Pulaski County · Zoning Ordinance
Appendix B - LAND DEVELOPMENT REGULATIONS / Chapter 13 - SOLAR ENERGY SYSTEMS
Section 13.9. Maintenance and Upgrades.
About this text
- As published by Municode, current through 2023-06-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Where an existing permitted SES is either undergoing routine maintenance or being upgraded, in a manner that does not to increase the footprint, power output, light reflectivity, impervious surface, risk to animals and vegetation, or otherwise affect the health, safety and welfare of the neighboring or nearby property, no additional zoning review shall be required. However, an updated decommissioning plan shall be filed and signage shall be updated within three (3) days of the upgraded facility being brought on line for power generation.
(b) In regards to an SES operating prior to the effective date of this Ordinance:
(i) If the SES is undergoing routine maintenance, and otherwise does the footprint, power output, light reflectivity, impervious surface, risk to animals and vegetation, or otherwise affect the health, safety and welfare of the neighboring or nearby property, no additional zoning review shall be required.
(ii) If the SES is receiving an upgrade, the entire system shall be evaluated as a new application under the relevant sections of both this Ordinance and Residential/Agricultural Ordinances of Pulaski County.
(c) Pulaski County Building Code Official, or their designee, shall be the sole determiner of fact as to whether proposed maintenance or upgrades increase the footprint, power output, light reflectivity, impervious surface, risk to animals and vegetation, or otherwise affect the health, safety and welfare of the neighboring or nearby property.
History
(Ord. No. 2021-1, § 9, 5-3-2021)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.