Section 1. Permits required for construction.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The following is a list of permits needed for construction of a building or structure or the movement of a building or structure in the city.
(A) Building permit. A building permit issued by the zoning administrator is required in advance of the initiation of construction, erection, moving, location, relocation or alteration of any building or structure. All applications for building permits shall be accompanied by a plat or plan in duplicate, drawn to scale, showing the actual dimensions of the lot to be built upon, the size of the building to be erected, the location of the building on the lot, the number of dwelling units the design is to accommodate, and such other information as may be essential for determining whether the provisions of this ordinance are being observed. A record of such application and plats or plans shall be kept by the zoning administrator. A building permit is also required for swimming pools, fences, and lawn irrigation systems.
(B) Relocation permit. A relocation permit is required any time a manufactured home, mobile home, trailer, out building, house or structure is moved from any location to any lot or parcel within the city limits of the city. Electrical, mechanical and plumbing permits are included within this permit. Buildings used for the purpose of storage only with no need for electricity or plumbing, and which are erected on no permanent foundation, and with a floor area of less than 120 square feet are exempt from this requirement.
(C) Sign permit. Prior to the erection of a sign for either on premises or off premises advertising, the zoning administrator must first issue a permit in accordance with the sign regulations set forth in article VI of this ordinance. Permits are required for both temporary signs as well as permanent signs.
(D) Demolition permit. Prior to destruction of a building, structure, or sign, a demolition permit is needed. Such permit may be obtained from the city zoning administrator.
(E) Electrical permit. An electrical permit is needed before installing any electrical wiring or fixtures. This permit is not needed if a re-location permit or building permit has already been issued on the structure, nor shall this permit be required if the electrical work performed:
1. Involves less than 25 percent of the existing electrical system; and,
2. Involves no new construction.
(F) Plumbing permit. A plumbing permit is needed before installing any plumbing or fixtures. This permit is not needed if a re-location permit or building permit has already been issued on the structure, nor shall this permit be required if the plumbing work performed:
1. Involves less than 25 percent of the existing plumbing; and,
2. Involves no new construction.
(G) Mechanical permit. A mechanical permit is needed before installing any mechanical device or fixture. This permit is not needed if a re-location permit or building permit has already been issued on the structure, nor shall this permit be required if the mechanical work performed:
1. Involves less than 25 percent of the existing mechanical system, and;
2. Involves no new construction.