(d) Elevations at all center line intersections of streets, at all street center line intersections with boundaries of subdivision, at all culverts and storm sewer crossings, and at all curb inlets. (6) When proposed street is an extension of, or connecting with, an existing street or road, show existing center line profiles for two hundred feet (200') minimum distance to ensure proper grade tie. (7) If a difference exists in elevations or proposed curb grades, identify curb elevations at top of right curb, and top of left curb. (8) If a cul-de-sac is to be used as a temporary turnaround at the temporary end of street the proposed grade and existing profiles shall be carried through to provide for the future extension of the proposed street, i.e., 300' beyond the property line. (9) When a proposed street parallels or is located near an existing stream or open drainage way, furnish profiles of top of bank or stream computed water elevations and invert (or flow line) of stream or open drainage way. Show relation of proposed street grade to existing profiles of stream or open drainage way. Street construction must not encroach on the floodplain limit of the stream and must be designed to be not less than two (2) feet above the projected 100-year Flood High Water elevation. (10) Show proposed culvert or storm sewer crossings and sanitary sewer crossings at the proper location and grade on all street profiles. (11) Storm sewer to be shown in profile with the following required information: (a) Profile of proposed finished grade. (b) Profile of existing ground at center line of storm sewer. (c) Percent of grade of proposed storm sewer. (d) Size of proposed pipe or structure. (e) Station to be shown every one hundred feet (100') and at all appurtenances. (f) Show curb inlets, etc., with proposed elevations for the tops and inverts, or tabulation in plain view may be permitted if all structures are identified. Show all existing stream crossings. (12) Profiles of streams that are not to be piped shall include: (a) Profile of top bank on both sides where difference in elevation exists. (b) Profile of flow line (invert) of stream bed. (c) Profile of computed water elevation. (d) Where land included in subdivision is subject to flood, cross-sections, topography and spot elevations will be required as part of the floodplain study. Floor elevation for all residential dwellings shall be at least three (3) feet above the 100-year flood level. (13) Show existing ground at center line and proposed computed grade of invert on all streams where relocation of channel is proposed. (14) Give datum reference for elevations used. Additional Details: (15) A registered Engineer's current stamp will be on all sheets, together with the necessary certificates for same required by Georgia State Board of Professional Engineers and Land Surveyors. (16) The developers' names, addresses, and telephone numbers. (17) Proposed layout including lot lines with dimensions, lot numbers, block letters, proposed street names, right-of-way widths, street widths indicated clearly from either face to face or back to back of curb lines (specify); and easements for sanitary sewer, storm water drainage, or pedestrian access. (18) Location and results of percolation tests for lots not to be served by sanitary sewers as required by the Taylor County Health Department. (19) Location of land subject to flooding, indicated by a flood crest contour (100-year floodplain). (20) Location of all sanitary sewer lines and laterals with appurtenances (specify type). (21) Location of tract showing Land District and Land Lot, giving acreage of tract being developed. (22) Any request for deviations from the above regulations or any questions concerning these, or the Code or the Standards will be addressed to the Engineer. (23) All plans shall show the total length of paved roads being dedicated as a Public Road. This figure, along with other applicable road construction items, will be used in establishing the value of the maintenance bond. (24) Plans will not be accepted for review by the Zoning Administrator unless accompanied by signed certificate from a registered professional engineer certifying that all the items above have been complied with or showing by itemized list where approved deviations exist. (25) The Engineer will be given a definite date by the Developer as to when construction is to begin and the anticipated time duration or the contract.