The director, using the construction drawings, shall conduct a field inspection of the subdivision or development. If there are deviations from the approved drawings deemed by the director to be significant, the director shall require the developer to submit revised drawings and/or engineering studies (as appropriate), reflecting the changes. The changes shall be further reviewed for compliance with the original approval and comments of the TRC. Once the director is satisfied that compliance has been achieved, the developer shall be notified that a final plat may be submitted. A satisfactory inspection of a site development shall cause the director to issue a certificate of completion letter to the developer, stating the development has met all applicable requirements.