Construction plans shall be prepared for all required improvements. Plans shall be drawn at a scale of no more than one inch equals 100 feet and details at a scale sufficient for the purpose. Plans sheets shall be the same as used for the plat or site development. Construction plans shall include: (a) Cover sheet. The cover sheet shall contain: (1) The name of the development. (2) The owner's name, address and phone number. (3) All endorsements required under section 28-55. (4) A site location sketch to aid in location of the subdivision. (5) A revision block that shows the date and description of all revisions and the initials of the person making the revision. The format for the revision block is: revision date, description of revision, and name of person who checked and approved the revision. (b) Plan sheets. Plan sheets showing all street alignment, station number, curve data, angles of intersections, curb and gutter locations, sidewalks and improvement location. (c) Profile sheets. Profile sheets showing all proposed and existing elevations and vertical curve data along the centerline of all streets. (d) Utility plans sheets. Plan sheets showing the location, size and specification of all water, sewer and natural gas and other utilities to be installed by the subdivider, or others showing connections to existing systems. (e) Grading and contour plan sheets. Plan sheets showing the proposed grading of existing and finished contours. The contour interval shall be two feet. (f) Construction detail sheets. Construction detail sheets showing the details of all construction to include, but not be limited to: road paving, cross sections, sewers details, fire hydrants, thrust blocks, dams, retention ponds, retaining walls, junction boxes, pavement patches, culverts, sidewalks, French drains, ditches, slope protection, energy dissipation pads and other details needed to clarify the requirements of the design. The designer shall use state DOT standards available to simplify the construction. (g) Road construction and/or road closure permit. A permit to modify or alter a county road and/or to temporarily close a county road must be obtained from the planning and development department. Any such modification or alteration must conform to section 28-67 of the chapter and the county must be indemnified against any loss, liability or expense in connection with the road construction or temporary road closure. (h) Seal of engineer. Each construction plan profile, detail and cover sheet shall bear the seal and signature of the registered engineer under whose supervision the design was done. (i) Fee. Required processing fee as found in the schedule of fees.