(a) Applicability. It shall be unlawful to commence the removal or disturbance of any natural resources; the excavation or filling of any lot for any construction of any building or structure, including accessory buildings or structures and supplemental uses or structures; or to commence the moving or alteration of any building or structure until the director has issued a building permit for such work. In applying to the director for a building or demolition permit, the applicant shall file two copies of a dimensioned sketch or to-scale plan signed by the owner or an authorized agent indicating: (1) The shape, size and location of the lot to built upon. (2) The uses, shapes, sizes, heights and locations of the buildings or structures to be erected, demolished, altered or moved, and of any building already on the lot. (3) The number of dwelling units the building is to accommodate. ( 4) The locations of buildings on adjoining lots within 50 feet of the property line and any other information concerning the lot or adjoining property. (5) Location of soil erosion and sedimentation control measures. (6) Landscaping, buffer and tree protection compliance, if applicable. (7) Any other information that may be essential for determining whether the provisions of this UDO will be observed. (b) Procedures. Building permits must be filed using an application available from the department and shall be accompanied by the appropriate fee. Along with the application, building plans must be reviewed and approved by the director prior to issuing any permit for any structure. (c) Standards of review. (1) The building plan filed with the building permit shall be consistent with the land disturbance permit. (2) The director shall further determine that either: a. All public improvements and installations to the development that are to be dedicated and are required for approval of the certificate of completion or certificate of occupancy under this chapter have been completed in accordance with the appropriate specifications; and b. All of the stormwater management facilities, soil erosion and sedimentation control measures, water and sewer utilities, street base and curbing construction required for approval of the certificate of completion or certificate of occupancy have been properly installed and comSupp. No. 6 CD302:26 pleted and, for those required public improvements not yet completed, within areas to be dedicated (grassing, pavement topping, required landscaping, sidewalks, etc.), a performance bond shall have been filed by the developer in accordance with the development performance and maintenance agreement as provided in section 302-28. (d) Applicable codes. Building permits for all structures or interior finishes shall be issued after meeting the applicable requirements of this UDO, the fire prevention codes and the various health, water, sewer and building codes of the county. (e) Sewage disposal. For any structure for which on-site sewage disposal will be provided, a permit issued by the health department shall be required prior to issuance of a building permit. For sites connected to public sewer, approval by Rockdale Water Resources will be required before issuance of a building permit. These requirements shall apply to new construction as well as changes in use or renovations that alter the type or intensity of existing sewer disposal. (f) Single-family and two-family dwellings. (1) A building permit for a single- or twofamily residence may be issued after the recording of a final plat or after the lot upon which the building is to be located has otherwise become a buildable lot of record. (2) The approval of a structure location plan may be required prior to issuance of the building permit as noted and conditioned on the final plat. For such lots a certificate of occupancy shall not be issued until conformance to the structure location plan has been field verified or shown on a certified foundation survey prepared by a registered land surveyor. See section 302- 66. (g) Issuance on conforming lots. (1) Building permits shall be issued only on conforming lots or nonconforming lots auSupp. No. 6 CD302:27 thorized in subsection 302-20(a)(3), except under special circumstances limited to and as specifically described below: a. In single-family detached and duplex residential subdivisions, building permits for no more than two model home buildings on specific individual lots may be issued after approval of construction drawings and after the approval of the fire marshal, the health department and subject to all limitations or requirements as may be established by the director. No certificate of occupancy shall be issued for the model home until the final plat, including the model building lots, has been approved and recorded. b. In non-residential subdivisions, the director may issue building permits on the basis of an approved preliminary plat and after a land disturbance permit has been approved reflecting the site development plan and construction drawings for specific buildings and associated site improvements. Issuance of any building permits shall be conditioned on the following: 1. Approval by the director shall be required prior to issuance of any building permit, which may include approval of an acceptable access, fire hydrant location and water pressure. 2. Approval of the health department for on-site sewage disposal or by Rockdale Water Resources for a building to be served by public sewer shall be required prior to issuance of any building permit. 3. Construction of the required public improvements shall not proceed concurrently with construction of the buildings without approval of the director and subject to development sureties as described in section 302-28. 4. No certificate of completion or certificate of occupancy shall be approved for any structure within the subdivision prior to recording of the final plat. (h) Expiration of building permit. (1) Any building permit issued shall become invalid unless the work authorized by the permit has commenced within 180 days of the date ofissue and continues to progress, or if the work authorized by the permit is suspended for a period of 180 days. (2) After a building permit expires, no further work, construction or use shall be permitted on the premises prior to resubmission. Resubmission of a building permit application shall require a resubmission fee, re-review and approval of a building permit for continuation of the work.