Skip to content
Georgia Commons
Menu

Rabun County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 56 - ZONING / Article V - USE REQUIREMENTS FOR INDUSTRIAL DISTRICTS

Sec. 56-102. Restricted industrial district (M-I).

About this text

  • As published by Municode, current through 2025-04-22
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Within the restricted industrial district (M-I), the following uses shall be permitted:

(1) Warehousing, wholesaling, storage or light manufacturing uses.

(2) Bottling works.

(3) Large sawmill. Those sawmill operations having more than five full-time or part-time employees; operating more than 1,700 hours per year; occupying more than two acres including the lumberyard; or having a drying kiln.

(4) Coal or wood yard.

(5) Storage of petroleum products, but only after the location of the premises have been approved by the fire chief; and further provided that any residence shall not be located within 500 feet of the location.

(6) Textile manufacturing or processing.

(7) Fabrication of wood and metal products.

(8) Industrial and manufacturing plant where the process of manufacturing or the treatment of material is not objectionable because of dust, odor, gas, smoke, vibration, lighting or noise.

(9) Truck or transfer terminal or freight house, or bus garages and repair shop.

(10) Ice manufacturing plant.

(11) Laboratory; experimental, film and testing.

(12) Assembly plant.

(13) Quasi-public service uses. Utility company facilities on premises which are necessary for the convenience and general welfare of the public, such as telephone exchanges, pump houses, transformer substations, pressure reducers, cable easements, etc. Such structures shall be architecturally harmonious with the general character of the surrounding area, shall be enclosed by proper fencing and shall be suitably landscaped.

(14) Power plant, private. Any facility that uses one or more energy sources, including water powers, fossil fuels, biofuels, fuel cells, photovoltaic systems, solar power or other means of electrical generation, to provide electrical generation, to provide electrical energy and/or steam, including equipment, fuel storage and other support

facilities related to such power plant. Any such power plant, whether used off-grid or on-grid, shall have a peak generating capacity of not more than 20 megawatts.

History

The history line the source prints at the end of the section.

(Ord. of 8-28-2007(1), § 71; Ord. of 11-27-2007)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:rabun-county/zoning/56-102@2025-04-22-4bf85ca3ce

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.