(a) Minimum lot size: 43,560 square feet (one acre). (b) Minimum lot width at the building setback line: 100 feet. (c) Minimum setback requirements are as follows: (1) Front setback: 30 feet. (2) Side setback: 15 feet. (3) Rear setback: 20 feet (4) Setback from Lake Sinclair, Lake Oconee, creek or river: 65 feet. (5) A 50-foot buffer is required when any commercial use or district adjoins any residential use or district. (6) State highway/main arterial road: 50 feet. (d) Maximum height of structures: 45 feet from the highest point of the grade. (e) Basic parking requirement: One space per each 200 square feet of space designated for retail sales. See chapter 28, development regulations, for other commercial uses. (f) Maximum lot coverage by buildings: 35 percent. (g) Buffer requirements. (1) A berm or a 50-foot buffer is required when any commercial use or district adjoins any residential use or district and shall be included within the required setback. (2) Additional buffer and screening requirements may be required based on use in accordance with article III, performance standards. (h) Maximum commercial floor area is computed at 25,000 square feet per acre. (Res. of 7-17-2007(4); Amend. of 3-18-2008; Amend. of 4-17-2012(2); Amend. of 9-17-2013(2); Ord. of 12-4-2020(1); Ord. of 12-3-2021(1))