(a) Approval of development conformance. Approval of development conformance shall be a prerequisite to the approval of a final plat or issuance of a certificate of completion or certificate of occupancy for any part of a project included in a land disturbance permit, except for single-family and two-family residential structures. The approval shall reflect certification that all site work and construction has been accomplished according to the terms of approved plans and permits, except when performance bonds have been authorized, and that all facilities intended for maintenance, supervision and/or dedication to the public are in compliance with appropriate standards, regulations, codes and ordinances. Such approval shall be revoked in cases of fraud or whenever unauthorized changes are made to the site without the benefit of required permits. (b) As-built drawings. Upon completion of the development activity as authorized by the land disturbance permit, and prior to final development inspection of public and private improvements, the developer shall submit to the department for review and approval a complete set of drawings prepared by a registered land surveyor in the state of Georgia showing "as-built" conditions. As-built drawings of water and sewer systems shall be provided to Rockdale Water Resources. See chapter 98. (c) Certification. (1) Upon completion of the project, the owner may request a certificate of completion or certificate of occupancy from the director. The certificate of completion or certificate of occupancy shall be in a form as provided by the director. (2) Following final inspection and approval of all as-built drawings, the director shall approve the certificate of completion or certificate of occupancy.