(a) Applicability. This section applies to all subdivisions of property for non-residential use, all multi-phase subdivisions, and subdivisions of property for residential use other than those meeting the standards of section 302-22. (b) Process. All subdivisions not meeting the standards of section 302-22 shall be subject to the application, review, and approval procedures of this section, consisting of the preparation and approval of a preliminary plat, construction plans, and final plat. (c) Preliminary plat. (1) Application. a. Prior to any land disturbance activities or selling any lots, the developer shall submit a preliminary plat of the proposed subdivision to the department for review and approval. When multi-phase subdivisions receive prior approval as a whole in the concept plan stage, preliminary plat applications may be submitted individually for each phase. The application for approval of a preliminary plat shall be accompanied by the required fee and the following additional documents, as appropriate: 1. A natural resources plan, shall be required by the department. The natural resources plan shall include a map drawn at one inch = 100 feet that indicates the presence of streams, lakes, floodplain, wetlands, areas of vegetation, steep slopes, shallow or exposed rock, or other site resources or site hazards and the appropriate protection or mitigation measures that will be taken in development of the site. 2. A traffic impact study for developments that exceed the thresholds published by GRTA, or 200 lots, whichever is less, prepared in accordance with the standards and requirements of GRTA, or the Institute of Transportation Engineers. 3. Traffic calming plan, in accordance with the Rockdale County Traffic Calming Ordinance. b. The preliminary plat for a subdivision shall be in substantial conformity with the concept plan. c. The preliminary plat shall be prepared in accordance with this chapter and consist of the elements as described in section 302-61. After approval of the preliminary plat, the developer shall also provide copies of the preliminary plat to all utility companies serving the area. (2) Preliminary plat review procedures and standards. a. Preliminary plats prepared pursuant to this section shall be reviewed with respect to their consistency with the Rockdale County Comprehensive plan and conformity with each of the standards and requirements of this section and all other applicable sections of the UDO and state and federal regulations as they may be applicable. b. The applicant shall be responsible for compliance with all federal, state, and local codes, regulations, and zoning requirements and for the satisfaction of all of the noted and written comments of the department and related agencies reviewing the preliminary plat. c. Within 15 working days from receipt of the preliminary plat, the director d. shall coordinate the internal review of said preliminary plat with staff representing the disciplines of planning, zoning, transportation, stormwater, general engineering, GIS, water/sewer, environmental health, the Rockdale County Department of Communications, county arborist/ urban forester, and the fire marshal and other departments, as applicable. Review of natural resources plan, traffic impact study, and traffic calming plan. 1. Concurrent with review of the preliminary plat the director shall review the natural resources plan, traffic impact study, and traffic calming plan, if required. Such review shall assess the conformity with each of the standards and requirements of this chapter, chapter 332 and chapter 222. 2. If the natural resources plan, traffic impact study, or traffic calming plan is disapproved, the applicant shall revise and resubmit such document so that it meets the standards of this section and addresses the reasons for disapproval in a manner that is satisfactory to the director. 3. Approval of the preliminary plat shall be contingent on the director's approval of the natural resources plan, tree protection and landscape plan, traffic impact study, and traffic calming plan, if applicable. e. The director shall indicate on a review copy of the drawings or in a memorandum all comments related to compliance of the preliminary plat with this ordinance, principles of good engineering and design, conditions of zoning approval, and regulations of other county departments and state (3) agencies as appropriate. The director shall have final staff authority to determine the applicability of any and all comments of staff, and review agencies under these regulations or conditions of zoning approval. f. When the director has determined that the preliminary plat is in compliance with this UDO and approval has been received from all affected county departments and outside agencies having jurisdiction, the director shall deliver the preliminary plat to the planning commission for their review. Not less than seven days prior to the planning commission meeting at which the preliminary plat will be reviewed, the director shall notify the applicant of the time and place of the planning commission meeting by first class mail. Action on application. a. No more than 60 days following submission of the preliminary plat, the planning commission shall either approve or disapprove the preliminary plat unless the applicant consents to waive this requirement and consent to an extension. Otherwise, if the planning commission fails to take action within 60 days after the date of submission of the preliminary plat, then the preliminary plat shall be deemed to be approved. b. If approved, the chair of the planning commission shall sign such preliminary plat and certify approval on two copies of the preliminary plat. One copy shall be returned to the applicant and the other copy retained and made a part of the department's records. c. If the preliminary plat is disapproved, the director shall notify the developer in writing, within seven days of the planning comm1ss10n meeting at which it was reviewed, stating the reasons for disapproval. ( 4) Resubmission. If the preliminary plat application is disapproved, the applicant shall resubmit the preliminary plat and completed application form correcting all deficiencies, along with the appropriate resubmission fee. Failure to resubmit within 180 days shall require the applicant to submit a new preliminary plat. (5) Effect of preliminary plat approval. a. Approval of the preliminary plat shall be deemed an expression of approval of the layout of the subdivision to be used as a guide to the preparation of the final plat. b. Approval of the preliminary plat shall entitle the applicant to prepare and submit construction plans for site development and improvement as provided in article IV of this chapter 302 and to meet all other provisions of the UDO. c. The approval of the preliminary plat shall expire if a land disturbance permit for any required improvements has not been issued or a final plat has not been submitted for recording within 12 months of the date of approval of the preliminary plat.