it meets all other applicable city codes and ordinances. b. If it is determined that a proposed project will not comply with the established minimum standard of traffic operations, the developer may: (i) Reach an agreement with the city on a plan to mitigate the negative impact the project will have on traffic; or (ii) Delay implementation until traffic is reduced in the corridor by other capital improvements to the point where the proposed project complies with the established minimum standard of traffic operations. (iii) If a developer reaches an agreement with the city on a plan to mitigate the negative impact of a project in accordance with b.(i) above, a development permit shall be issued for the project, provided the mitigation plan is fully implemented as a part of the permitted work, and provided the project, including the mitigation plan, meets all other applicable city codes and ordinances. (iv) If a developer delays implementation of a project in accordance with b.(ii) above, a development permit shall be issued for the project upon completion of other capital improvements that reduce traffic to the point where the project is able to comply with the established minimum standard of traffic operations, provided the project meets all other applicable city codes and ordinances, as well as all other portions of this article. (4) Expiration of determination. a. For any project for which a traffic impact analysis is required by this article, a traffic impact determination must be issued prior to final site plan approval or preliminary plat approval. That determination shall expire if a developer fails to secure a development permit for the project within 90 days of the date the determination is made. b. A traffic impact determination shall expire if a developer fails to initiate construction on a project within 90 days of the issuance of a development permit. c. A traffic impact determination shall expire if a developer ceases work on a project for more than 60 consecutive days after a development permit is issued. d. If a traffic impact determination expires for any of the above reasons, the developer, if he wishes to pursue the proposed project, shall be required to repeat the entire analysis and evaluation process, and shall have no vested rights as a result of the expired determination.