(a) All telecommunication antennas and towers shall require a permit issued pursuant to the requirements of this article. Prior to review and decision regarding a requested permit, a complete application shall be filed with the department of public services and engineering. Said application shall provide all of the following information and documentation and meet each of the standards set forth below. No application shall be deemed complete and filed until all of the following information has been provided. (b) A survey drawing or plat of the entire tract, sealed by a surveyor registered in the State of Georgia, showing the location of all lot lines, leased areas, easements, access points, structures, screening and landscaping existing on site, and including a metes and bounds legal description of the entire tract. (c) A site plan, prepared and sealed by an appropriate licensed professional, to scale, specifying the location and all dimensions of the telecommunications facilities, as well as all other improvements, height of facilities, topography using two-foot contours, setbacks, transmission building and/or other accessory uses, access, drives, parking, fences, landscape plan, and all land uses within 500 feet of the exterior boundary of the leased area or proposed tower site. (d) Scaled elevations showing the impact of the proposed telecommunications facility. If the proposal is for a tower, the applicant shall also arrange a balloon test with department of public services and engineering staff, to be conducted at a date and time coordinated by staff, physically demonstrating the actual height and location of the proposed tower. (e) A full description, including photographic exhibits, of the environment surrounding the proposed telecommunications facility, including all residential structures and zoning districts within 500 feet of the exterior boundary of the leased area or proposed telecommunications facility site, existing tree coverage and general topography within said distance, and any districts, structures or sites of historic significance. (f) A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance. (g) A report from a qualified engineer licensed in the State of Georgia, documenting each of the following: (1) Telecommunications facility height and design, including technical, engineering, economic, and all other pertinent factors governing selection of the proposed design and demonstrating that the proposed facility would provide the required coverage or capacity; (2) Total anticipated capacity of the telecommunications facility, including number and types of antennas which can be accommodated; (3) Evidence of structural integrity of the telecommunications facility; and (4) Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris should a failure occur. (h) The identity of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility, including name, address, telephone number, facsimile number, electronic mail address and pager number. (i) Identification of the geographic service area to be served by the subject installation, including accurately scaled color radio frequency (RF) plotted maps showing the applicant's existing network including the proposed site as well as the nearest or associated telecommunications facility site within the network, proposed coverage, and the existing network overlaid with plots of all potential co-location sites and containing sufficient engineering data to show that said sites would not be feasible to fill significant, required service gaps. (j) A site inventory and five-year facilities plan including the following: (1) An inventory of all the applicant's existing and proposed telecommunications facility sites within Rockdale County and within one-half mile of the border thereof, and a map showing each of these sites. If no such sites are located within one-half mile of the border, the applicant's inventory shall include the applicant's nearest facility in each adjoining jurisdiction. The list must include (1) street address, land lot, section, district, and parcel number; (2) zoning district; (3) type of building or structure and number of stories or height; (4) the number of towers, antennas and base transceiver stations per site, the location and type of antenna installation, and the location of the base transceiver station installation(s); (5) the telecommunications facility height and (6) the radio frequency range of megahertz, the wattage output of the equipment and effective radiated power. (2) If the applicant does not know specific future tower and antenna site locations but does know of areas where telecommunications facilities will be needed within the next five years to provide service, the applicant shall list the land lots contained within the anticipated geographic service area and identify each geographic service area with a number that will correspond to the future telecommunication facility site. (k) Applicants for towers must identify all existing towers, and major structures potentially capable of supporting telecommunication equipment, and all towers for which there are applications currently on file with the department of public services and engineering which are located within the applicant's search area. This shall include a description of the distance and location of all such tower and structure sites, both within and outside the applicant's network. Evidence shall be submitted which demonstrates that no existing or pending tower or major structure can accommodate the applicant's proposed antenna and shall consist of analysis of the following: (1) No such towers or structures are located within the geographic area required to meet applicant's engineering requirements; (2) Such towers or structures are not of sufficient telecommunications facility height to meet applicant's engineering requirements and cannot be adequately modified; (3) Such towers or structures do not have sufficient structural strength to support applicant's proposed antenna and related equipment and can not be adequately modified; (4) Such towers, structures and existing tower sites lack space to locate the proposed antenna or to construct a tower for the proposed antenna; (5) The applicant's proposed antenna would cause electromagnetic interference with the antenna on such towers or structures, or the antenna on such towers or structures would cause interference with the applicant's proposed antenna; and (6) The applicant demonstrates that there are other factors that render such towers and structures unusable. (7) If the evidence demonstrates co-location is feasible and if co-location on any such towers or structure would result in less visual impact than the visual impact of the proposed tower, applicant shall justify why such co-location is not being proposed. If co-location on any such tower or structure would increase negative visual impact, then the applicant must so state and demonstrate. Requests by the applicant to co-locate on existing towers and structures shall be in writing and said written requests as well as written denials of same are required and shall be included in the application materials. The county will review with special care justifications that rely upon undue expense and/or difficulties in entering into a lease agreement. The county shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site and on the surrounding area. (l) If the proposed site is zoned A-R, R-1, R-2, CRS, CSD, MUR, RM, MxD or W-P, applicants for towers shall provide evidence as to why alternate sites in the CID, NC, C-I, C-2, O-I, OBP, M-1 or M-2 zoning districts have not been proposed. If requests by the applicant to utilize said alternate sites have been denied, said denials shall be in writing and included in the application materials. The county will review with special care justifications that rely upon undue expense and/or difficulties in entering into a lease agreement. The county shall carefully weigh such claims, and the evidence presented in favor of them, against a tower's negative impacts at the proposed site and on the surrounding area. (m) In all zoning districts, applicants shall provide evidence demonstrating that they cannot provide adequate personal wireless communication service consistent with the requirements of their federal license without the use of a telecommunications facility at the specific location requested. (n) The applicant for a tower shall provide evidence establishing that the proposed tower constitutes the least intrusive means necessary to close significant service gaps or otherwise provide coverage mandated by the terms of their federal license. Statements shall be provided demonstrating that all alternatives have been investigated by the applicant, including alternative tower design, alternative technology, multiple smaller sized, less-intrusive towers, alternative locations, co-location opportunities for placement upon existing structures or buildings, and similar alternatives. (o) The applicant shall provide any other evidence necessary to establish compliance with each of the criteria set forth in this article IV. (p) The applicant shall provide any other information requested by the department needed to fully evaluate the potential impact of the proposed facility in accordance with the criteria set forth in this article IV. (q) In order to cover the actual cost to Rockdale County of reviewing these applications and obtaining expert opinion and studies, the following fees are hereby established. For those telecommunications facility applications requiring administrative approval, a fee of $1,250.00 shall be paid at the time of application. For telecommunication facility applications requiring a special use permit, a fee of $1,750.00 shall be paid at the time of application. If the actual cost to Rockdale County is greater than this fee, the applicant shall be billed for the difference and payment shall be made prior to the hearing before the board. In no case shall the maximum total charge exceed $3,000.00. (Ord. No. 0-2006-32, §§ 1—3, 11-28-2006; Ord. No. O-2025-27, § I, 11-10-2025)