Rockdale County · Zoning Ordinance
Part II - CODE OF ORDINANCES / Part B - PLANNING AND DEVELOPMENT / Title 3 - DEVELOPMENT AND PERMITTING / Chapter 302 - SUBDIVISION AND SITE DEVELOPMENT STANDARDS / Article III - SUBDIVISION AND SITE DEVELOPMENT PLAN REVIEW PROCEDURES
Sec. 302-27. Procedures for revising final plats.
About this text
- As published by Municode, current through 2026-01-27
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) When it becomes necessary or desirable to revise a recorded final plat, the developer shall prepare a letter to the director documenting the reason for and extent of the revision and reproducible drawing(s) that contain the subject revisions along with a review fee determined by the board of commissioners. The revised plat shall
contain a new signature block, be dated with the current date, be drawn at an appropriate scale and contain notation(s) indicating the nature and location of the revision(s). The subdivision name, date and book and page number of the original recording shall be noted on the new plat; and the new plat drawings shall be designated as "revised final plat."
(b) All revisions shall be bound by the protective covenants, if any, recorded on the original final plat, and a statement to that effect shall be
noted on the revised final plat.
( c) If necessary, corresponding revisions to construction drawings, as-built drawings, engineering data and reports also shall be prepared, labeled appropriately, submitted, reviewed and
certified by the director, and filed in the department along with a review fee determined by the board of commissioners.
(d) The director shall forward the revised final plat and any related documentation to the appropriate departments or agencies that would be involved in checking the accuracy of the revision.
Upon receipt of approval from such other departments or agencies, the director shall certify the revised final plat and submit it to the board of
commissioners for ratification, as provided in subsection 302-26(b)(4) and (5).
(e) The approved revised final plat shall be recorded by the clerk of superior court and returned to the developer.
(f) Any revised plat that does not receive approval shall be returned to the developer with written notification stating the reasons for denial.
History
(Ord. No. 0-2006-32, §§ 1-3, 11-28-2006)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.