Reynolds · Zoning Ordinance
Appendix A - ZONING § 5.4[14] / Article 11 - PROCEDURES FOR SUBDIVISION PLAT APPROVAL / Division 2 - REQUIRED SUBDIVISION IMPROVEMENTS
Sec. 11.20. Installation of utilities.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(1) Water. Water mains for both domestic use and fire protection shall be properly connected with the public water system or with an alternate water supply approved by the Taylor County Health Department. The lines shall be constructed in such a manner as to serve
adequately all lots shown on the subdivision plat. The lines shall be installed in conformance with the technical standards as established by the Board of Commissioners, or other local governments.
(2) Sewer. A publicly connected sanitary sewer system shall be installed where said system is available from a public agency subject to regulation by the City government, or as the result of a contract between government and another public agency or body. Where lots cannot be economically connected with a sewerage system, they must contain adequate area for the installation of septic tank and disposal fields approved by the Taylor County Health Department. All sewer facilities shall be installed in accordance with the standards of the Department of Public Health of the State of Georgia and the City of Reynolds.
(3) Gas. When gas mains are connected with the gas distribution system the lines shall be installed in such a manner as to serve adequately all lots shown on the subdivision plats. The gas lines shall be constructed in conformance with the technical Standards established by the local governments.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.