Skip to content
Georgia Commons
Menu

Putnam County · Zoning Ordinance

Appendix C - MEDIA PRODUCTION

Sec. 12. High impact activity standards.

About this text

  • As published by Municode, current through 2026-02-17
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

In addition to the general standards, the following minimum standards shall be met in order to be permitted as a high-impact activity. Due to the varying requirements of media productions and nature of the industry, these standards are not intended to be all inclusive and additional conditions may be reasonably imposed, as warranted, to minimize anticipated adverse effects.

a. No permit shall issue for a term of less than 15 consecutive days from its date of issuance; the duration of the permit shall be based upon an agreed production schedule submitted by the applicant. Permits may be extended for reasonable cause.

A single application shall include all production locations for the same production within the county. Application shall be made no less than ten business days prior to the first scheduled event or day of filming. The permit shall be available displayed, on location, at all times while activity is occurring and made available to county and/or city inspectors upon request.

b. Normal hours of high impact media production activity shall be 7:00 a.m. to 10:00 p.m. daily; all preparation and wrap-up shall occur within one hour of this time frame. Noise shall be kept to a minimum.

c. Street closure(s), obstruction or interference with normal traffic flow, including pedestrian use of sidewalks and public rights-of-way shall be detailed in the application, including any use of on-street parking spaces and/or parking in alleys or side streets.

d. The county and/or city shall not intervene on behalf of any permittee or negotiate access rights to private property with property owners; the permittee is expected to deal directly with private property owners for required permission and consent.

e. Facilities and locations to be used for base camp, food service, and parking shall be approved as a condition of the permit; any other required state or local government permit(s) shall be obtained prior to issuance of the permit under this chapter.

f. Based upon the proposed scope of production activity and in consideration of any potential danger to the safety, health and welfare of the community, particularly private property and residents near the production location, the Sheriff of Putnam County, director of public safety for the city, and/or county fire department/marshal may require on-site security (qualified private security or use of off-duty law enforcement officers) and/or may require personnel and equipment be placed on standby for portions of the high-impact activity at the expense of the applicant. The application shall detail the planned time, place, and manner of any of the following production activities: automobile crashes or chases, gunfire (including simulated gunfire), fire, pyrotechnics, explosives, the use of aircraft (including drones and similar remotely controlled aircraft), stunts, non-domestic animals, and similar activities.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:putnam-county/zoning/appendix-c-12@2026-02-17-bcde281666

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Putnam County Zoning Ordinance, Sec. 12 (Appendix C). High impact activity standards | Georgia Commons